Loading...
CC - Landscape PlanPURDAM GULi STUB DR, NMID ACCES SOOOSF DF GRASSY AF Specific Notes: Planting Schedule: A. EXISTING TREES LOCATED WITHIN THE PURDAM DRAIN EASEMENT WILL BE REMOVED PER NAMPA MERIDIAN Key Botanical Name Common Name Mature Size Size Qty IRRIGATION DISTRICT REQUIREMENTS. (H x Vl) Planted B. ALL EXISTING STRUCTURES INCLUDE A DETACHED GARAGE, TREE GUIDE 2 SHOPS, 2 BARNS AND A HOUSE WILL BE REMOVED PRIOR CLASS 1 TO DEVELOPMENT. C. SECTION 11-3B-7 IS NOT APPLICABLE TO LOCAL STREETS ALONG SINGLE DP Pyrus calleryana jaczam' Dwarf Flowering Pear 15' x 10' 2" 10 FAMILY, DUPLEX OR TOWNHOME PROPERTIES. CC Prunus Virginiana Chokecherry 20' x 20' 2" 2 D. WHERE STREET TREES ARE WITHIN THE PARKWAY, THEY SHALL BE CENTERED WITHIN THE PARKWAY PLANTER AREA. WHERE STREET TREES ARE NOT WITHIN A PARKWAY, THEY SHALL BE OFFSET A CLASS 11 MINIMUM OF FIVE FEET (5)FROM THE EDGE OF THE SIDEWALK. FP Pyrus calleryana Flowering Pear 40' x 25' 2" 16 E. A ROOT BARRIER SHALL BE PROVIDED IN THE LOCAL STREET LANDSCAPE BUFFERS. TOTAL TREES: 204OF / 35 = 58 TREES F OPEN GRASSY AREA PATHWAYS: 1 TREE PER 100LF = 2 TREES NM Acer plantanoides Norway Maple 45' x 35' 2" 23 G. LANDSCAPE BUFFERS ALONG FRANKLIN ROAD ARE 67' x 25' EACH SIDE OF ENTRY ROAD, MEASURED FROM THE BACK OF ATTACHED SIDEWALK. TOTAL NUMBER OF REQUIRED TREES IS 4. TREES SHALL BE CLASS ii, EH Carpinus bartulus European Hornbeam 45' x 35' 2" 13 EXCEPT CLASS I TREES WILL BE USED NEAR THE UTILITY EASEMENT. 4" 5 H. COMMON AREA OPEN SPACE: 62,500 SF 0.4 ACRE). I. NUMBER OF RESIDENTIAL TREES REQUIRED: 64 SHRUB GUIDE ACHD Landscaping Notes: ;) SC Prunus x cistena Red -leaf Sand Cherry 8' x 7' 5 Gal 3 EG Euonymus fortunei Emerald Gaiety 5' x 6' 2 Gal 3 A. TREES SHALL NOT BE PLANTED WITHIN THE 10' CLEAR ZONE OF ALL BB Euonymux alatus Burning Bush 4' x 4' 5 Gal 9 ACHD STORM DRAIN PIPES, STRUCTURES, OR FACILITIES. RG Calamagrostis acutiflora Feather Reed Grass 4' x 3' 5 Gal 18 B. IF ACHD SEEPAGE BEDS ARE LOCATED WITHIN A COMMON LOT WHERE CB Berberis thunbergii Crimson Berberry 2' x 3' 5 Gal 15 IRRIGATION LINES WILL BE INSTALLED, SEEPAGE BEDS MUST BE PROTECTED MP Pinus Mugo Dwarf Mugo Pine X x 3' 3 Gal 21 FROM ANY AND ALL CONTAMINATION DURING THE CONSTRUCTION AND INSTALLATION OF THE LANDSCAPE IRRIGATION SYSTEM TURF GUIDE Tree Mitigation Notes: Festuca glauca XRE Tall Fescue Common areas A. THE TREES ALONG THE SOUTH WESTERN PROPERTY LINE ARE WITHIN THE 50 Festuca rubra Red Fescue Ditch banks EASEMENT OF THE PURDAM DRAIN. THESE TREES WILL BE REMOVED PER NAMPA MERIDIAN