Loading...
CC - Engineer Statementkm E N G I N E E R I N G July 19, 2022 Project No. 21-240 City of Meridian 33 E Broadway Ave., Ste. 210 Meridian, Idaho 83642 RE: Pollard Subdivision No. 1 Meridian, Idaho To Whom It May Concern: Please accept this letter as certification that the centerline elevations of the proposed streets within Pollard Subdivision No. 1 are designed a minimum of three (3) feet above the seasonal high ground water elevation. The geotechnical engineering report, "Pollard Lane Realignment", prepared by MTI and dated August 31, 2016, was used to determine the approximate groundwater elevations relative to the street centerline elevations. Please feel free to contact me at 208.639.6939 should you have questions or require any additional information. Sincerely, KM Engineering, LLP S\ON A L EN GENS, Digitally signed by 16860 Lachlin C Kinsella, P.E. s 7/191'22 o Date:2022.07.19 �q 19:32:14-06'00' �� TF OF \�PIV Lachlin Kinsella, P.E. Project Manger 5725 North Discovery Way • Boise, Idaho 83713 • 208.639.6939 • kmengllp.com