Loading...
PZ - Elevations KEYNOTES ® PRICE 1. ASPHALT SHINGLE RIDGE / HIP CAP. SEE ROOF PLAN FOR LOCATION AND TYPES OF ROOF ATTIC SANDERS VENTING. RHEES 2. ARCHITECTURAL LAMINATED FIBERGLASS ROOF SHINGLES. RUBY oL+40'-0"f 1 3. 6 X 12 PAINTED WOOD CORBEL. TOP Of ROOF 4. RAKE FASCIA: 1 X 4 PAINTED HARDBOARD FASCIA OVER 5/4 X 8 PAINTED HARDBOARD FASCIA. 2 PROVIDE PAINTED 5/16" HARDBOARD SOFFIT. OWNER OPTION: USE FIBER CEMENT FASCIA, AND 3 SOFFIT IN LIEU OF HARDBOARD. THI AR(HITE(TSOFFI(E C� 5. EAVE FASCIA: 5/4 X 8 PAINTED HARDBOARD. PROVIDE PAINTED 5/16" HARDBOARD VENTED SOFFIT 499 MAIN STREET (2 0 8) 3 4 3 2 9 31 4 AT EAVES. PROVIDE PRE—FINISHED METAL GUTTER AND DOWNSPOUT PER ROOF PLAN. FINAL 499 M IN STREET 83T T A 0 I D A H 0.C 0 1 LOCATION AND NUMBER OF DOWNSPOUTS (SHOWN DASHED) IS SHOWN SCHEMATIC ONLY AND IT TO 10 BE DESIGN—BUILD BY THE GENERAL CONTRACTOR. VERIFY FINAL LOCATIONS OF DOWNSPOUTS WITH +28'-11 7 8" OWNER. PROVIDE CONCRETE SPLASH BLOCK AT BASE. OWNER OPTION: USE FIBER CEMENT TOP Of PLATE 5 FASCIA AND SOFFIT IN LIEU OF HARDBOARD. 7 6. 5/4 X 12 PAINTED HARDBOARD TRIM. PROVIDE PREFINISHED 'Z' FLASHING AT TOP. OWNER OPTION: USE FIBER CEMENT TRIM IN LIEU OF HARDBOARD -Ell 8 7. 5/4 X 8 PAINTED HARDBOARD TRIM. PROVIDE PREFINISHED 'Z' FLASHING AT TOP. OWNER OPTION: USE FIBER CEMENT TRIM IN LIEU OF HARDBOARD. +19'-11 1 2" _ _ 10 8. 1 X 4 PAINTED HARDBOARD TRIM CORNERS AND TRANSITIONS, TYP. OWNER OPTION: USE FIBER THIRD f CEMENT TRIMS IN LIEU OF HARDBOARD. FINISH FLOOR 1 9. SHINGLE SIDING: PAINTED HARDBOARD SHINGLE STYLE SIDING. OWNER OPTION: USE FIBER CEMENT 2 SHINGLE SIDING IN LIEU OF HARDBOARD. 6 10. VERTICAL BOARD & BATTEN STYLE SIDING: PANTED 4' X 10' X 5/16" HARDBOARD PANELS WITH PAINTED 1 X 2 HARDBOARD BATTENS AT 12" O.C. OR PAINTED 1 X 3 HARDBOARD BATTENS AT +10'-0 1/8'_ _ FM i I 11 V-4" O.C. OWNER OPTION: USE FIBER CEMENT BOARD & BATTEN SIDING IN LIEU OF HARDBOARD. SECOND FLOOR 11. HORIZONTAL LAP SIDING: PAINTED HARDBOARD LAPPED SIDING WITH 6 INCH NOMINAL EXPOSURE. FINISH FLOOR 13 OWNER OPTION: USE FIBER CEMENT SIDING IN LIEU OF HARDBOARD. 12 12. PAINTED HARDBOARD COLUMN SIDING AND TRIMS. OWNER OPTION: USE FIBER CEMENT SIDING AND TRIMS IN LIEU OF HARDBOARD. LO 0 22 13. DECORATIVE EXTERIOR LIGHT FIXTURE. 14. STONE VENEER CAP. PROVIDE TRANSITION FLASHING PER MANUFACTURER. OL 0'-0" 23 FIRST FLOOR 15. STONE VENEER SIDING. 16. DOUBLE GLAZED VINYL FRAMED WINDOW PER WINDOW SCHEDULE WITH 1" X 6" PAINTED 7 19 21 21 20 11 16 14 15 16 17 18 HARDBOARD TRIM AT TOP AND BOTTOM, 1" X 4" PAINTED HARDBOARD TRIM AT SIDES. SEE WINDOW SCHEDULE DETAILS FOR FLASHING REQUIREMENTS. OWNER OPTION: USE FIBER CEMENT BUILDING TYPE 4B TRIMS IN LIEU OF HARDBOARD. PROJECT FRONT ELEVATION 17. EXTERIOR DOOR PER DOOR SCHEDULE WITH 1" X 6" PAINTED HARDBOARD TRIM AT TOP, 1" X 4" PAINTED HARDBOARD TRIM AT SIDES. SEE DOOR SCHEDULE DETAILS FOR FLASHING REQUIREMENTS. OWNER OPTION: USE FIBER CEMENT TRIMS IN LIEU OF HARDBOARD. SCALE: 1/8" = 1'-0" 18. DECK STRUCTURE PER DECK DETAILS WITH CONCRETE TOP, PAINTED HARDBOARD CEILING, PAINTED SOUTHRIDGE HARDBOARD TRIMS AND PAINTED STEEL GUARDRAIL. OWNER OPTION: USE FIBER CEMENT CEILING AND TRIMS IN LIEU OF HARDBOARD. 19. FIRE SPRINKLER RISER CLOSET WITH ASPHALT SHINGLE ROOF WITH PRE—FINISHED METAL APARTMENTS FLASHINGS, 1 x PAINTED HARDBOARD FASCIA, SIDING AND TRIMS AND PAINTED INSULATED METAL oL+40'-0"t 1 oL+40'-0"t 1 DOOR. VERIFY WITH SITE PLAN AND CIVIL DRAWINGS FOR LOCATION OF CLOSET. OWNER OPTION: TOP OF ROOF TOP OF ROOF USE FIBER CEMENT TRIMS IN LIEU OF HARDBOARD.2 2 20 WALL CATIONUNT ELECTRICAL PANEL OF ELECTRICAL PANELSLOTHEIRNUTI UTILITY VERIFY EARTH SITE PLAN AND CIVIL DRAWINGS FOR TEN MILE R D. Q 3 3 21. WINDOW LOCATION OF FIRST FLOOR IS ADJUSTED TO ACCOMMODATE UTILITIES, VERIFY WITH FLOOR OVERLAND R D. PLANS. 4 4 22. EXPOSED CONCRETE FOUNDATION WALL. MERIDIAN, IDAHO 5 5 23. FINISH GRADE, SLOPE AWAY FROM BUILDING AT 2% MIN. SEE GRADING PLAN. +28'-11 7 8" +28'-11 7 8" TOP OF PLATE g TOP OF PLATE 7 8 El GENERAL NOTES 10 10 A. ALL NOTES ON ELEVATIONS ARE TYPICAL AND APPLY TO ALL ELEVATIONS. 01L+119'-11 1 2 Li i 0111 1 2" -JILi[JiL 14 B. REFER TO CONSTRUCTION TYPE DETAILS SHEETS A10.0 AND A10.1 AND SPECIFICATIONS FOR THIRD FLOOR THIRD FLOOR ( ) FINISH FLOOR 15 FINISH FLOOR 15 ADDITIONAL EXTERIOR FINISH MATERIAL NOTES. C. ALL VISIBLE EXTERIOR FLASHINGS TO BE PRE—FINISHED METAL (DARK BROWN) U.O.N. ALL 11 11 CONCEALED METAL FLASHING TO BE GALVANIZED METAL. ALL EXPOSED CAULKING NOT PAINTED TO MATCH ADJACENT MATERIAL FINISH COLOR. 18 18 D. SUB—CONTRACTORS TO PROVIDE 12" X 12" MIN. SAMPLE OF ALL FINISH MATERIALS FOR OWNER'S +10'-0 1/8" 16 +10'-0 1/8" 16 REVIEW AND ACCEPTANCE PRIOR TO CONSTRUCTION. SECOND FLOOR SECOND FLOOR FINISH FLOOR E. VERIFY ALL FINISH MATERIAL SELECTION AND COLORS WITH OWNER PRIOR TO ORDERING AND ❑ 12 FINISH FLOOR ❑ 12 INSTALLATION. 10 17 0 17 F. OWNER OPTION: HARDBOARD SIDING AND TRIMS TO BE ENGINEERED HARDBOARD OR FIBER CEMENT SIDING AND TRIMS. ALL SIDING AND TRIMS TO BE PRIMED (OR PRE—PRIMED), CAULKED PER SEAL 22 22 MANUFACTURER'S REQUIREMENTS AND AND PAINTED TWO FINISH COATS. G. ALL UTILITIES TO BE SCREENED OR BELOW GRADE. COORDINATE WITH MECHANICAL DRAWINGS AS 0'-0" 23 0'-0" 23 REQUIRED. FIRST FLOOR 161 FIRST FLOOR H. ALL FINISH MATERIALS TO BE INSTALLED PER MANUFACTURER SPECIFICATIONS, 2012 IBC ` 13 12 17 16 6 13 12 17 16 6 REQUIREMENTS AND PER GENERALLY ACCEPTED CONSTRUCTION PRACTICES. BUILDING TYPE 4B BUILDING TYPE 4B EXTERIOR FINISH SCHEDULE 2 LEFT SIDE ELEVATION RIGHT SIDE ELEVATION ALL BUILDINGS Q SCALE: 1/8" = 1'-0" 3 SCALE: 1/8" = 1'-0" MATERIAL MFR / COLOR MATERIAL FINISH COLOR This document is the property of THE ARCHITECTS MANUFACTURER: GAF OFFICE,PLLC and is not to be duplicated without ASPHALT SHINGLE COLOR: TIMBERLINE NATURAL VINYL WINDOW FRAME MANUFACTURER: written authorization. SHADOW: BARKWOOD COLOR: ALMOND ©THE ARCHITECTS OFFICE,PLLC PAINTED HARDBOARD MFR: SHERWIN WILLIAMS COLOR: CLEAR OL+40'-0"± 1 FASCIA & SOFFIT PAINT NUMBER: SW6148 WINDOW GLAZING INSULATED FILE TOP OF ROOF COLOR NAME: WOOL SKEIN DATE 2 PAINTED HARDBOARD DOOR & MFR: SHERWIN WILLIAMS POWDER COAT MAY 5, 2017 WINDOW TRIMS, BELLY BANDS, PAINT NUMBER: SW6148 METAL RAILING COLOR: BLACK 3 COLUMNS, CORBELS, ETC. COLOR NAME: WOOL SKEIN FILE NO. PRE—FINISHED METAL COLOR TO MATCH METAL STAIRS POWDER COAT 15-303 DD5.0 4 GUTTER & DOWNSPOUT SW6148 / WOOL SKEIN STRINGERS & RAILING COLOR: BLACK 10 DRAWN +28,_11 7 8" MFR: — COUNTRY CULTURED EXPOSED METAL FACTORY PRE—FINISHED MATT RHEES TOP OF PLATE 5 STONE VENEER STONE — C LEDGESTONE: ASPEN FLASHING COLOR: DARK BROWN 7 REVISIONS LE E COLOR PALLET A 8 MATERIAL MFR / COLOR MATERIAL FINISH COLOR 01L+19'-11 1 2" 10 PAINTED HARDBOARD MFR: SHERWIN WILLIAMS MFR: SHERWIN WILLIAMS THIRD FLOOR SHINGLE SIDING OR BOARD PAINT NUMBER: SW2845 PAINTED HARDBOARD PAINT NUMBER: SW7680 FINISH FLOOR 1 & BATTEN SIDING COLOR NAME: BUNGLEHOUSE GRAY LAP SIDING COLOR NAME: LANYARD 2 COLOR PALLET B 6 MATERIAL MFR / COLOR MATERIAL FINISH COLOR +10'-0 1/8. I Ll 11 PAINTED HARDBOARD MFR: SHERWIN WILLIAMS PAINTED HARDBOARD MFR: SHERWIN WILLIAMS SECOND FLOOR SHINGLE SIDING OR BOARD PAINT NUMBER: SW7718 PAINT NUMBER: SW7509 FINISH FLOOR 13 & BATTEN SIDING COLOR NAME: OAK CREEK LAP SIDING COLOR NAME: TIKI HUT 12 COLOR PALLET C 22 MATERIAL MFR / COLOR MATERIAL FINISH COLOR S 0'-0" HEET 23 PAINTED HARDBOARD MFR: SHERWIN WILLIAMS MFR: SHERWIN WILLIAMS FIRST FLOOR PAINTED HARDBOARD SHINGLE SIDING OR BOARD PAINT NUMBER: SW7540 PAINT NUMBER: SW6151 7 11 16 14 15 16 17 18 & BATTEN SIDING COLOR NAME: ARTISAN TAN LAP SIDING COLOR NAME: QUIVER TAN BUILDING TYPE 4B COLOR PALLET D REAR ELEVATION PAINTED MATERIAL MFR / COLOR MATERIAL FINISH COLOR HARDBOARD MFR: SHERWIN WILLIAMS PAINTED HARDBOARD MFR: SHERWIN WILLIAMS BUILDING TYPE 4B 4SCALE:1/8" = V-0" SHINGLE SIDING OR BOARD PAINT NUMBER: SW7737 LAP SIDING PAINT NUMBER: SW7034 & BATTEN SIDING COLOR NAME: MEADOW TRAIL COLOR NAME: STATUS BRONZE ELEVATIONS KEYNOTES ® PRICE 1. ASPHALT SHINGLE RIDGE / HIP CAP. SEE ROOF PLAN FOR LOCATION AND TYPES OF ROOF ATTIC SANDERS VENTING. RHEES 2. ARCHITECTURAL LAMINATED FIBERGLASS ROOF SHINGLES. RUBY 3. 6 X 12 PAINTED WOOD CORBEL. 4. RAKE FASCIA: 1 X 4 PAINTED HARDBOARD FASCIA OVER 5/4 X 8 PAINTED HARDBOARD FASCIA. PROVIDE PAINTED 5/16" HARDBOARD SOFFIT. OWNER OPTION: USE FIBER CEMENT FASCIA, AND TH I AR(H ITEICTS 4FF ICE !� SOFFIT IN LIEU OF HARDBOARD. 5. EAVE FASCIA: 5/4 X 8 PAINTED HARDBOARD. PROVIDE PAINTED 5/16" HARDBOARD VENTED SOFFIT 499 MAIN STREET (2 0 8) 3 4 3-2 9 31 1 9 AT EAVES. PROVIDE PRE-FINISHED METAL GUTTER AND DOWNSPOUT PER ROOF PLAN. FINAL LOCATION AND NUMBER OF DOWNSPOUTS (SHOWN DASHED) IS SHOWN SCHEMATIC ONLY AND IT TO BOISE, IDAHO 83702 T A 0 I D A H 0.C 0 M +30'-1"t 2 7 BE DESIGN-BUILD BY THE GENERAL CONTRACTOR. VERIFY FINAL LOCATIONS OF DOWNSPOUTS WITH TOP OF ROOF OWNER. PROVIDE CONCRETE SPLASH BLOCK AT BASE. OWNER OPTION: USE FIBER CEMENT 3 5 FASCIA AND SOFFIT IN LIEU OF HARDBOARD. 4 11 6. 5/4 X 12 PAINTED HARDBOARD TRIM. PROVIDE PREFINISHED 'Z' FLASHING AT TOP. OWNER OPTION: USE FIBER CEMENT TRIM IN LIEU OF HARDBOARD 8 7. 5/4 X 8 PAINTED HARDBOARD TRIM. PROVIDE PREFINISHED 'Z' FLASHING AT TOP. OWNER OPTION: USE FIBER CEMENT TRIM IN LIEU OF HARDBOARD. +19'-0 1 2" 18 8. 1 X 4 PAINTED HARDBOARD TRIM CORNERS AND TRANSITIONS, TYP. OWNER OPTION: USE FIBER TOP OF PLATE 1 CEMENT TRIMS IN LIEU OF HARDBOARD. 9. SHINGLE SIDING: PAINTED HARDBOARD SHINGLE STYLE SIDING. OWNER OPTION: USE FIBER CEMENT 2 SHINGLE SIDING IN LIEU OF HARDBOARD. Ll 6 10. VERTICAL BOARD & BATTEN STYLE SIDING: PANTED 4' X 10' X 5/16" HARDBOARD PANELS WITH 01L PAINTED 1 X 2 HARDBOARD BATTENS AT 12" O.C. OR PAINTED 1 X 3 HARDBOARD BATTENS AT +10'-0 1/8. 11 1'-4" O.C. OWNER OPTION: USE FIBER CEMENT BOARD & BATTEN SIDING IN LIEU OF HARDBOARD. SECOND FLOOR -- FINISH FLOOR 13 OWNER OPTION: USE FIBER CEMENT SIDING IN LIEU OF HARDBOARD. 12 12. PAINTED HARDBOARD COLUMN SIDING AND TRIMS. OWNER OPTION: USE FIBER CEMENT SIDING AND TRIMS IN LIEU OF HARDBOARD. a 22 13. DECORATIVE EXTERIOR LIGHT FIXTURE. 23 14. STONE VENEER CAP. PROVIDE TRANSITION FLASHING PER MANUFACTURER. FIRST FLOOR I A 11 1 1 1 1 7 1 115. STONE VENEER SIDING. 16. DOUBLE GLAZED VINYL FRAMED WINDOW PER WINDOW SCHEDULE WITH 1" X 6" PAINTED 7 19 21 20 11 16 11 14 15 17 HARDBOARD TRIM AT TOP AND BOTTOM, 1" X 4" PAINTED HARDBOARD TRIM AT SIDES. SEE WINDOW SCHEDULE DETAILS FOR FLASHING REQUIREMENTS. OWNER OPTION: USE FIBER CEMENT BUILDING TYPE 1A TRIMS IN LIEU OF HARDBOARD. PROJECT FRONT ELEVATION 17. EXTERIOR DOOR PER DOOR SCHEDULE WITH 1" X 6" PAINTED HARDBOARD TRIM AT TOP, 1" X 4" PAINTED HARDBOARD TRIM AT SIDES. SEE DOOR SCHEDULE DETAILS FOR FLASHING REQUIREMENTS. OWNER OPTION: USE FIBER CEMENT TRIMS IN LIEU OF HARDBOARD. SCALE: 1/8" = 1'-0" 18. DECK STRUCTURE PER DECK DETAILS WITH CONCRETE TOP, PAINTED HARDBOARD CEILING, PAINTED SOUTHRIDGE HARDBOARD TRIMS AND PAINTED STEEL GUARDRAIL. OWNER OPTION: USE FIBER CEMENT CEILING AND TRIMS IN LIEU OF HARDBOARD. 19. FIRE SPRINKLER RISER CLOSET WITH ASPHALT SHINGLE ROOF WITH PRE-FINISHED METAL APARTMENTS FLASHINGS, 1 x PAINTED HARDBOARD FASCIA, SIDING AND TRIMS AND PAINTED INSULATED METAL DOOR. VERIFY WITH SITE PLAN AND CIVIL DRAWINGS FOR LOCATION OF CLOSET. OWNER OPTION: USE FIBER CEMENT TRIMS IN LIEU OF HARDBOARD.20 WALL CATIONUNT ELECTRICAL PANEL OF ELECTRICAL PANELSLOTHEIRNUTI UTILITY VERIFY EARTH SITE PLAN AND CIVIL DRAWINGS FOR TEN MILE R D. Q 21. WINDOW LOCATION OF FIRST FLOOR IS ADJUSTED TO ACCOMMODATE UTILITIES, VERIFY WITH FLOOR OVERLAND R D. 1 1 PLANS. EXPOSED22. ot+30'-1"t 2 +30'-1"f 2 23. FINISHH CONCRETE FOUNDATION GRADE, SLOPE AWAYF WALL. MERIDIAN, I DAH 0 FROM BUILDING AT 2% MIN. SEE GRADING PLAN. TOP OF ROOF TOP OF ROOF 3 3 4 4 GENERAL NOTES 9 9 A. ALL NOTES ON ELEVATIONS ARE TYPICAL AND APPLY TO ALL ELEVATIONS. +19'-0 1 2" 7 10 1 2" 1 TI IIII I 7 B. REFER TO CONSTRUCTION TYPE DETAILS (SHEETS A10.0 AND A10.1) AND SPECIFICATIONS FOR TOP OF PLATE 5 TOP OF PLATE 5 ADDITIONAL EXTERIOR FINISH MATERIAL NOTES. EA C. ALL VISIBLE EXTERIOR FLASHINGS TO BE PRE-FINISHED METAL (DARK BROWN) U.O.N. ALL 11 11 CONCEALED METAL FLASHING TO BE GALVANIZED METAL. ALL EXPOSED CAULKING NOT PAINTED TO MATCH ADJACENT MATERIAL FINISH COLOR. 8 8 -CONTRACTORS TO PROVIDE 12" X 12" MIN. SAMPLE OF ALL FINISH MATERIALS FOR OWNER'S D. SUB OL+10'-0 1/8" — — — — — — — — 18 +10'-0 1 8" REVIEW AND ACCEPTANCE PRIOR TO CONSTRUCTION. L - — - - - - - - - - - - — SECOND FLOOR SECOND FLOOR E. VERIFY ALL FINISH MATERIAL SELECTION AND COLORS WITH OWNER PRIOR TO ORDERING AND FINISH FLOOR ❑ 12 FlNISH FLOOR ❑ 12 INSTALLATION. 0 17 17 F. OWNER OPTION: HARDBOARD SIDING AND TRIMS TO BE ENGINEERED HARDBOARD OR FIBER CEMENT F SIDING AND TRIMS. ALL SIDING AND TRIMS TO BE PRIMED (OR PRE-PRIMED), CAULKED PER SEAL MANUFACTURER'S REQUIREMENTS AND AND PAINTED TWO FINISH COATS. 22 22 G. ALL UTILITIES TO BE SCREENED OR BELOW GRADE. COORDINATE WITH MECHANICAL DRAWINGS AS 1 23 ot0'-0" 23 REQUIRED. FIRST FLOOR FIRST FLOOR H. ALL FINISH MATERIALS TO BE INSTALLED PER MANUFACTURER SPECIFICATIONS, 2012 IBC ` 13 12 17 16 6 16 15 14 13 12 17 �7\_T 16 15 14 REQUIREMENTS AND PER GENERALLY ACCEPTED CONSTRUCTION PRACTICES. BUILDING TYPE 1A BUILDING TYPE 1A EXTERIOR FINISH SCHEDULE 2 LEFT SIDE ELEVATION RIGHT SIDE ELEVATION ALL BUILDINGS Q SCALE: 1/8" = 1'-0" 3 SCALE: 1/8" = 1'-0" MATERIAL MFR / COLOR MATERIAL FINISH COLOR This document is the property of THE ARCHITECTS MANUFACTURER: GAF OFFICE,PLLC and is not to be duplicated without ASPHALT SHINGLE COLOR: TIMBERLINE NATURAL VINYL WINDOW FRAME MANUFACTURER: written authorization. SHADOW: BARKWOOD COLOR: ALMOND ©THE ARCHITECTS OFFICE,PLLC PAINTED HARDBOARD MFR: SHERWIN WILLIAMS COLOR: CLEAR FASCIA & SOFFIT PAINT NUMBER: SW6148 WINDOW GLAZING INSULATED FILE COLOR NAME: WOOL SKEIN DATE PANTED HARDBOARD DOOR & MFR: SHERWIN WILLIAMS POWDER COAT MAY 5, 2017 WINDOW TRIMS, BELLY BANDS, PAINT NUMBER: SW6148 METAL RAILING COLOR: BLACK COLUMNS, CORBELS, ETC. COLOR NAME: WOOL SKEIN FILE NO. 1 9 PRE-FINISHED METAL COLOR TO MATCH METAL STAIRS POWDER COAT 15-303 DD5.0 GUTTER & DOWNSPOUT SW6148 / WOOL SKEIN STRINGERS & RAILING COLOR: BLACK oL+30'-1"t 2 7 DRAWN TOP OF ROOF MFR: BORAL CULTURED EXPOSED METAL FACTORY PRE-FINISHED MATT RHEES 3 5 STONE VENEER STONE - COUNTRY LEDGESTONE: ASPEN FLASHING COLOR: DARK BROWN 4 11 COLOR PALLET A REVISIONS 8 MATERIAL MFR / COLOR MATERIAL FINISH COLOR 10 1 2" 18 PANTED HARDBOARD MFR: SHERWIN WILLIAMS PAINTED HARDBOARD MFR: SHERWIN WILLIAMS TOP OF PLATE 1 SHINGLE SIDING OR BOARD PAINT NUMBER: SW2845 LAP SIDING PAINT NUMBER: SW7680 & BATTEN SIDING COLOR NAME: BUNGLEHOUSE GRAY COLOR NAME: LANYARD 2 U.2 __ ;-- 11111111111111 COLOR PALLET B 6 ALIMATERIAL MFR / COLOR MATERIAL FINISH COLOR +10'-0 1/8. _ _ 11 PANTED HARDBOARD MFR: SHERWIN WILLIAMS PAINTED HARDBOARD MFR: SHERWIN WILLIAMS SECOND FLOOR SHINGLE SIDING OR BOARD PAINT NUMBER: SW7718 PAINT NUMBER: SW7509 FINISH FLOOR 13 & BATTEN SIDING COLOR NAME: OAK CREEK LAP SIDING COLOR NAME: TIKI HUT 12 k. COLOR PALLET C 22 MATERIAL MFR / COLOR MATERIAL FINISH COLOR IE OIL 0'-0" 23 PANTED HARDBOARD MFR: SHERWIN WILLIAMS MFR: SHERWIN WILLIAMS SHEET FlRST FLOOR PAINTED HARDBOARD SHINGLE SIDING OR BOARD PAINT NUMBER: SW7540 PAINT NUMBER: SW6151 7 11 16 11 14 15 17 & BATTEN SIDING COLOR NAME: ARTISAN TAN LAP SIDING COLOR NAME: QUIVER TAN BUILDING TYPE 1A COLOR PALLET D DD5m REAR ELEVATION PANTED MATERIAL MFR / COLOR MATERIAL FINISH COLOR HARDBOARD MFR: SHERWIN WILLIAMS PAINTED HARDBOARD MFR: SHERWIN WILLIAMS BUILDING TYPE 1 A 4SCALE:1/8" = 1'-0° SHINGLE SIDING OR BOARD PAINT NUMBER: SW7737 LAP SIDING PAINT NUMBER: SW7034 & BATTEN SIDING COLOR NAME: MEADOW TRAIL COLOR NAME: STATUS BRONZE ELEVATIONS KEYNOTES ® PRICE 1. ASPHALT SHINGLE RIDGE / HIP CAP. SEE ROOF PLAN FOR LOCATION AND TYPES OF ROOF ATTIC SANDERS VENTING. RHEES 2. ARCHITECTURAL LAMINATED FIBERGLASS ROOF SHINGLES. RUBY 3. 6 X 12 PAINTED WOOD CORBEL. 4. RAKE FASCIA: 1 X 4 PAINTED HARDBOARD FASCIA OVER 5/4 X 8 PAINTED HARDBOARD FASCIA. PROVIDE PAINTED 5/16" HARDBOARD SOFFIT. OWNER OPTION: USE FIBER CEMENT FASCIA, AND TH I AR(H ITEICTS 4FF ICE !� SOFFIT IN LIEU OF HARDBOARD. 5. EAVE FASCIA: 5/4 X 8 PAINTED HARDBOARD. PROVIDE PAINTED 5/16" HARDBOARD VENTED SOFFIT 499 MAIN STREET (2 0 8) 3 4 3-2 9 31 1 10 AT EAVES. PROVIDE PRE—FINISHED METAL GUTTER AND DOWNSPOUT PER ROOF PLAN. FINAL LOCATION AND NUMBER OF DOWNSPOUTS (SHOWN DASHED) IS SHOWN SCHEMATIC ONLY AND IT TO BOISE, IDAHO 83702 T A 0 I D A H 0.C 0 M +30'-1"t 2 7 BE DESIGN—BUILD BY THE GENERAL CONTRACTOR. VERIFY FINAL LOCATIONS OF DOWNSPOUTS WITH TOP OF ROOF OWNER. PROVIDE CONCRETE SPLASH BLOCK AT BASE. OWNER OPTION: USE FIBER CEMENT 3 5 FASCIA AND SOFFIT IN LIEU OF HARDBOARD. 4 10 6. 5/4 X 12 PAINTED HARDBOARD TRIM. PROVIDE PREFINISHED 'Z' FLASHING AT TOP. OWNER OPTION: USE FIBER CEMENT TRIM IN LIEU OF HARDBOARD 8 7. 5/4 X 8 PAINTED HARDBOARD TRIM. PROVIDE PREFINISHED 'Z' FLASHING AT TOP. OWNER OPTION: USE FIBER CEMENT TRIM IN LIEU OF HARDBOARD. +19'-0 1 2" 18 8. 1 X 4 PAINTED HARDBOARD TRIM CORNERS AND TRANSITIONS, TYP. OWNER OPTION: USE FIBER TOP OF PLATE 1 CEMENT TRIMS IN LIEU OF HARDBOARD. 9. SHINGLE SIDING: PAINTED HARDBOARD SHINGLE STYLE SIDING. OWNER OPTION: USE FIBER CEMENT 2 SHINGLE SIDING IN LIEU OF HARDBOARD. 6 10. VERTICAL BOARD & BATTEN STYLE SIDING: PANTED 4' X 10' X 5/16" HARDBOARD PANELS WITH PAINTED 1 X 2 HARDBOARD BATTENS AT 12" O.C. OR PAINTED 1 X 3 HARDBOARD BATTENS AT 0IL+10'-0 1/8. Li 11 1'-4" O.C. OWNER OPTION: USE FIBER CEMENT BOARD & BATTEN SIDING IN LIEU OF HARDBOARD. SECOND FLOOR 11. HORIZONTAL LAP SIDING: PAINTED HARDBOARD LAPPED SIDING WITH 6 INCH NOMINAL EXPOSURE. FINISH FLOOR 13 OWNER OPTION: USE FIBER CEMENT SIDING IN LIEU OF HARDBOARD. 12 12. PAINTED HARDBOARD COLUMN SIDING AND TRIMS. OWNER OPTION: USE FIBER CEMENT SIDING AND TRIMS IN LIEU OF HARDBOARD. a 22 13. DECORATIVE EXTERIOR LIGHT FIXTURE. 14. STONE VENEER CAP. PROVIDE TRANSITION FLASHING PER MANUFACTURER. FIRST FLOOR 15. STONE VENEER SIDING. 16. DOUBLE GLAZED VINYL FRAMED WINDOW PER WINDOW SCHEDULE WITH 1" X 6" PAINTED 7 19 21 20 11 16 10 14 15 17 HARDBOARD TRIM AT TOP AND BOTTOM, 1" X 4" PAINTED HARDBOARD TRIM AT SIDES. SEE WINDOW SCHEDULE DETAILS FOR FLASHING REQUIREMENTS. OWNER OPTION: USE FIBER CEMENT BUILDING TYPE 1 B TRIMS IN LIEU OF HARDBOARD. " " " " PROJECT FRONT ELEVATION 17. EXTERIOR DOOR PER DOOR SCHEDULE WITH 1 X 6 PAINTED HARDBOARD TRIM AT TOP, 1 X 4 PAINTED HARDBOARD TRIM AT SIDES. SEE DOOR SCHEDULE DETAILS FOR FLASHING REQUIREMENTS. OWNER OPTION: USE FIBER CEMENT TRIMS IN LIEU OF HARDBOARD. SCALE: 1/8" = 1'-0" 18. DECK STRUCTURE PER DECK DETAILS WITH CONCRETE TOP, PAINTED HARDBOARD CEILING, PAINTED SOUTHRIDGE HARDBOARD TRIMS AND PAINTED STEEL GUARDRAIL. OWNER OPTION: USE FIBER CEMENT CEILING AND TRIMS IN LIEU OF HARDBOARD. 19. FIRE SPRINKLER RISER CLOSET WITH ASPHALT SHINGLE ROOF WITH PRE—FINISHED METAL APARTMENTS FLASHINGS, 1 x PAINTED HARDBOARD FASCIA, SIDING AND TRIMS AND PAINTED INSULATED METAL DOOR. VERIFY WITH SITE PLAN AND CIVIL DRAWINGS FOR LOCATION OF CLOSET. OWNER OPTION: USE FIBER CEMENT TRIMS IN LIEU OF HARDBOARD.20 WALL CATIONUNT ELECTRICAL PANEL OF ELECTRICAL PANELSLOTHEIRNUTI UTILITY VERIFY EARTH SITE PLAN AND CIVIL DRAWINGS FOR TEN MILE R D. Q 21. WINDOW LOCATION OF FIRST FLOOR IS ADJUSTED TO ACCOMMODATE UTILITIES, VERIFY WITH FLOOR OVERLAND R D. 1 1 PLANS. EXPOSED22. ou+30'-1"t 2 +30'-1"f 2 23. FINISHH CONCRETE FOUNDATION GRADE, SLOPE AWAYF WALL. MERIDIAN, I DAH 0 FROM BUILDING AT 2% MIN. SEE GRADING PLAN. TOP OF ROOF TOP OF ROOF 3 3 4 4 GENERAL NOTES 11 11 A. ALL NOTES ON ELEVATIONS ARE TYPICAL AND APPLY TO ALL ELEVATIONS. +19'-0 1 2" 5 +19'-0 1 2" 5 B. REFER TO CONSTRUCTION TYPE DETAILS (SHEETS A10.0 AND A10.1) AND SPECIFICATIONS FOR TOP OF PLATE 11 TOP OF PLATE 11 ADDITIONAL EXTERIOR FINISH MATERIAL NOTES. 10 � 10 C. ALL VISIBLE EXTERIOR FLASHINGS TO BE PRE—FINISHED METAL (DARK BROWN) U.O.N. ALL CONCEALED METAL FLASHING TO BE GALVANIZED METAL. ALL EXPOSED CAULKING NOT PAINTED TO 8 Eu 008 MATCH ADJACENT MATERIAL FINISH COLOR. D. SUB—CONTRACTORS TO PROVIDE 12" X 12" MIN. SAMPLE OF ALL FINISH MATERIALS FOR OWNER'S OIL+10'-0 1/8" Liam _ _ _ _ ff- 18 +1O'-0 1 8" _ _ _ 1 g REVIEW AND ACCEPTANCE PRIOR TO CONSTRUCTION. SECOND FLOOR SECOND FLOOR E. VERIFY ALL FINISH MATERIAL SELECTION AND COLORS WITH OWNER PRIOR TO ORDERING AND FINISH FLOOR ❑ 12 FINISH FLOOR ❑ 12 INSTALLATION. 0 17 17 F. OWNER OPTION: HARDBOARD SIDING AND TRIMS TO BE ENGINEERED HARDBOARD OR FIBER CEMENT SIDING AND TRIMS. ALL SIDING AND TRIMS TO BE PRIMED (OR PRE—PRIMED), CAULKED PER SEAL 22 22 MANUFACTURER'S REQUIREMENTS AND AND PAINTED TWO FINISH COATS. G. ALL UTILITIES TO BE SCREENED OR BELOW GRADE. COORDINATE WITH MECHANICAL DRAWINGS AS 01L0'-0" 11' 23 0'-0" 23 REQUIRED. FIRST FLOOR FIRST FLOOR H. ALL FINISH MATERIALS TO BE INSTALLED PER MANUFACTURER SPECIFICATIONS, 2012 IBC ` 13 12 17 16 6 16 15 14 13 12 17 16 LIS 15 14 REQUIREMENTS AND PER GENERALLY ACCEPTED CONSTRUCTION PRACTICES. BUILDING TYPE 1B BUILDING TYPE 1B EXTERIOR FINISH SCHEDULE 2 LEFT SIDE ELEVATION RIGHT SIDE ELEVATION ALL BUILDINGS Q SCALE: 1/8" = 1'-0" 3 SCALE: 1/8" = 1'-0" MATERIAL MFR / COLOR MATERIAL FINISH COLOR This document is the property of THE ARCHITECTS MANUFACTURER: GAF OFFICE,PLLC and is not to be duplicated without ASPHALT SHINGLE COLOR: TIMBERLINE NATURAL VINYL WINDOW FRAME MANUFACTURER: written authorization. SHADOW: BARKWOOD COLOR: ALMOND ©THE ARCHITECTS OFFICE,PLLC PAINTED HARDBOARD MFR: SHERWIN WILLIAMS COLOR: CLEAR FASCIA & SOFFIT PAINT NUMBER: SW6148 WINDOW GLAZING INSULATED FILE COLOR NAME: WOOL SKEIN DATE PANTED HARDBOARD DOOR & MFR: SHERWIN WILLIAMS POWDER COAT MAY 5, 2017 WINDOW TRIMS, BELLY BANDS, PAINT NUMBER: SW6148 METAL RAILING COLOR: BLACK COLUMNS, CORBELS, ETC. COLOR NAME: WOOL SKEIN FILE NO. 1 10 PRE-FINISHED METAL COLOR TO MATCH METAL STAIRS POWDER COAT 15-303 DD5.0 GUTTER & DOWNSPOUT SW6148 / WOOL SKEIN STRINGERS & RAILING COLOR: BLACK oL+30'-1"t 2 7 DRAWN TOP OF ROOF MFR: BORAL CULTURED EXPOSED METAL FACTORY PRE-FINISHED MATT RHEES 3 5 STONE VENEER STONE - COUNTRY FLASHING COLOR: DARK BROWN LEDGESTONE: ASPEN 4 10 COLOR PALLET A REVISIONS 8 MATERIAL MFR / COLOR MATERIAL FINISH COLOR +19'-0 1 2" 18 PANTED HARDBOARD MFR: SHERWIN WILLIAMS PAINTED HARDBOARD MFR: SHERWIN WILLIAMS OIL TOP OF PLATE SHINGLE SIDING OR BOARD PAINT NUMBER: SW2845 PAINT NUMBER: SW7680 1 & BATTEN SIDING COLOR NAME: BUNGLEHOUSE GRAY LAP SIDING COLOR NAME: LANYARD 2 COLOR PALLET B 6 0IL +10'-0 1/8. MATERIAL MFR / COLOR MATERIAL FINISH COLOR JIM 11 PANTED HARDBOARD MFR: SHERWIN WILLIAMS PAINTED HARDBOARD MFR: SHERWIN WILLIAMS SECOND FLOOR SHINGLE SIDING OR BOARD PAINT NUMBER: SW7718 PAINT NUMBER: SW7509 FINISH FLOOR 13 & BATTEN SIDING COLOR NAME: OAK CREEK LAP SIDING COLOR NAME: TIKI HUT 12 COLOR PALLET C 22 MATERIAL MFR / COLOR MATERIAL FINISH COLOR OIL0'-0" Ll 23 PANTED HARDBOARD MFR: SHERWIN WILLIAMS MFR: SHERWIN WILLIAMS SHEET FIRST FLOOR— NMI 1NNNNNINN 71777 PAINTED HARDBOARD SHINGLE SIDING OR BOARD PAINT NUMBER: SW7540 PAINT NUMBER: SW6151 7 11 16 10 14 15 17 & BATTEN SIDING COLOR NAME: ARTISAN TAN LAP SIDING COLOR NAME: QUIVER TAN BUILDING TYPE 1 B COLOR PALLET D REAR ELEVATION PANTED MATERIAL MFR / COLOR MATERIAL FINISH COLOR HARDBOARD MFR: SHERWIN WILLIAMS PAINTED HARDBOARD MFR: SHERWIN WILLIAMS BUILDING TYPE 1 B 4SCALE:1/8" = 1'-0° SHINGLE SIDING OR BOARD PAINT NUMBER: SW7737 LAP SIDING PAINT NUMBER: SW7034 & BATTEN SIDING COLOR NAME: MEADOW TRAIL COLOR NAME: STATUS BRONZE ELEVATIONS KEYNOTES ® PRICE 1. ASPHALT SHINGLE RIDGE / HIP CAP. SEE ROOF PLAN FOR LOCATION AND TYPES OF ROOF ATTIC SANDERS VENTING. RHEES 2. ARCHITECTURAL LAMINATED FIBERGLASS ROOF SHINGLES. RUBY ob+40'-0"f 1 3. 6 X 12 PAINTED WOOD CORBEL. TOP OF ROOF 4. RAKE FASCIA: 1 X 4 PAINTED HARDBOARD FASCIA OVER 5/4 X 8 PAINTED HARDBOARD FASCIA. 2 PROVIDE PAINTED 5/16" HARDBOARD SOFFIT. OWNER OPTION: USE FIBER CEMENT FASCIA, AND 3 SOFFIT IN LIEU OF HARDBOARD. THI AR(HITE(TSOFFI(E C� 5. EAVE FASCIA: 5/4 X 8 PAINTED HARDBOARD. PROVIDE PAINTED 5/16" HARDBOARD VENTED SOFFIT 499 MAIN STREET (2 0 8) 3 4 3-2 9 31 4 AT EAVES. PROVIDE PRE—FINISHED METAL GUTTER AND DOWNSPOUT PER ROOF PLAN. FINAL BOISE, IDAHO 83702 T A 0 I D A H 0.C 0 M LOCATION AND NUMBER OF DOWNSPOUTS (SHOWN DASHED) IS SHOWN SCHEMATIC ONLY AND IT TO 9 BE DESIGN—BUILD BY THE GENERAL CONTRACTOR VERIFY FINAL LOCATIONS OF DOWNSPOUTS WITH +28'-11 7 8" HillIIIOWNER. PROVIDE CONCRETE SPLASH BLOCK AT .BASE. OWNER OPTION: USE FIBER CEMENT TOP OF PLATE 5 FASCIA AND SOFFIT IN LIEU OF HARDBOARD. 111 7 6. 5/4 X 12 PAINTED HARDBOARD TRIM. PROVIDE PREFINISHED 'Z' FLASHING AT TOP. OWNER OPTION: USE FIBER CEMENT TRIM IN LIEU OF HARDBOARD 8 7. 5/4 X 8 PAINTED HARDBOARD TRIM. PROVIDE PREFINISHED 'Z' FLASHING AT TOP. OWNER OPTION: USE FIBER CEMENT TRIM IN LIEU OF HARDBOARD. OL +19'-11 1 2" Elul 1 11 8. 1 X 4 PAINTED HARDBOARD TRIM CORNERS AND TRANSITIONS, TYP. OWNER OPTION: USE FIBER THIRD FLOOR CEMENT TRIMS IN LIEU OF HARDBOARD. FINISH FLOOR 1 9. SHINGLE SIDING: PAINTED HARDBOARD SHINGLE STYLE SIDING. OWNER OPTION: USE FIBER CEMENT 2 SHINGLE SIDING IN LIEU OF HARDBOARD.1TF 6 10. VERTICAL BOARD & BATTEN STYLE SIDING: PANTED 4' X 10' X 5/16" HARDBOARD PANELS WITH LIT PAINTED 1 X 2 HARDBOARD BATTENS AT 12" O.C. OR PAINTED 1 X 3 HARDBOARD BATTENS AT +10'-0 1 8" 11 1'-4" O.C. OWNER OPTION: USE FIBER CEMENT BOARD & BATTEN SIDING IN LIEU OF HARDBOARD. SECOND FLOOR 11. HORIZONTAL LAP SIDING: PAINTED HARDBOARD LAPPED SIDING WITH 6 INCH NOMINAL EXPOSURE. FINISH FLOOR 13 OWNER OPTION: USE FIBER CEMENT SIDING IN LIEU OF HARDBOARD. 12 12. PAINTED HARDBOARD COLUMN SIDING AND TRIMS. OWNER OPTION: USE FIBER CEMENT SIDING AND TRIMS IN LIEU OF HARDBOARD. p 000 22 13. DECORATIVE EXTERIOR LIGHT FIXTURE. OL 23 14. STONE VENEER CAP. PROVIDE TRANSITION FLASHING PER MANUFACTURER. 0'—0" FlRST FLOOR 15. STONE VENEER SIDING. 16. DOUBLE GLAZED VINYL FRAMED WINDOW PER WINDOW SCHEDULE WITH 1" X 6" PAINTED 7 19 21 20 11 16 14 15 16 17 18 HARDBOARD TRIM AT TOP AND BOTTOM, 1" X 4" PAINTED HARDBOARD TRIM AT SIDES. SEE WINDOW SCHEDULE DETAILS FOR FLASHING REQUIREMENTS. OWNER OPTION: USE FIBER CEMENT BUILDING TYPE 2A TRIMS IN LIEU OF HARDBOARD. PROJECT FRONT ELEVATION 17. EXTERIOR DOOR PER DOOR SCHEDULE WITH 1" X 6" PAINTED HARDBOARD TRIM AT TOP, 1" X 4" PAINTED HARDBOARD TRIM AT SIDES. SEE DOOR SCHEDULE DETAILS FOR FLASHING REQUIREMENTS. OWNER OPTION: USE FIBER CEMENT TRIMS IN LIEU OF HARDBOARD. SCALE: 1/8" = 1'-0" 18. DECK STRUCTURE PER DECK DETAILS WITH CONCRETE TOP, PAINTED HARDBOARD CEILING, PAINTED SOUTHRIDGE HARDBOARD TRIMS AND PAINTED STEEL GUARDRAIL. OWNER OPTION: USE FIBER CEMENT CEILING AND TRIMS IN LIEU OF HARDBOARD. 19. FIRE SPRINKLER RISER CLOSET WITH ASPHALT SHINGLE ROOF WITH PRE—FINISHED METAL APARTMENTS FLASHINGS, 1 x PAINTED HARDBOARD FASCIA, SIDING AND TRIMS AND PAINTED INSULATED METAL ob+40'-0"t 1 ot+40'-0"1 1 DOOR. VERIFY WITH SITE PLAN AND CIVIL DRAWINGS FOR LOCATION OF CLOSET. OWNER OPTION: TOP OF ROOF TOP OF ROOF USE FIBER CEMENT TRIMS IN LIEU OF HARDBOARD.2 2 20 WALL CATIONUNT ELECTRICAL PANEL OF ELECTRICAL PANELSLOTHEIRNUTI UTILITY VERIFY EARTH SITE PLAN AND CIVIL DRAWINGS FOR TEN MILE R D. Q 3 3 21. WINDOW LOCATION OF FIRST FLOOR IS ADJUSTED TO ACCOMMODATE UTILITIES, VERIFY WITH FLOOR OVERLAND R D. PLANS. 4 4 22. EXPOSED CONCRETE FOUNDATION WALL. MERIDIAN, IDAHO 5 5 23. FINISH GRADE, SLOPE AWAY FROM BUILDING AT 2% MIN. SEE GRADING PLAN. +28'-11 7 8" +28'-11 7 $" TOP OF PLATE g TOP OF PLATE g 9 9 GENERAL NOTES 7 7 A. ALL NOTES ON ELEVATIONS ARE TYPICAL AND APPLY TO ALL ELEVATIONS. THIRD FLOOR " 11 THIRD FLOOR " 11 B. REFER TO CONSTRUCTION TYPE DETAILS (SHEETS A10.0 AND A10.1) AND SPECIFICATIONS FOR FINISH FLOOR _MT16 FINISH FLOOR 16 ADDITIONAL EXTERIOR FINISH MATERIAL NOTES. C. ALL VISIBLE EXTERIOR FLASHINGS TO BE PRE-FINISHED METAL (DARK BROWN) U.O.N. ALL 18 18 CONCEALED METAL FLASHING TO BE GALVANIZED METAL. ALL EXPOSED CAULKING NOT PAINTED TO MATCH ADJACENT MATERIAL FINISH COLOR. 14 14 D. SUB-CONTRACTORS TO PROVIDE 12" X 12" MIN. SAMPLE OF ALL FINISH MATERIALS FOR OWNER'S OL+10'-0 1/8" 15 +10'-0 1 8" 15 REVIEW AND ACCEPTANCE PRIOR TO CONSTRUCTION. SECOND FLOOR SECOND FLOOR E. VERIFY ALL FINISH MATERIAL SELECTION AND COLORS WITH OWNER PRIOR TO ORDERING AND FINISH FLOOR ❑ 12 FINISH FLOOR ❑ 12 INSTALLATION. 0 17 0 17 F. OWNER OPTION: HARDBOARD SIDING AND TRIMS TO BE ENGINEERED HARDBOARD OR FIBER CEMENT SIDING AND TRIMS. ALL SIDING AND TRIMS TO BE PRIMED (OR PRE-PRIMED), CAULKED PER SEAL 22 22 MANUFACTURER'S REQUIREMENTS AND AND PAINTED TWO FINISH COATS. G. ALL UTILITIES TO BE SCREENED OR BELOW GRADE. COORDINATE WITH MECHANICAL DRAWINGS AS 0'-0" 23otO'—O" 23 REQUIRED. FIRST FLOOR FIRST FLOOR H. ALL FINISH MATERIALS TO BE INSTALLED PER MANUFACTURER SPECIFICATIONS, 2012 IBC ` 13 12 17 16 6 13 12 17 16 6 REQUIREMENTS AND PER GENERALLY ACCEPTED CONSTRUCTION PRACTICES. BUILDING TYPE 2A BUILDING TYPE 2A EXTERIOR FINISH SCHEDULE 2 LEFT SIDE ELEVATION RIGHT SIDE ELEVATION ALL BUILDINGS Q SCALE: 1/8" = 1'-0" 3 SCALE: 1/8" = V-0" MATERIAL MFR / COLOR MATERIAL FINISH COLOR This document is the property of THE ARCHITECTS MANUFACTURER: GAF OFFICE,PLLC and is not to be duplicated without ASPHALT SHINGLE COLOR: TIMBERLINE NATURAL VINYL WINDOW FRAME MANUFACTURER: written authorization. SHADOW: BARKWOOD COLOR: ALMOND ©THE ARCHITECTS OFFICE,PLLC PAINTED HARDBOARD MFR: SHERWIN WILLIAMS COLOR: CLEAR OIL+40'-0"f 1 FASCIA & SOFFIT PAINT NUMBER: SW6148 WINDOW GLAZING INSULATED FILE TOP OF ROOF COLOR NAME: WOOL SKEIN DATE 2 PANTED HARDBOARD DOOR & MFR: SHERWIN WILLIAMS POWDER COAT MAY 5, 2017 WINDOW TRIMS, BELLY BANDS, PAINT NUMBER: SW6148 METAL RAILING COLOR: BLACK 3 COLUMNS, CORBELS, ETC. COLOR NAME: WOOL SKEIN FILE NO. PRE-FINISHED METAL COLOR TO MATCH METAL STAIRS POWDER COAT 15-303 DD5.0 4 GUTTER & DOWNSPOUT SW6148 / WOOL SKEIN STRINGERS & RAILING COLOR: BLACK 9 DRAWN +28'-11 7 8" MFR: BORAL CULTURED EXPOSED METAL FACTORY PRE-FINISHED MATT RHEES TOP OF PLATE 5 STONE VENEER STONE - COUNTRY LEDGESTONE: ASPEN FLASHING COLOR: DARK BROWN 7 REVISIONS LLCOLOR PALLET A LAI LI 1� H 8 MATERIAL MFR / COLOR MATERIAL FINISH COLOR +19'-11 1 2° _ 11 PANTED HARDBOARD MFR: SHERWIN WILLIAMS MFR: SHERWIN WILLIAMS THIRD FLOOR FINISH FLOOR 1 SHINGLE SIDING OR BOARD PAINT NUMBER: SW2845 LAP SIDING PAINTED HARDBOARD PAINT NUMBER: SW7680 & BATTEN SIDING COLOR NAME. BUNGLEHOUSE GRAY COLOR NAME: LANYARD Ll Un 2 COLOR PALLET B 6 MATERIAL MFR / COLOR MATERIAL FINISH COLOR +10'-0 1/8' 11 PANTED HARDBOARD MFR: SHERWIN WILLIAMS PAINTED HARDBOARD MFR: SHERWIN WILLIAMS SECOND FLOOR SHINGLE SIDING OR BOARD PAINT NUMBER: SW7718 PAINT NUMBER: SW7509 FINISH FLOOR 13 & BATTEN SIDING COLOR NAME: OAK CREEK LAP SIDING COLOR NAME: TIKI HUT 12 COLOR PALLET C 22 MATERIAL MFR / COLOR MATERIAL FINISH COLOR SHEET ot 0'-0" 23 PANTED HARDBOARD MFR: SHERWIN WILLIAMS PAINTED HARDBOARD MFR: SHERWIN WILLIAMS FlRST FLOOR SHINGLE SIDING OR BOARD PAINT NUMBER: SW7540 PAINT NUMBER: SW6151 7 11 16 14 15 16 17 18 & BATTEN SIDING COLOR NAME: ARTISAN TAN LAP SIDING COLOR NAME: QUIVER TAN BUILDING TYPE 2A COLOR PALLET D DD5m2 REAR ELEVATION PANTED MATERIAL MFR / COLOR MATERIAL FINISH COLOR HARDBOARD MFR: SHERWIN WILLIAMS PAINTED HARDBOARD MFR: SHERWIN WILLIAMS BUILDING TYPE 2A 4SCALE:1/8" = V-0" SHINGLE SIDING OR BOARD PAINT NUMBER: SW7737 LAP SIDING PAINT NUMBER: SW7034 & BATTEN SIDING COLOR NAME: MEADOW TRAIL COLOR NAME: STATUS BRONZE ELEVATIONS KEYNOTES ® PRICE 1. ASPHALT SHINGLE RIDGE / HIP CAP. SEE ROOF PLAN FOR LOCATION AND TYPES OF ROOF ATTIC SANDERS VENTING. RHEES 2. ARCHITECTURAL LAMINATED FIBERGLASS ROOF SHINGLES. RUBY ot+40'-0"+ 1 3. 6 X 12 PAINTED WOOD CORBEL. TOP Of ROOF 4. RAKE FASCIA: 1 X 4 PAINTED HARDBOARD FASCIA OVER 5/4 X 8 PAINTED HARDBOARD FASCIA. 2 PROVIDE PAINTED 5/16" HARDBOARD SOFFIT. OWNER OPTION: USE FIBER CEMENT FASCIA, AND 3 SOFFIT IN LIEU OF HARDBOARD. TH 1 r ARC H ITEICTS O FF I CE C� 5. EAVE FASCIA: 5/4 X 8 PAINTED HARDBOARD. PROVIDE PAINTED 5/16" HARDBOARD VENTED SOFFIT 499 MAIN STREET (2 0 8) 3 4 3-2 9 31 4 AT EAVES. PROVIDE PRE—FINISHED METAL GUTTER AND DOWNSPOUT PER ROOF PLAN. FINAL BOISE, IDAHO 83702 T A 0 I D A H 0.C 0 M LOCATION AND NUMBER OF DOWNSPOUTS (SHOWN DASHED) IS SHOWN SCHEMATIC ONLY AND IT TO k+2810 BE DESIGN—BUILD BY THE GENERAL CONTRACTOR. VERIFY FINAL LOCATIONS OF DOWNSPOUTS WITH 1 18 TOP Of PLATE" OWNER. PROVIDE CONCRETE SPLASH BLOCK AT BASE. OWNER OPTION: USE FIBER CEMENT TOP O 5 FASCIA AND SOFFIT IN LIEU OF HARDBOARD. 7 6. 5/4 X 12 PAINTED HARDBOARD TRIM. PROVIDE PREFINISHED 'Z' FLASHING AT TOP. OWNER OPTION: USE FIBER CEMENT TRIM IN LIEU OF HARDBOARD 8 7. 5/4 X 8 PAINTED HARDBOARD TRIM. PROVIDE PREFINISHED 'Z' FLASHING AT TOP. OWNER OPTION: USE FIBER CEMENT TRIM IN LIEU OF HARDBOARD. +19'-11 1 2" 10 8. 1 X 4 PAINTED HARDBOARD TRIM CORNERS AND TRANSITIONS, TYP. OWNER OPTION: USE FIBER FINISH FLOOR 1 THIRD f CEMENT TRIMS IN LIEU OF HARDBOARD. 9. SHINGLE SIDING: PAINTED HARDBOARD SHINGLE STYLE SIDING. OWNER OPTION: USE FIBER CEMENT 2 SHINGLE SIDING IN LIEU OF HARDBOARD. 6 10. VERTICAL BOARD & BATTEN STYLE SIDING: PANTED 4' X 10' X 5/16" HARDBOARD PANELS WITH PAINTED 1 X 2 HARDBOARD BATTENS AT 12" O.C. OR PAINTED 1 X 3 HARDBOARD BATTENS AT +10'-0 1 8" 11 1'-4" O.C. OWNER OPTION: USE FIBER CEMENT BOARD & BATTEN SIDING IN LIEU OF HARDBOARD. SECOND FLOOR 11. HORIZONTAL LAP SIDING: PAINTED HARDBOARD LAPPED SIDING WITH 6 INCH NOMINAL EXPOSURE. FINISH FLOOR 13 OWNER OPTION: USE FIBER CEMENT SIDING IN LIEU OF HARDBOARD. 12 12. PAINTED HARDBOARD COLUMN SIDING AND TRIMS. OWNER OPTION: USE FIBER CEMENT SIDING AND 00 TRIMS IN LIEU OF HARDBOARD. 0 000 22 13. DECORATIVE EXTERIOR LIGHT FIXTURE. 14. STONE VENEER CAP. PROVIDE TRANSITION FLASHING PER MANUFACTURER. OL 0'-0" 23 FIRST FLOOR 15. STONE VENEER SIDING. 16. DOUBLE GLAZED VINYL FRAMED WINDOW PER WINDOW SCHEDULE WITH 1" X 6" PAINTED 7 19 21 20 11 16 14 15 16 17 18 HARDBOARD TRIM AT TOP AND BOTTOM, 1" X 4" PAINTED HARDBOARD TRIM AT SIDES. SEE WINDOW SCHEDULE DETAILS FOR FLASHING REQUIREMENTS. OWNER OPTION: USE FIBER CEMENT BUILDING TYPE 2B TRIMS IN LIEU OF HARDBOARD. PROJECT FRONT ELEVATION 17. EXTERIOR DOOR PER DOOR SCHEDULE WITH 1" X 6" PAINTED HARDBOARD TRIM AT TOP, 1" X 4" PAINTED HARDBOARD TRIM AT SIDES. SEE DOOR SCHEDULE DETAILS FOR FLASHING REQUIREMENTS. OWNER OPTION: USE FIBER CEMENT TRIMS IN LIEU OF HARDBOARD. SCALE: 1/8" = 1'-0" 18. DECK STRUCTURE PER DECK DETAILS WITH CONCRETE TOP, PAINTED HARDBOARD CEILING, PAINTED SOUTHRIDGE HARDBOARD TRIMS AND PAINTED STEEL GUARDRAIL. OWNER OPTION: USE FIBER CEMENT CEILING AND TRIMS IN LIEU OF HARDBOARD. 19. FIRE SPRINKLER RISER CLOSET WITH ASPHALT SHINGLE ROOF WITH PRE—FINISHED METAL APARTMENTS FLASHINGS, 1 x PAINTED HARDBOARD FASCIA, SIDING AND TRIMS AND PAINTED INSULATED METAL oL+40'-0"t 1 +40'-0"1 1 DOOR. VERIFY WITH SITE PLAN AND CIVIL DRAWINGS FOR LOCATION OF CLOSET. OWNER OPTION: TOP OF ROOF TOP OF ROOF USE FIBER CEMENT TRIMS IN LIEU OF HARDBOARD.2 2 20 WALL OCATIONUOF ELECTRICAL NT ELECTRICAL PANEL LOCATION. IN ITY VERIFY WITH SITE PLAN AND CIVIL DRAWINGS FOR TEN MILE R D. Q 3 3 21. WINDOW LOCATION OF FIRST FLOOR IS ADJUSTED TO ACCOMMODATE UTILITIES, VERIFY WITH FLOOR OVERLAND R D. PLANS. 4 4 22. EXPOSED CONCRETE FOUNDATION WALL. MERIDIAN, IDAHO +28'-11 78 +28'-11 7 $" 5 5 23. FINISH GRADE, SLOPE AWAY FROM BUILDING AT 2% MIN. SEE GRADING PLAN. " TOP OF PLATE g TOP OF PLATE g El 7 GENERAL NOTES 10 10 THIRD FLOOR THIRD FLOOR A. ALL NOTES ON ELEVATIONS ARE TYPICAL AND APPLY TO ALL ELEVATIONS. +19'-11 1 2" 14 +19'-11 1 2" 14 B. REFER TO CONSTRUCTION TYPE DETAILS (SHEETS A10.0 AND A10.1) AND SPECIFICATIONS FOR FINISH FLOOR 15 FINISH FLOOR 15 ADDITIONAL EXTERIOR FINISH MATERIAL NOTES. C. ALL VISIBLE EXTERIOR FLASHINGS TO BE PRE—FINISHED METAL (DARK BROWN) U.O.N. ALL 11 11 CONCEALED METAL FLASHING TO BE GALVANIZED METAL. ALL EXPOSED CAULKING NOT PAINTED TO MATCH ADJACENT MATERIAL FINISH COLOR. IF 18 18 D. SUB—CONTRACTORS TO PROVIDE 12" X 12" MIN. SAMPLE OF ALL FINISH MATERIALS FOR OWNER'S +10'-0 1/8' 16 +10'-0 1/8' 16 REVIEW AND ACCEPTANCE PRIOR TO CONSTRUCTION. SECOND FLOOR SECOND FLOOR E. VERIFY ALL FINISH MATERIAL SELECTION AND COLORS WITH OWNER PRIOR TO ORDERING AND FINISH FLOOR ❑ 12 FINISH FLOOR ❑ 12 INSTALLATION. 17 17 F. OWNER OPTION: HARDBOARD SIDING AND TRIMS TO BE ENGINEERED HARDBOARD OR FIBER CEMENT SIDING AND TRIMS. ALL SIDING AND TRIMS TO BE PRIMED (OR PRE—PRIMED), CAULKED PER SEAL MANUFACTURER'S REQUIREMENTS AND AND PAINTED TWO FINISH COATS. 22 22 G. ALL UTILITIES TO BE SCREENED OR BELOW GRADE. COORDINATE WITH MECHANICAL DRAWINGS AS FLOOR FIRST 0'-0" 23 of—ON FLOOR 23 REQUIRED. FIRST H. ALL FINISH MATERIALS TO BE INSTALLED PER MANUFACTURER SPECIFICATIONS, 2012 IBC ` 13 12 17 16 6 13 12 17 �@77 REQUIREMENTS AND PER GENERALLY ACCEPTED CONSTRUCTION PRACTICES. BUILDING TYPE 2B BUILDING TYPE 2B EXTERIOR FINISH SCHEDULE 2 LEFT SIDE ELEVATION RIGHT SIDE ELEVATION ALL BUILDINGS Q SCALE: 1/8" = 1'-0" 3 SCALE: 1/8" = 1'-0" MATERIAL MFR / COLOR MATERIAL FINISH COLOR This document is the property of THE ARCHITECTS MANUFACTURER: GAF OFFICE,PLLC and is not to be duplicated without ASPHALT SHINGLE COLOR: TIMBERLINE NATURAL VINYL WINDOW FRAME MANUFACTURER: written authorization. SHADOW: BARKWOOD COLOR: ALMOND ©THE ARCHITECTS OFFICE,PLLC PAINTED HARDBOARD MFR: SHERWIN WILLIAMS COLOR: CLEAR oL+4D'—D"f 1 FASCIA & SOFFIT PAINT NUMBER: SW6148 WINDOW GLAZING INSULATED FILE 1 TOP OF ROOF COLOR NAME: WOOL SKEIN DATE 2 PANTED HARDBOARD DOOR & MFR: SHERWIN WILLIAMS POWDER COAT MAY 5, 2017 WINDOW TRIMS, BELLY BANDS, PAINT NUMBER: SW6148 METAL RAILING COLOR: BLACK 3 COLUMNS, CORBELS, ETC. COLOR NAME: WOOL SKEIN FILE NO. PRE—FINISHED METAL COLOR TO MATCH METAL STAIRS POWDER COAT 15-303 DD5.0 4 GUTTER & DOWNSPOUT SW6148 / WOOL SKEIN STRINGERS & RAILING COLOR: BLACK 10 DRAWN +28'-11 7 8" MFR: BORAL CULTURED EXPOSED METAL FACTORY PRE—FINISHED MATT RHEES TOP OF PLATE 5 STONE VENEER STONE — COUNTRY FLASHING COLOR: DARK BROWN LEDGESTONE: ASPEN 7 REVISIONS COLOR PALLET A 8 MATERIAL MFR / COLOR MATERIAL FINISH COLOR +19'-11 1 2" _ _ _ _ 10 PANTED HARDBOARD MFR: SHERWIN WILLIAMS PAINTED HARDBOARD MFR: SHERWIN WILLIAMS THIRD FLOOR SHINGLE SIDING OR BOARD PAINT NUMBER: SW2845 PAINT NUMBER: SW7680 FINISH FLOOR 1 & BATTEN SIDING COLOR NAME: BUNGLEHOUSE GRAY LAP SIDING COLOR NAME: LANYARD 2 COLOR PALLET B 6 MATERIAL MFR / COLOR MATERIAL FINISH COLOR OL+10'-0 1/8'_ 11 PANTED HARDBOARD MFR: SHERWIN WILLIAMS PAINTED HARDBOARD MFR: SHERWIN WILLIAMS SECOND FLOOR SHINGLE SIDING OR BOARD PAINT NUMBER: SW7718 PAINT NUMBER: SW7509 FINISH FLOOR FA 13 & BATTEN SIDING COLOR NAME: OAK CREEK LAP SIDING COLOR NAME: TIKI HUT 12 COLOR PALLET C 22 MATERIAL MFR / COLOR MATERIAL FINISH COLOR SHEET 0'-0" 23 PANTED HARDBOARD MFR: SHERWIN WILLIAMS MFR: SHERWIN WILLIAMS FIRST FLOOR I SHINGLE SIDING OR BOARD PAINT NUMBER: SW7540 PAINTED HARDBOARD PAINT NUMBER: SW6151 7 11 16 14 15 16 17 18 & BATTEN SIDING COLOR NAME: ARTISAN TAN LAP SIDING COLOR NAME: QUIVER TAN BUILDING TYPE 2B COLOR PALLET D DD5m REAR ELEVATION PANTED MATERIAL MFR / COLOR MATERIAL FINISH COLOR HARDBOARD MFR: SHERWIN WILLIAMS PAINTED HARDBOARD MFR: SHERWIN WILLIAMS BUILDING TYPE 2B 4SCALE:1/8" = 1'-0° SHINGLE SIDING OR BOARD PAINT NUMBER: SW7737 LAP SIDING PAINT NUMBER: SW7034 & BATTEN SIDING COLOR NAME: MEADOW TRAIL COLOR NAME: STATUS BRONZE ELEVATIONS KEYNOTES ® PRICE 1. ASPHALT SHINGLE RIDGE / HIP CAP. SEE ROOF PLAN FOR LOCATION AND TYPES OF ROOF ATTIC SANDERS VENTING. RHEES 2. ARCHITECTURAL LAMINATED FIBERGLASS ROOF SHINGLES. RUBY +40'-0"t 1 3. 6 X 12 PAINTED WOOD CORBEL. TOP OF ROOF 4. RAKE FASCIA: 1 X 4 PAINTED HARDBOARD FASCIA OVER 5/4 X 8 PAINTED HARDBOARD FASCIA. 2 PROVIDE PAINTED 5/16" HARDBOARD SOFFIT. OWNER OPTION: USE FIBER CEMENT FASCIA, AND 3 SOFFIT IN LIEU OF HARDBOARD. THI AR(HITE(TSOFFI(E C� 5. EAVE FASCIA: 5/4 X 8 PAINTED HARDBOARD. PROVIDE PAINTED 5/16" HARDBOARD VENTED SOFFIT 499 MAIN STREET (2 0 8) 3 4 3-2 9 31 4 AT EAVES. PROVIDE PRE-FINISHED METAL GUTTER AND DOWNSPOUT PER ROOF PLAN. FINAL BOISE, IDAHO 83702 T A 0 I D A H 0.CO M LOCATION AND NUMBER OF DOWNSPOUTS (SHOWN DASHED) IS SHOWN SCHEMATIC ONLY AND IT TO 9 BE DESIGN-BUILD BY THE GENERAL CONTRACTOR. VERIFY FINAL LOCATIONS OF DOWNSPOUTS WITH +28'-11 7 8" OWNER. PROVIDE CONCRETE SPLASH BLOCK AT BASE. OWNER OPTION: USE FIBER CEMENT TOP OF PLATE 5 FASCIA AND SOFFIT IN LIEU OF HARDBOARD. 7 6. 5/4 X 12 PAINTED HARDBOARD TRIM. PROVIDE PREFINISHED 'Z' FLASHING AT TOP. OWNER OPTION: USE FIBER CEMENT TRIM IN LIEU OF HARDBOARD 8 7. 5/4 X 8 PAINTED HARDBOARD TRIM. PROVIDE PREFINISHED 'Z' FLASHING AT TOP. OWNER OPTION: USE FIBER CEMENT TRIM IN LIEU OF HARDBOARD. +19'-11 1 2" 11 8. 1 X 4 PAINTED HARDBOARD TRIM CORNERS AND TRANSITIONS, TYP. OWNER OPTION: USE FIBER THIRD FLOOR CEMENT TRIMS IN LIEU OF HARDBOARD. FINISH FLOOR 1 9. SHINGLE SIDING: PAINTED HARDBOARD SHINGLE STYLE SIDING. OWNER OPTION: USE FIBER CEMENT 2 SHINGLE SIDING IN LIEU OF HARDBOARD. 6 10. VERTICAL BOARD & BATTEN STYLE SIDING: PANTED 4' X 10' X 5/16" HARDBOARD PANELS WITH PAINTED 1 X 2 HARDBOARD BATTENS AT 12" O.C. OR PAINTED 1 X 3 HARDBOARD BATTENS AT +10'-0 1/8, 11 V-4" O.C. OWNER OPTION: USE FIBER CEMENT BOARD & BATTEN SIDING IN LIEU OF HARDBOARD. SECOND FLOOR 11. HORIZONTAL LAP SIDING: PAINTED HARDBOARD LAPPED SIDING WITH 6 INCH NOMINAL EXPOSURE. FINISH FLOOR 13 OWNER OPTION: USE FIBER CEMENT SIDING IN LIEU OF HARDBOARD. 12 12. PAINTED HARDBOARD COLUMN SIDING AND TRIMS. OWNER OPTION: USE FIBER CEMENT SIDING AND TRIMS IN LIEU OF HARDBOARD. p0 0 22 13. DECORATIVE EXTERIOR LIGHT FIXTURE. 0'-0" 23 14. STONE VENEER CAP. PROVIDE TRANSITION FLASHING PER MANUFACTURER. -_ FIRST FLOOR 15. STONE VENEER SIDING. 16. DOUBLE GLAZED VINYL FRAMED WINDOW PER WINDOW SCHEDULE WITH 1" X 6" PAINTED 7 19 21 21 20 11 bj 9 16 14 15 16 17 18 HARDBOARD TRIM AT TOP AND BOTTOM, 1" X 4" PAINTED HARDBOARD TRIM AT SIDES. SEE WINDOW SCHEDULE DETAILS FOR FLASHING REQUIREMENTS. OWNER OPTION: USE FIBER CEMENT BUILDING TYPE 3A TRIMS IN LIEU OF HARDBOARD. PROJECT FRONT ELEVATION 17. EXTERIOR DOOR PER DOOR SCHEDULE WITH 1" X 6" PAINTED HARDBOARD TRIM AT TOP, 1" X 4" PAINTED HARDBOARD TRIM AT SIDES. SEE DOOR SCHEDULE DETAILS FOR FLASHING REQUIREMENTS. OWNER OPTION: USE FIBER CEMENT TRIMS IN LIEU OF HARDBOARD. SCALE: 1/8" = 1'-0" 18. DECK STRUCTURE PER DECK DETAILS WITH CONCRETE TOP, PAINTED HARDBOARD CEILING, PAINTED SOUTHRIDGE HARDBOARD TRIMS AND PAINTED STEEL GUARDRAIL. OWNER OPTION: USE FIBER CEMENT CEILING AND TRIMS IN LIEU OF HARDBOARD. 19. FIRE SPRINKLER RISER CLOSET WITH ASPHALT SHINGLE ROOF WITH PRE-FINISHED METAL APARTMENTS FLASHINGS, 1 x PAINTED HARDBOARD FASCIA, SIDING AND TRIMS AND PAINTED INSULATED METAL AIIIII+40'-0"f 1 A9K+40'-0"f 1 DOOR. VERIFY WITH SITE PLAN AND CIVIL DRAWINGS FOR LOCATION OF CLOSET. OWNER OPTION: TOP OF ROOF TOP OF ROOF USE FIBER CEMENT TRIMS IN LIEU OF HARDBOARD.2 2 20 WALL CATIONUNT ELECTRICAL PANEL OF ELECTRICAL PANELSLOTHEIRNUTI UTILITY VERIFY EARTH SITE PLAN AND CIVIL DRAWINGS FOR TEN MILE R D. Q 3 3 21. WINDOW LOCATION OF FIRST FLOOR IS ADJUSTED TO ACCOMMODATE UTILITIES, VERIFY WITH FLOOR OVERLAND R D. PLANS. 4 4+28'-11 7 �" +28'-11 78" 22. EXPOSED CONCRETE FOUNDATION WALL. MERIDIAN, IDAHO 5 5 23. FINISH GRADE, SLOPE AWAY FROM BUILDING AT 2% MIN. SEE GRADING PLAN. TOP OF PLATE g WTOP OF PLATE g 9 9 GENERAL NOTES 7 7 A. ALL NOTES ON ELEVATIONS ARE TYPICAL AND APPLY TO ALL ELEVATIONS. +1RD F 1 2" 11 THIRD 1 1 2" _ 11 B. REFER TO CONSTRUCTION TYPE DETAILS SHEETS A10.0 AND A10.1 AND SPECIFICATIONS FOR THIRD FLOOR THIRD FLOOR ( ) FINISH FLOOR 1 g FINISH FLOOR 16 ADDITIONAL EXTERIOR FINISH MATERIAL NOTES. C. ALL VISIBLE EXTERIOR FLASHINGS TO BE PRE-FINISHED METAL (DARK BROWN) U.O.N. ALL 18I I I IT 11 111 1 1 111 1118 CONCEALED METAL FLASHING TO BE GALVANIZED METAL. ALL EXPOSED CAULKING NOT PAINTED TO MATCH ADJACENT MATERIAL FINISH COLOR. 14 14 D. SUB-CONTRACTORS TO PROVIDE 12" X 12" MIN. SAMPLE OF ALL FINISH MATERIALS FOR OWNER'S +10'-0 1 8" 15 ,+10'-0 1 8" 15 REVIEW AND ACCEPTANCE PRIOR TO CONSTRUCTION. SECOND FLOOR WSECOND FLOOR E. VERIFY ALL FINISH MATERIAL SELECTION AND COLORS WITH OWNER PRIOR TO ORDERING AND FINISH FLOOR ❑ 12 FlNISH FLOOR ❑ 12 INSTALLATION. 17 0 17 F. OWNER OPTION: HARDBOARD SIDING AND TRIMS TO BE ENGINEERED HARDBOARD OR FIBER CEMENT SIDING AND TRIMS. ALL SIDING AND TRIMS TO BE PRIMED (OR PRE-PRIMED), CAULKED PER SEAL 22 22 MANUFACTURER'S REQUIREMENTS AND AND PAINTED TWO FINISH COATS. 4G. ALL UTILITIES TO BE SCREENED OR BELOW GRADE. COORDINATE WITH MECHANICAL DRAWINGS AS 23 0'-0" 23 REQUIRED. FIRST FLOOR FIRST FLOOR H. ALL FINISH MATERIALS TO BE INSTALLED PER MANUFACTURER SPECIFICATIONS, 2012 IBC ` 13 12 17 16 6 13 12 17 16 6 REQUIREMENTS AND PER GENERALLY ACCEPTED CONSTRUCTION PRACTICES. BUILDING TYPE 3A BUILDING TYPE 3A EXTERIOR FINISH SCHEDULE 2 LEFT SIDE ELEVATION RIGHT SIDE ELEVATION ALL BUILDINGS Q SCALE: 1/8" = 1'-0" 3 SCALE: 1/8" = 1'-0" MATERIAL MFR / COLOR MATERIAL FINISH COLOR This document is the property of THE ARCHITECTS MANUFACTURER: GAF OFFICE,PLLC and is not to be duplicated without ASPHALT SHINGLE COLOR: TIMBERLINE NATURAL VINYL WINDOW FRAME MANUFACTURER: written authorization. SHADOW: BARKWOOD COLOR: ALMOND ©THE ARCHITECTS OFFICE,PLLC PAINTED HARDBOARD MFR: SHERWIN WILLIAMS COLOR: CLEAR +40'-0"t 1 FASCIA & SOFFIT PAINT NUMBER: SW6148 WINDOW GLAZING INSULATED FILE TOP OF ROOF COLOR NAME: WOOL SKEIN DATE 2 PANTED HARDBOARD DOOR & MFR: SHERWIN WILLIAMS POWDER COAT MAY 5, 2017 WINDOW TRIMS, BELLY BANDS, PAINT NUMBER: SW6148 METAL RAILING COLOR: BLACK 3 COLUMNS, CORBELS, ETC. COLOR NAME: WOOL SKEIN FILE NO. PRE—FINISHED METAL COLOR TO MATCH METAL STAIRS POWDER COAT 15-303 DD5.0 4 GUTTER & DOWNSPOUT SW6148 / WOOL SKEIN STRINGERS & RAILING COLOR: BLACK 9 DRAWN +28'-11 7 8" MFR: BORAL CULTURED EXPOSED METAL FACTORY PRE-FINISHED MATT RHEES TOP OF PLATE 5 STONE VENEER STONE - COUNTRY FLASHING COLOR: DARK BROWN LEDGESTONE: ASPEN 7 REVISIONS LT COLOR PALLET A 8 MATERIAL MFR / COLOR MATERIAL FINISH COLOR +19'-11 1 2" 11 PANTED HARDBOARD MFR: SHERWIN WILLIAMS MFR: SHERWIN WILLIAMS THIRD FLOOR SHINGLE SIDING OR BOARD PAINT NUMBER: SW2845 PAINTED HARDBOARD PAINT NUMBER: SW7680 FINISH FLOOR 1 & BATTEN SIDING COLOR NAME: BUNGLEHOUSE GRAY LAP SIDING COLOR NAME: LANYARD 2 COLOR PALLET B 6 MATERIAL MFR / COLOR MATERIAL FINISH COLOR .$+10'-0 1/8' 11 PANTED HARDBOARD MFR: SHERWIN WILLIAMS PAINTED HARDBOARD MFR: SHERWIN WILLIAMS SECOND FLOOR -------------- FINISH FLOOR 13 & BATTEN SIDING COLOR NAME: OAK CREEK LAP SIDING COLOR NAME: TIKI HUT 12 EDP_ dd11. U1 IRE A 11 COLOR PALLET C 22 MATERIAL MFR / COLOR MATERIAL FINISH COLOR SHEET 0'-0" 23 PANTED HARDBOARD MFR: SHERWIN WILLIAMS MFR: SHERWIN WILLIAMS FIRST FLOOR PAINTED HARDBOARD SHINGLE SIDING OR BOARD PAINT NUMBER: SW7540 PAINT NUMBER: SW6151 7 11 16 14 15 16 17 18 & BATTEN SIDING COLOR NAME: ARTISAN TAN LAP SIDING COLOR NAME: QUIVER TAN BUILDING TYPE 3A COLOR PALLET D REAR ELEVATION PANTED MATERIAL MFR / COLOR MATERIAL FINISH COLOR HARDBOARD MFR: SHERWIN WILLIAMS PAINTED HARDBOARD MFR: SHERWIN WILLIAMS BUILDING TYPE 3A 4SCALE:1/8" = V-0" SHINGLE SIDING OR BOARD PAINT NUMBER: SW7737 LAP SIDING PAINT NUMBER: SW7034 & BATTEN SIDING COLOR NAME: MEADOW TRIAL COLOR NAME: STATUS BRONZE ELEVATIONS KEYNOTES ® PRICE 1. ASPHALT SHINGLE RIDGE / HIP CAP. SEE ROOF PLAN FOR LOCATION AND TYPES OF ROOF ATTIC SANDERS VENTING. RHEES 2. ARCHITECTURAL LAMINATED FIBERGLASS ROOF SHINGLES. RUBY oL+40'-0°f 1 3. 6 X 12 PAINTED WOOD CORBEL. TOP OF ROOF 4. RAKE FASCIA: 1 X 4 PAINTED HARDBOARD FASCIA OVER 5/4 X 8 PAINTED HARDBOARD FASCIA. 2 PROVIDE PAINTED 5/16" HARDBOARD SOFFIT. OWNER OPTION: USE FIBER CEMENT FASCIA, AND 3 SOFFIT IN LIEU OF HARDBOARD. THI AR(HITE(TSOFFI(E C� 5. EAVE FASCIA: 5/4 X 8 PAINTED HARDBOARD. PROVIDE PAINTED 5/16" HARDBOARD VENTED SOFFIT 499 MAIN STREET (2 0 8) 3 4 3 2 9 31 4 AT EAVES. PROVIDE PRE—FINISHED METAL GUTTER AND DOWNSPOUT PER ROOF PLAN. FINAL BOISE, IDAHO 83702 T A 0 I D A H 0.C 0 M LOCATION AND NUMBER OF DOWNSPOUTS (SHOWN DASHED) IS SHOWN SCHEMATIC ONLY AND IT TO 10 BE DESIGN—BUILD BY THE GENERAL CONTRACTOR. VERIFY FINAL LOCATIONS OF DOWNSPOUTS WITH 111 7 8" OWNER. PROVIDE CONCRETE SPLASH BLOCK AT BASE. OWNER OPTION: USE FIBER CEMENT TOP OF PLATE 5 FASCIA AND SOFFIT IN LIEU OF HARDBOARD. 7 6. 5/4 X 12 PAINTED HARDBOARD TRIM. PROVIDE PREFINISHED 'Z' FLASHING AT TOP. OWNER OPTION: USE FIBER CEMENT TRIM IN LIEU OF HARDBOARD 8 7. 5/4 X 8 PAINTED HARDBOARD TRIM. PROVIDE PREFINISHED 'Z' FLASHING AT TOP. OWNER OPTION: USE FIBER CEMENT TRIM IN LIEU OF HARDBOARD. +19'-11 1 2" 10 8. 1 X 4 PAINTED HARDBOARD TRIM CORNERS AND TRANSITIONS, TYP. OWNER OPTION: USE FIBER THIRD FLOOR � CEMENT TRIMS IN LIEU OF HARDBOARD. FINISH FLOOR 1 9. SHINGLE SIDING: PAINTED HARDBOARD SHINGLE STYLE SIDING. OWNER OPTION: USE FIBER CEMENT 2 SHINGLE SIDING IN LIEU OF HARDBOARD. it EO T�4 6 10. VERTICAL BOARD & BATTEN STYLE SIDING: PANTED 4' X 10' X 5/16" HARDBOARD PANELS WITH PAINTED 1 X 2 HARDBOARD BATTENS AT 12" O.C. OR PAINTED 1 X 3 HARDBOARD BATTENS AT OL+10'-0 1/8' FF" 11 1'-4" O.C. OWNER OPTION: USE FIBER CEMENT BOARD & BATTEN SIDING IN LIEU OF HARDBOARD. SECOND FLOOR 11. HORIZONTAL LAP SIDING: PAINTED HARDBOARD LAPPED SIDING WITH 6 INCH NOMINAL EXPOSURE. FINISH FLOOR 13 OWNER OPTION: USE FIBER CEMENT SIDING IN LIEU OF HARDBOARD. 12 12. PAINTED HARDBOARD COLUMN SIDING AND TRIMS. OWNER OPTION: USE FIBER CEMENT SIDING AND 00 TRIMS IN LIEU OF HARDBOARD. no a LA 22 13. DECORATIVE EXTERIOR LIGHT FIXTURE. 14. STONE VENEER CAP. PROVIDE TRANSITION FLASHING PER MANUFACTURER. OL 0'-0" 23 FIRST FLOOR 15. STONE VENEER SIDING. 16. DOUBLE GLAZED VINYL FRAMED WINDOW PER WINDOW SCHEDULE WITH 1" X 6" PAINTED 19 21 7 21 20 7 11 16 14 15 16 17 18 HARDBOARD TRIM AT TOP AND BOTTOM, 1" X 4" PAINTED HARDBOARD TRIM AT SIDES. SEE WINDOW SCHEDULE DETAILS FOR FLASHING REQUIREMENTS. OWNER OPTION: USE FIBER CEMENT BUILDING TYPE 3B TRIMS IN LIEU OF HARDBOARD. PROJECT FRONT ELEVATION 17. EXTERIOR DOOR PER DOOR SCHEDULE WITH 1" X 6" PAINTED HARDBOARD TRIM AT TOP, 1" X 4" PAINTED HARDBOARD TRIM AT SIDES. SEE DOOR SCHEDULE DETAILS FOR FLASHING REQUIREMENTS. OWNER OPTION: USE FIBER CEMENT TRIMS IN LIEU OF HARDBOARD. SCALE: 1/8" = 1'-0" 18. DECK STRUCTURE PER DECK DETAILS WITH CONCRETE TOP, PAINTED HARDBOARD CEILING, PAINTED SOUTHRIDGE HARDBOARD TRIMS AND PAINTED STEEL GUARDRAIL. OWNER OPTION: USE FIBER CEMENT CEILING AND TRIMS IN LIEU OF HARDBOARD. 19. FIRE SPRINKLER RISER CLOSET WITH ASPHALT SHINGLE ROOF WITH PRE—FINISHED METAL APARTMENTS FLASHINGS, 1 x PAINTED HARDBOARD FASCIA, SIDING AND TRIMS AND PAINTED INSULATED METAL OL+40'-0"f 1 +40'-0"1 1 DOOR. VERIFY WITH SITE PLAN AND CIVIL DRAWINGS FOR LOCATION OF CLOSET. OWNER OPTION: TOP OF ROOF TOP OF ROOF USE FIBER CEMENT TRIMS IN LIEU OF HARDBOARD.2 2 20 WALL CATIONUNT ELECTRICAL PANEL OF ELECTRICAL PANELSLOTHEIRNUTI UTILITY VERIFY EARTH SITE PLAN AND CIVIL DRAWINGS FOR TEN MILE R D. Q 3 3 21. WINDOW LOCATION OF FIRST FLOOR IS ADJUSTED TO ACCOMMODATE UTILITIES, VERIFY WITH FLOOR OVERLAND R D. PLANS. 4 4 22. EXPOSED CONCRETE FOUNDATION WALL. MERIDIAN, IDAHO 0111 7/8 5 Q Q 5 23. FINISH GRADE, SLOPE AWAY FROM BUILDING AT 2% MIN. SEE GRADING PLAN. TOP OF PLATE g WTOP OF PLATE 7 8 ,0 ,0 GENERAL NOTES THIRD FLOOR TTHIRDHIRD FLOOR A. ALL NOTES ON ELEVATIONS ARE TYPICAL AND APPLY TO ALL ELEVATIONS. +19'-11 1 2" 14 1 1 2" 14 B. REFER TO CONSTRUCTION TYPE DETAILS (SHEETS A10.0 AND A10.1) AND SPECIFICATIONS FOR FlNISH FLOOR 15 FINISH FLOOR 15 ADDITIONAL EXTERIOR FINISH MATERIAL NOTES. C. ALL VISIBLE EXTERIOR FLASHINGS TO BE PRE—FINISHED METAL (DARK BROWN) U.O.N. ALL 11 11 CONCEALED METAL FLASHING TO BE GALVANIZED METAL. ALL EXPOSED CAULKING NOT PAINTED TO MATCH ADJACENT MATERIAL FINISH COLOR. 8 18 D. SUB—CONTRACTORS TO PROVIDE 12" X 12" MIN. SAMPLE OF ALL FINISH MATERIALS FOR OWNER'S 10 1/8' IL 16 +10 ) 1/8' KIM16 REVIEW AND ACCEPTANCE PRIOR TO CONSTRUCTION. SECOND FLOOR SECOND FLOOR E. VERIFY ALL FINISH MATERIAL SELECTION AND COLORS WITH OWNER PRIOR TO ORDERING AND FlNISH FLOOR ❑ 12 FINISH FLOOR ❑ 12 INSTALLATION. 0 17 17 F. OWNER OPTION: HARDBOARD SIDING AND TRIMS TO BE ENGINEERED HARDBOARD OR FIBER CEMENT SIDING AND TRIMS. ALL SIDING AND TRIMS TO BE PRIMED (OR PRE—PRIMED), CAULKED PER SEAL 22 22 MANUFACTURER'S REQUIREMENTS AND AND PAINTED TWO FINISH COATS. G. ALL UTILITIES TO BE SCREENED OR BELOW GRADE. COORDINATE WITH MECHANICAL DRAWINGS AS 0'-0° L 23 OL0'-0" 23 REQUIRED. FIRST FLOOR FIRST FLOOR H. ALL FINISH MATERIALS TO BE INSTALLED PER MANUFACTURER SPECIFICATIONS, 2012 IBC ` 13 12 17 16 6 13 12 17 16 6 REQUIREMENTS AND PER GENERALLY ACCEPTED CONSTRUCTION PRACTICES. BUILDING TYPE 3B BUILDING TYPE 3B EXTERIOR FINISH SCHEDULE 2 LEFT SIDE ELEVATION RIGHT SIDE ELEVATION ALL BUILDINGS Q SCALE: 1/8" = 1'-0" 3 SCALE: 1/8" = 1'-0" MATERIAL MFR / COLOR MATERIAL FINISH COLOR This document is the property of THE ARCHITECTS MANUFACTURER: GAF OFFICE,PLLC and is not to be duplicated without ASPHALT SHINGLE COLOR: TIMBERLINE NATURAL VINYL WINDOW FRAME MANUFACTURER: written authorization. SHADOW: BARKWOOD COLOR: ALMOND ©THE ARCHITECTS OFFICE,PLLC PAINTED HARDBOARD MFR: SHERWIN WILLIAMS COLOR: CLEAR OL+40'-0"± 1 FASCIA & SOFFIT PAINT NUMBER: SW6148 WINDOW GLAZING INSULATED FILE TOP OF ROOF COLOR NAME: WOOL SKEIN DATE 2 PANTED HARDBOARD DOOR & MFR: SHERWIN WILLIAMS POWDER COAT MAY 5, 2017 WINDOW TRIMS, BELLY BANDS, PAINT NUMBER: SW6148 METAL RAILING COLOR: BLACK 3 COLUMNS, CORBELS, ETC. COLOR NAME: WOOL SKEIN FILE NO. PRE—FINISHED METAL COLOR TO MATCH METAL STAIRS POWDER COAT 15-303 DD5.0 4 GUTTER & DOWNSPOUT SW6148 / WOOL SKEIN STRINGERS & RAILING COLOR: BLACK 10 DRAWN +28,_11 7 8" MFR: — COUNTRY CULTURED EXPOSED METAL FACTORY PRE—FINISHED MATT RHEES TOP OF PLATE 5 STONE VENEER STONE — C LEDGESTONE: ASPEN FLASHING COLOR: DARK BROWN 7 REVISIONS Ell E COLOR PALLET A 8 MATERIAL MFR / COLOR MATERIAL FINISH COLOR 111 1 2° 10 PANTED HARDBOARD MFR: SHERWIN WILLIAMS MFR: SHERWIN WILLIAMS THIRD FLOOR SHINGLE SIDING OR BOARD PAINT NUMBER: SW2845 PAINTED HARDBOARD PAINT NUMBER: SW7680 FINISH FLOOR 1 & BATTEN SIDING COLOR NAME: BUNGLEHOUSE GRAY LAP SIDING COLOR NAME: LANYARD 2 COLOR PALLET B 6 MATERIAL MFR / COLOR MATERIAL FINISH COLOR 10 1/8 11 PANTED HARDBOARD MFR: SHERWIN WILLIAMS PAINTED HARDBOARD MFR: SHERWIN WILLIAMS SECOND FLOOR SHINGLE SIDING OR BOARD PAINT NUMBER: SW7718 PAINT NUMBER: SW7509 FINISH FLOOR 13 & BATTEN SIDING COLOR NAME: OAK CREEK LAP SIDING COLOR NAME: TIKI HUT 12 OEM UERE 1 FE� '7 COLOR PALLET C 22 MATERIAL MFR / COLOR MATERIAL FINISH COLOR SHEET HEET 23 PANTED HARDBOARD MFR: SHERWIN WILLIAMS MFR: SHERWIN WILLIAMS FIRST FLOOR PAINTED HARDBOARD SHINGLE SIDING OR BOARD PAINT NUMBER: SW7540 PAINT NUMBER: SW6151 7 11 16 14 15 16 17 18 & BATTEN SIDING COLOR NAME: ARTISAN TAN LAP SIDING COLOR NAME: QUIVER TAN BUILDING TYPE 3B COLOR PALLET D REAR ELEVATION PANTED MATERIAL MFR / COLOR MATERIAL FINISH COLOR HARDBOARD MFR: SHERWIN WILLIAMS PAINTED HARDBOARD MFR: SHERWIN WILLIAMS BUILDING TYPE 3B 4SCALE:1/8" = 1'-0° SHINGLE SIDING OR BOARD PAINT NUMBER: SW7737 LAP SIDING PAINT NUMBER: SW7034 & BATTEN SIDING COLOR NAME: MEADOW TRAIL COLOR NAME: STATUS BRONZE ELEVATIONS KEYNOTES ® PRICE 1. ASPHALT SHINGLE RIDGE / HIP CAP. SEE ROOF PLAN FOR LOCATION AND TYPES OF ROOF ATTIC SANDERS VENTING. RHEES 2. ARCHITECTURAL LAMINATED FIBERGLASS ROOF SHINGLES. RUBY ot+40'-0"t 1 3. 6 X 12 PAINTED WOOD CORBEL. TOP OF ROOF 4. RAKE FASCIA: 1 X 4 PAINTED HARDBOARD FASCIA OVER 5/4 X 8 PAINTED HARDBOARD FASCIA. 2 PROVIDE PAINTED 5/16" HARDBOARD SOFFIT. OWNER OPTION: USE FIBER CEMENT FASCIA, AND I 3SOFFIT IN LIEU OF HARDBOARD. TH AR(HITE(TSOFFI(E C� 5. EAVE FASCIA: 5/4 X 8 PAINTED HARDBOARD. PROVIDE PAINTED 5/16" HARDBOARD VENTED SOFFIT 499 MAIN STREET (2 0 8) 3 4 3 2 9 31 4 AT EAVES. PROVIDE PRE—FINISHED METAL GUTTER AND DOWNSPOUT PER ROOF PLAN. FINAL BOISE, IDAHO 83702 T A 0 I D A H 0.C 0 M LOCATION AND NUMBER OF DOWNSPOUTS (SHOWN DASHED) IS SHOWN SCHEMATIC ONLY AND IT TO 9 BE DESIGN—BUILD BY THE GENERAL CONTRACTOR. VERIFY FINAL LOCATIONS OF DOWNSPOUTS WITH + 8" IIIOWNER. PROVIDE CONCRETE SPLASH BLOCK AT BASE. OWNER OPTION: USE FIBER CEMENT TOPP O OF F PLATE 5 FASCIA AND SOFFIT IN LIEU OF HARDBOARD. 7 6. 5/4 X 12 PAINTED HARDBOARD TRIM. PROVIDE PREFINISHED 'Z' FLASHING AT TOP. OWNER OPTION: USE FIBER CEMENT TRIM IN LIEU OF HARDBOARD 8 7. 5/4 X 8 PAINTED HARDBOARD TRIM. PROVIDE PREFINISHED 'Z' FLASHING AT TOP. OWNER OPTION: USE FIBER CEMENT TRIM IN LIEU OF HARDBOARD. +19'-11 1 2" 11 8. 1 X 4 PAINTED HARDBOARD TRIM CORNERS AND TRANSITIONS, TYP. OWNER OPTION: USE FIBER THIRD FLOOR CEMENT TRIMS IN LIEU OF HARDBOARD. FINISH FLOOR 1 9. SHINGLE SIDING: PAINTED HARDBOARD SHINGLE STYLE SIDING. OWNER OPTION: USE FIBER CEMENT 2 SHINGLE SIDING IN LIEU OF HARDBOARD. 6 10. VERTICAL BOARD & BATTEN STYLE SIDING: PANTED 4' X 10' X 5/16" HARDBOARD PANELS WITH PAINTED 1 X 2 HARDBOARD BATTENS AT 12" O.C. OR PAINTED 1 X 3 HARDBOARD BATTENS AT +10'-0 1 8" 11 1'-4" O.C. OWNER OPTION: USE FIBER CEMENT BOARD & BATTEN SIDING IN LIEU OF HARDBOARD. SECOND FLOOR 11. HORIZONTAL LAP SIDING: PAINTED HARDBOARD LAPPED SIDING WITH 6 INCH NOMINAL EXPOSURE. FINISH FLOOR 13 OWNER OPTION: USE FIBER CEMENT SIDING IN LIEU OF HARDBOARD. 12 12. PAINTED HARDBOARD COLUMN SIDING AND TRIMS. OWNER OPTION: USE FIBER CEMENT SIDING AND OD C TRIMS IN LIEU OF HARDBOARD. 00 0 22 13. DECORATIVE EXTERIOR LIGHT FIXTURE. 14. STONE VENEER CAP. PROVIDE TRANSITION FLASHING PER MANUFACTURER. 0'-0" 23 15. STONE VENEER SIDING. FlRST FLOOR 16. DOUBLE GLAZED VINYL FRAMED WINDOW PER WINDOW SCHEDULE WITH 1" X 6" PAINTED 7 19 21 9 11 21 20 16 14 15 16 17 18 HARDBOARD TRIM AT TOP AND BOTTOM, 1" X 4" PAINTED HARDBOARD TRIM AT SIDES. SEE WINDOW SCHEDULE DETAILS FOR FLASHING REQUIREMENTS. OWNER OPTION: USE FIBER CEMENT BUILDING TYPE 4A TRIMS IN LIEU OF HARDBOARD. PROJECT FRONT ELEVATION 17. EXTERIOR DOOR PER DOOR SCHEDULE WITH 1" X 6" PAINTED HARDBOARD TRIM AT TOP, 1" X 4" PAINTED HARDBOARD TRIM AT SIDES. SEE DOOR SCHEDULE DETAILS FOR FLASHING REQUIREMENTS. OWNER OPTION: USE FIBER CEMENT TRIMS IN LIEU OF HARDBOARD. SCALE: 1/8" = 1'-0" 18. DECK STRUCTURE PER DECK DETAILS WITH CONCRETE TOP, PAINTED HARDBOARD CEILING, PAINTED SOUTHRIDGE HARDBOARD TRIMS AND PAINTED STEEL GUARDRAIL. OWNER OPTION: USE FIBER CEMENT CEILING AND TRIMS IN LIEU OF HARDBOARD. 19. FIRE SPRINKLER RISER CLOSET WITH ASPHALT SHINGLE ROOF WITH PRE—FINISHED METAL APARTMENTS FLASHINGS, 1 x PAINTED HARDBOARD FASCIA, SIDING AND TRIMS AND PAINTED INSULATED METAL +40'-0°t 1 +40'-0"f 1 DOOR. VERIFY WITH SITE PLAN AND CIVIL DRAWINGS FOR LOCATION OF CLOSET. OWNER OPTION: TOP OF ROOF TOP OF ROOF USE FIBER CEMENT TRIMS IN LIEU OF HARDBOARD.2 2 20 WALL CATIONUNT ELECTRICAL PANEL OF ELECTRICAL PANELSLOTHEIRNUTI UTILITY VERIFY EARTH SITE PLAN AND CIVIL DRAWINGS FOR TEN MILE R D. Q 3 3 21. WINDOW LOCATION OF FIRST FLOOR IS ADJUSTED TO ACCOMMODATE UTILITIES, VERIFY WITH FLOOR OVERLAND R D. PLANS. 4 4 22. EXPOSED CONCRETE FOUNDATION WALL. MERIDIAN, IDAHO '/ 5 Q 8 5 23. FINISH GRADE, SLOPE AWAY FROM BUILDING AT 2% MIN. SEE GRADING PLAN. +28'-11 / 8" +28'-11 7 (�" TOP OF PLATE g WTOP OF PLATE g 9 EE 9 GENERAL NOTES 7 7 A. ALL NOTES ON ELEVATIONS ARE TYPICAL AND APPLY TO ALL ELEVATIONS. THIRD FLOOR " THIRD FLOOR " 11 B. REFER TO CONSTRUCTION TYPE DETAILS (SHEETS A10.0 AND A10.1) AND SPECIFICATIONS FOR FINISH FLOOR 16 FINISH FLOOR 16 ADDITIONAL EXTERIOR FINISH MATERIAL NOTES. C. ALL VISIBLE EXTERIOR FLASHINGS TO BE PRE—FINISHED METAL (DARK BROWN) U.O.N. ALL 18 18 CONCEALED METAL FLASHING TO BE GALVANIZED METAL. ALL EXPOSED CAULKING NOT PAINTED TO MATCH ADJACENT MATERIAL FINISH COLOR. 14 14 D. SUB—CONTRACTORS TO PROVIDE 12" X 12" MIN. SAMPLE OF ALL FINISH MATERIALS FOR OWNER'S +10'-0 1/8" 15 +10'-0 1/8" 15 REVIEW AND ACCEPTANCE PRIOR TO CONSTRUCTION. SECOND FLOOR SECOND FLOOR E. VERIFY ALL FINISH MATERIAL SELECTION AND COLORS WITH OWNER PRIOR TO ORDERING AND FINISH FLOOR ❑ 12 FINISH FLOOR ❑ 12 INSTALLATION. 0 17 17 F. OWNER OPTION: HARDBOARD SIDING AND TRIMS TO BE ENGINEERED HARDBOARD OR FIBER CEMENT SIDING AND TRIMS. ALL SIDING AND TRIMS TO BE PRIMED (OR PRE—PRIMED), CAULKED PER SEAL 22 22 MANUFACTURER'S REQUIREMENTS AND AND PAINTED TWO FINISH COATS. G. ALL UTILITIES TO BE SCREENED OR BELOW GRADE. COORDINATE WITH MECHANICAL DRAWINGS AS 0'—O" 23 REQUIRED. FIRST FLOOR FIRST FLOOR H. ALL FINISH MATERIALS TO BE INSTALLED PER MANUFACTURER SPECIFICATIONS, 2012 IBC ` 13 12 17 777 13 12 17J 16 6 REQUIREMENTS AND PER GENERALLY ACCEPTED CONSTRUCTION PRACTICES. 2QBUILDING TYPE 4A BUILDING TYPE 4A EXTERIOR FINISH SCHEDULE LEFT SIDE ELEVATION RIGHT SIDE ELEVATION ALL BUILDINGS SCALE: 1/8" = 1'-0" 3 SCALE: 1/8" = 1'-0" MATERIAL MFR / COLOR MATERIAL FINISH COLOR This document is the property of THE ARCHITECTS MANUFACTURER: GAF OFFICE,PLLC and is not to be duplicated without ASPHALT SHINGLE COLOR: TIMBERLINE NATURAL VINYL WINDOW FRAME MANUFACTURER: written authorization. SHADOW: BARKWOOD COLOR: ALMOND ©THE ARCHITECTS OFFICE,PLLC PAINTED HARDBOARD MFR: SHERWIN WILLIAMS COLOR: CLEAR FASCIA & SOFFIT PAINT NUMBER: SW6148 WINDOW GLAZING INSULATED FILE TOP OF ROOF COLOR NAME: WOOL SKEIN DATE 2 PAINTED HARDBOARD DOOR & MFR: SHERWIN WILLIAMS POWDER COAT MAY 5, 2017 WINDOW TRIMS, BELLY BANDS, PAINT NUMBER: SW6148 METAL RAILING COLOR: BLACK 3 COLUMNS, CORBELS, ETC. COLOR NAME: WOOL SKEIN FILE NO. PRE-FINISHED METAL COLOR TO MATCH METAL STAIRS POWDER COAT 15-303 DD5.0 4 GUTTER & DOWNSPOUT SW6148 / WOOL SKEIN STRINGERS & RAILING COLOR: BLACK 9 DRAWN +28'-11 7 8" IIIIII MFR: BORAL CULTURED EXPOSED METAL FACTORY PRE—FINISHED MATT RHEES TOP OF PLATE 5 STONE VENEER STONE — COUNTRY LEDGESTONE: ASPEN FLASHING COLOR: DARK BROWN it 11 11 LE 7 REVISIONS COLOR PALLET A 8 MATERIAL MFR / COLOR MATERIAL FINISH COLOR +19'-11 1 2" 14 _ _ 11 PAINTED HARDBOARD MFR: SHERWIN WILLIAMS MFR: SHERWIN WILLIAMS THIRD FLOOR SHINGLE SIDING OR BOARD PAINT NUMBER: SW2845 PAINTED HARDBOARD PAINT NUMBER: SW7680 FINISH FLOOR 1 & BATTEN SIDING COLOR NAME: BUNGLEHOUSE GRAY LAP SIDING COLOR NAME: LANYARD 2 COLOR PALLET B 6 Elul0MATERIAL MFR / COLOR MATERIAL FINISH COLOR OI _ +10'-0 1/8' _ all 11 PAINTED HARDBOARD MFR: SHERWIN WILLIAMS MFR: SHERWIN WILLIAMS SECOND FLOOR PAINTED HARDBOARD SHINGLE SIDING OR BOARD PAINT NUMBER: SW7718 PAINT NUMBER: SW7509 FINISH FLOOR 13 & BATTEN SIDING COLOR NAME: OAK CREEK LAP SIDING COLOR NAME: TIKI HUT 12 N L COLOR PALLET C 22 MATERIAL MFR / COLOR MATERIAL FINISH COLOR 0'-0" SHEET 23 FIRST FLOOR PAINTED HARDBOARD MFR: SHERWIN WILLIAMS PAINTED HARDBOARD MFR: SHERWIN WILLIAMS SHINGLE SIDING OR BOARD PAINT NUMBER: SW7540 PAINT NUMBER: SW6151 7 11 16 14 15 16 17 18 & BATTEN SIDING COLOR NAME: ARTISAN TAN LAP SIDING COLOR NAME: QUIVER TAN BUILDING TYPE 4A COLOR PALLET D REAR ELEVATION PAINTED MATERIAL MFR / COLOR MATERIAL FINISH COLOR HARDBOARD MFR: SHERWIN WILLIAMS PAINTED HARDBOARD MFR: SHERWIN WILLIAMS BUILDING TYPE 4A 4SCALE:1/8" = 1'-0" SHINGLE SIDING OR BOARD PAINT NUMBER: SW7737 LAP SIDING PAINT NUMBER: SW7034 & BATTEN SIDING COLOR NAME: MEADOW TRAIL COLOR NAME: STATUS BRONZE ELEVATIONS