IRRIGATION DISTRICT REQUIREMENTS. B. THE TREES LOCATED IN THE CENTER OF THE PROPERTY WILL BE REMOVED. BLACK LOCUST. NO MITIGATION REQUIRED COTTONWOOD: NO MITIGATION REQUIRED NORWAY MAPLE: ONE 26- AND ONE 9- REQUIRE MITIGATION (TOTAL 35 ) C. TREE MITIGATION - IN ADDITION TO THE BASE REQUIREMENT, FIVE 4- TREES WILL BE PLANTED AT THE ENTRYWAY AND IN THE COMMON AREA (DOUBLE COUNT. 4- x 5 x 2 = 40") -- --- ---.- I MID '-' ------ 16' MIN Landscape Notes: A. CONTRACTOR SHALL REPORT ALL CONDITIONS WHICH IMPAIR AND/OR PREVENT THE PROPER EXECUTION OF THIS WORK, PRIOR TO BEGINNING WORK. B. FINISH GRADES TO BE SMOOTH AND EVEN GRADIENTS WITH POSITIVE DRAINAGE IN ACCORDANCE WITH SITE GRADING PLAN. REMOVE RIDGES AND ALL DEPRESSIONS AS REQUIRED TO MEET FINISH GRADES. 1-INCH BELOW TOP OF ADJACENT PAVEMENT, VALVE BOX, VAULT, ETC. C. ALL SOD AREAS SHALL HAVE A MINIMUM OF 6- OF TOPSOIL.. SPREAD, COMPACT AND FINE GRADE TOPSOIL TO A SMOOTH AND UNIFORM GRADE. D. RE -USE EXISTING SURFACE TOPSOIL WHERE POSSIBLE. VERIFY SUITABILITY OF SURFACE SOIL TO PRODUCE TOPSOIL MEETING REQUIREMENTS AND AMEND WHEN NECESSARY. TOPSOIL SHALL BE A LOOSE, SANDY LOAM, CLEAN AND FREE OF TOXIC MATERIALS, NOXIOUS WEEDS, WEED SEEDS, ROCKS, GRASS OR OTHER FOREIGN MATERIAL AND A PH OF 5.5 TO 7.0. IF ON -SITE TOPSOIL DOES NOT MEET THESE MINIMUM STANDARDS, CONTRACTORS ARE RESPONSIBLE TO EITHER: A) PROVIDE APPROVED IMPORTED TOPSOIL OR B) IMPROVE ON -SITE TOPSOIL WITH APPROVED METHODS. SUPPLEMENT WITH IMPORTED TOPSOIL WHEN QUANTITIES ARE INSUFFICIENT. CLEAN TOPSOIL OF ROOTS, PLANTS, SODS, STONES, CLAY LUMPS AND OTHER EXTRANEOUS MATERIALS HARMFUL TO PLANT GROWTH. E. IF IMPORTED TOPSOIL FROM OFF -SITE SOURCES IS REQUIRED, PROVIDE NEW TOPSOIL THAT IS FERTILE, NATURAL LOAM, SURFACE SOIL, REASONABLY FREE OF SUBSOIL, CLAY LUMPS, BRUSH, WEEDS AND OTHER LITTER, AND FREE OF ROOTS, STUMPS, STONES LARGER THAN 21NCHES IN ANY DIMENSION, AND OTHER EXTRANEOUS OR TOXIC MATTER HARMFUL TO PLANT GROWTH. F. OBTAIN TOPSOIL FROM LOCAL SOURCES OR FROM AREAS HAVING SIMILAR SOIL CHARACTERISTICS TO THAT FOUND AT PROJECT SITE. OBTAIN TOPSOIL ONLY FROM NATURALLY, WELL -DRAINED SITES WHERE TOPSOIL OCCURS IN A DEPTH OF NOT LESS THAN 4 INCHES. G. ALL LANDSCAPE AREAS SHALL BE WEED FREE AT THE TIME OF LANDSCAPE INSTALLATION. REMOVE ALL ROOTS, WEEDS, ROCK AND FOREIGN MATERIAL ON THE SURFACE. H. ALL PLANT MATERIAL SHALL CONFORM TO THE AMERICAN NURSERYMAN STANDARDS FOR TYPE AND SIZE SHOWN. PLANTS WILL BE REJECTED IF NOT IN A SOUND AND HEALTHY CONDITION. I. IMMEDIATELY CLEAN UP ANY TOPSOIL OR OTHER DEBRIS ON THE SITE CREATED FROM LANDSCAPE OPERATIONS AND DISPOSE OF PROPERLY OFF SITE. 40 80 40 FEET 3 Tree Planting Notes: 1. THE STAKING OF TREES IS TO BE THE CONTRACTOR'S OPTION; HOWEVER, THE CONTRACTOR IS RESPONSIBLE TO INSURE THATALL TREES ARE PLANTED STRAIGHTAND THAT THEYREMAIN STRAIGHT FOR A MINIMUM OF 1 YEAR. ALL STAKING SHALL BE REMOVED AT THE END OF THE ONE YEAR WARRANTY PERIOD. 2. IN THE EVENTOF A QUESTION OR LACK OF CLARITYON THE DRAWINGS, THE CONTRACTOR IS TO NOTIFYTHE LANDSCAPE ARCHITECT BEFORE PROCEEDING. 3. LANDSCAPE CONTRACTOR IS TO N011FYTHE LANDSCAPE ARCHITECTAND OWNER PRIOR TO INSTALLATION OF PLANT MATERIAL. 4. WRAP RUBBER CINCH TES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE STANDARD OR FIGURE EIGHT TYING METHOD. SECURE THE TIES TO THE STAKES WITH GALVANIZED NAILS TO PREVENT SLIPPAGE. 5. WATER TREE TWICE WITHIN THE FIRST24 HOURS. 6. IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY. Automatic Underground Irrigation Notes: A. ALL LANDSCAPED AREAS SHALL HAVE AN AUTOMATIC UNDERGROUND SPRINKLER SYSTEM WHICH ENSURES COMPLETE COVERAGE AND PROPERLY ZONED FOR REQUIRED WATER USES. B. EACH HYDROZONE IS TO BE IRRIGATED WITH SEPARATE INDMDUAL STATIONS. C. POP-UP SPRINKLER HEADS SHALL HAVE A MINIMUM RISER HEIGHT OF 6' AT LAWN AREAS. D. ELECTRONIC WATER DISTRIBUTION/ TIMING CONTROLLERS ARE TO BE PROVIDED. MINIMUM CONTROLLER REQUIREMENTS ARE AS FOLLOWS: D.A. PRECISE INDIVIDUAL STATION TIMING D.B. RUN TIME CAPABILITIES FOR EXTREMES IN PRECIPITATION RATES D.C. AT LEAST ONE PROGRAM FOR EACH HYDROZONE D.D. SUFFICIENT MULTIPLE CYCLES TO AVOID WATER RUN-OFF D.E. POWER FAILURE BACKUP FOR ALL PROGRAMMED INDIVIDUAL VALVED WATERING STATIONS WILL BE DESIGNED AND INSTALLED TO PROVIDE WATER TO RESPECTIVE HYDRO -ZONES. E. INOMDUAL VALVED WATERING STATIONS WILL BE DESIGNED AND INSTALLED TO PROVIDE WATER TO RESPECTIVE HYDRO -ZONES. F. THE IRRIGATION SYSTEM SHALL BE DESIGNED TO PROVIDE 100% COVERAGE WITH HEAD TO HEAD SPACING OR TRIANGULAR SPACING AS APPROPRIATE. G. SPRINKLER HEADS SHALL BE ADJUSTED TO REDUCE OVERSPRAY ONTO IMPERVIOUS SURFACES SUCH AS SIDEWALKS, DRNEWAYS, AND PARKING AREA. H. EACH VALVE SHALL BE INSTALLED IN A VALVE BOX LARGE ENOUGH TO ALLOW FOR MAINTENANCE AND REMOVAL. ONLY ONE VALVE PER BOX. q QM ❑o Q�oq a� (-) ~ LL z _Lj3_Q U o U C � co a a� QMQLd CL -I' CL GO z J � tiLI—O U Z N N N N L'iOI-off�Ri LLI F_ ❑ Z Ld ❑ U ci�f O 03 z❑LLIN❑o LLIc1fgOuWOu �D O Ld z W CL LLj � Q LLI J M,y d- LLJ M U CL cl q ❑ 33 J W L 03 %��"tico LLI❑LLIM❑o gz��WtU Ou ❑ O Cu C Ld ❑ LL ❑ 2 Q L7