Loading...
ACHD No TIS Required V1From: Paiae Bankhead To: Ethan Mansfield Subject: RE: 6241 N Linder Rd Childcare Center Q? Date: Monday, August 8, 2022 11:32:19 AM Hi Ethan! Thank you for those details. ACHD won't require a traffic impact study for this since it's within the overall larger Linder Village development and an overall TIS was completed for this with the original Linder Village development application. Otherwise this one would trigger a TIS. I would verify with ITD if they need anything. Thanks! Paige Bankhead, PE Traffic Engineer Ada County Highway District Development Services 1301 N. Orchard St. Ste. 200 Phone: (208) 387-6293 03� & ato 50",40 From: Ethan Mansfield <emansfield@hcollc.com> Sent: Thursday, August 4, 2022 1:08 PM To: Paige Bankhead <pbankhead@achdidaho.org> Subject: 6241 N Linder Rd Childcare Center Q? CAUTION: This email originated from outside your organization. Exercise caution when opening attachments or clicking links, especially from unknown senders. Hi Paige, I am checking in to see if ACHD needs any analysis from us for a 10,000 SF daycare facility with up to 180 students/children (see attached site plan) We are proposing to provide 48 parking spaces on the site (below lists the typical parking provision this childcare center normally sees) I've include details of typical attendance/operation, taken directly from the childcare center's operational document at the bottom the email. Please note that the number of children total during average pick-up and drop-off actually equals 183. 1 am not sure why this is, because the operations doc lists cacluations as based of a center with 166 kiddos. I noticed that discrepancy and wanted to address it, as I think it is simply an error on their end. I believe the distribution of pick-ups/drop-offs is correct though. I hope that this helps you better understand the operations at this particular site. With the 80% occupancy and 20% multi -kid enrolled household, I come up with 115 single drop offs and 115 pick-ups if no one carpools. That's 330 trips spread out over a 6 hour period (3 hrs in the morning and 3 hrs in the evening.) I would imagine that most of these would be existing trips from parents going to/from work, although I am sure some work from home and just want some peace and quiet sans kids . Anyway, let me know what you all need from us if anything. Cheers, Ethan Capacity of the center • 166 - 180 children (varies per county and state licensing) Overall average enrollment • 80% Occupancy Part time children attendance • Typical center has 25% part-time students Families with siblings • Approximately 20% have one or more siblings attending Number of employees • Approximately 18 to 24 staff at any one time (24 is usually the max) • 30% Are part time Number of parking spots • 34 parking spots minimum with 40 as the norm Traffic • Each parent parks their vehicle in The Learning Experience parking area and brings their child into the center. Their child is checked in at the reception counter. Subsequently, the parent then brings their child to their designated classroom. The reverse of this occurs at pick up. • During drop off (average 5 minutes) generally between 6:30 am to 9:30 am During pick up (average 8 minutes) generally between 4:00 pm to 6:30 pm Traffic during drop off (average 5 minutes): ■ 6:30am-7:00am (13 children) ■ 7:OOam-7:30am (30 children) ■ 7:30am-8:OOam (40 children) ■ 8:OOam-8:30am (40 children) ■ 8:30am-9:OOam (30 children) ■ 9:OOam-9:30am (30 children) Calculations based on a center with the capacity of 166 Traffic during pick up (average 8 minutes): ■ 3:30pm-4:00pm (13 children) ■ 4:OOpm-4:30pm (32 children) ■ 4:30pm-5:OOpm (44 children) ■ 5:OOpm-5:30pm (44 children) ■ 5:30pm-6:OOpm (32 children) ■ 6:OOpm-6:30pm (18 children) Calculations based on a center with the capacity of 166 Ethan Mansfield I Hawkins Companies I Pre -Development Project Manager Direct: 208.908.5585 1 Cell: 208.921.46861 Fax: 208.376.8523 emansfield(&hcollc.com 855 W. Broad St., Ste. 300, Boise, ID 83702 A KINS C 0 M P A N I E S C O M M E R C 1 A L 1) E V E :. O P E R S https://www.hawkinscompanies.com/ PERFORMANCE CHARTED SCHOM GGWEWB HM https://performancecharterschooldevelopment.com/ CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe.