CC - Drainage Calcs PROJECT NO . 10 = 17 =007 DRAINAGE CALCULATIONS FOR The Oaks Subidivions No . 6 City of Meridian Ada County , Idaho February 2017 2 ` 4 0f J • U • B ENGINEERS , INC . 250 S . Beechwood Drive , #201 Boise , Idaho 83709 208 =376 -7330 PROJECT NO. 10-17-007 The Oaks Subidivions No.6 SITE OVERVIEW The Oaks Subdivision No. 6 is located at the southwest corner of W. McMillan Road and N. Rustic Oak Way in Meridian, Idaho.The proposed development consists of 20 single family residential lots located on approximately 13.2 acres. EXISTING DRAINAGE The existing project site presently consists of a vacant agricultural field. The site is bounded by developed single family residential properties to the north and east,and agricultural land to the west and south.The ground slopes gently from northeast to southwest at grades generally less than 2%. DRAINAGE DESIGN CONCEPT The proposed stormwater improvements include the installation of roadways, pipe networks, stormwater treatment systems,and storage facilities.The surface flow will be directed to and contained within the road sections to designed low points where inlets will capture the stormwater and convey it through a pipe network to a discharge location. A treatment system will be installed for each pipe network prior to allowing the stormwater to be be discharged to the storage facility. The site was divided into catchment areas based on the inlet locations. Each catchement area was analyzed for the 25-year flow rate for conveyance,the water quality event for treatment and the 100-year runoff for storage. CALCULATION METHODS Calcualtions were prepared in accordance with the current edition of the Ada County Highway District Stormwater Policy Manual using the rational method (Q=CIA).The catchment areas are shown on the Drainage Catchment Plan. The average rainfall intensity is estimated from the "Rainfall Intensity-Duration-Frequency Relationship"figure for each storm event noted. The time of concentration is determined using the TR-55 method and combines the longest overland grass flow time to gutter flow time. Calculations and spreadsheets are included with this report for all catchment areas. t SOIL CONDITIONS Based upon the preliminary soils and subsurface investigation provided in the soils report for this subdivision,the existing soils will accept the runoff. However,in the event that during construction the contractor encounters either groundwater or rock,a revised design will be done based upon field conditions. I i 4 t i (E( t I i FAProjects\JUB\10-17-007-Oaks No 6\Drainage\Oaks 6 Drainage-Copy.xlsx ƒ ® \ � b § $ ) \ \ c4 § \ § % \ q ƒ G co ) t ® qtf < \ oE _ � Ct 0 { k § / \ } / 2 Leo 0 eeeR � q > :0 m % } { \ 2 § % : » kCD & \ \ % \ \ \ � ; n m a_ ® 3o / / § § § k " \ 00 & ° 2 ~ 3m Gq & « 22wa \ � � k g \ § / \ q k 0 ® LL � � \ / § ( § ® ! ` t 2 / « ƒ / � « Mcc 0 Lo - Ln / I \ ) 900 _ < ~ � � w w ° § § § § : Q { \ \ \ \ * ! CIL 00 / A um ) / G { ) A ° ~ - k � / 2 j N \} / e ar } „ 2J LO » Lo cn \ \ a CD \ \ ) Q { Q / n / E � )Ama ; ) e & $ } \ CD CD CD CD - M � § J a -co � � � ® ` � ° ° � d � ) / 2 � / / 0 ` � e % ; 6 2 = � & Et; 9 e o k o E \ / � § 3 J7 a co co co co k a z � . . / & @ co co Basin A PROJECT NO. 10- 17-007 The Oaks Subidivions No. 6 Contributing Catchment Areas : A Required Water Quality Volume : 1 ,720 ft' Required Water Quality Flow Rate : 0 .88 cfs Required Storage Volume : 4, 856 ft' Seepage Bed ThE Volume Calculations Storage Duration Depth = 4 ft Length = 203 ft Infiltration Area = 812 ft2 Width = 15 ft Infiltration Rate = 8 in ./hr Void Ratio = 40 % Trench Infiltration = 541 ft3/hr Trench Volume = 41872 ft' Time for 90% Percolation = 2 .86 hr Sand and Grease Trap Calculations Box Volume = 1000 gallon Interior Box Width = 48 in QWo = 0 . 88 ft3/sec Baffle Separation = 20 in Throat Velocity = 0 . 13 ft/sec Number of Boxes = 1 Throat Area = 6 . 67 ft2 Throat Velocity must be < 0 . 50 fUsec F:\Projects\JUB\10-17-007-Oaks No 6\Drainage\Oaks 6 Drainage-Copy.xlsx Page 4 of 7 Basin B PROJECT NO. 10- 17-007 The Oaks Subidivions No. 6 Contributing Catchment Areas : B Required Water Quality Volume : 1 , 236 ft' Required Water Quality Flow Rate : 0 . 60 cfs Required Storage Volume : 39491 ft3 Seepage Bed Volume Calculations Storage Duration Depth = 4 ft Length = 182 ft Infiltration Area = 728 ft2 Width = 12 ft Infiltration Rate = 8 in ./hr Void Ratio = 40 % Trench Infiltration = 485 ft3/hr Trench Volume = 3 ,494 ft' Time for 90% Percolation = 2 . 29 hr Sand and Grease Trap Calculations Box Volume = 1000 gallon Interior Box Width = 48 in QWQ = 0 . 60 ft3/sec Baffle Separation = 20 in Throat Velocity = 0 . 09 ft/sec Number of Boxes = 1 Throat Area = 6 . 67 ft' Throat Velocity must be < 0 . 50 ft/sec F:\Projects\JUB\10-17-007-Oaks No 6\Drainage\Oaks 6 Drainage-Copy.xlsx Page 5 of 7 Channel Report Hydraflow Express Extension for Autodesk®AutoCAD®Civil 3DO by Autodesk,Inc. Thursday,Jan 26 2017 PIPE BASIN Al-A2 Circular Highlighted Diameter(ft) = 1.00 Depth (ft) = 0.38 Q (cfs) = 2.340 Area (sqft) = 0.27 Invert Elev (ft) = 100.00 Velocity (ft/s) = 8.52 Slope (%) = 2.74 Wetted Perim (ft) = 1.33 N-Value = 0.010 Crit Depth, Yc (ft) = 0.66 Top Width (ft) = 0.97 Calculations EGA (ft) = 1.51 Compute by: Known Q Known Q (cfs) = 2.34 Elev (ft) Depth Section 102.00 2.00 I 101.50 1.50 i I 101.00 1.00 100.50 0.50 100.00 0.00 I 99.50 -0.50 0 1 2 3 Reach (ft) �Chalnnel Report Hydraflow Express Extension for Autodesk®AutoCAD®Civil 3D®by Autodesk,Inc. Thursday,Jan 26 2017 PIPE BASIN A2 Circular Highlighted Diameter (ft) = 1.00 Depth (ft) = 0.50 Q (cfs) = 1.610 Area (sqft) = 0.39 Invert Elev (ft) = 100.00 Velocity (ft/s) = 4.08 Slope (%) = 0.50 Wetted Perim (ft) = 1.57 N-Value = 0.010 Crit Depth, Yc (ft) = 0.54 Top Width (ft) = 1.00 Calculations EGL (ft) = 0.76 Compute by: Known Q Known Q (cfs) = 1.61 ( ) Depth Elev ft De Section p ( 102.00 2.00 101.50 1.50 i 101.00 1.00 100.50 0.50 100.00 0.00 99.50 -0.50 0 1 2 3 Reach (ft) Channel Report Hydraflow Express Extension for Autodesk®AutoCAD®Civil 3D®by Autodesk,Inc. Thursday,Jan 26 2017 PIPE BASIN 131-132 Circular Highlighted Diameter (ft) = 1.00 Depth (ft) = 0.31 Q (cfs) = 1.590 Area (sqft) = 0.21 Invert Elev (ft) = 100.00 Velocity (ft/s) = 7.60 Slope (%) = 2.65 Wetted Perim (ft) = 1.18 N-Value = 0.010 Crit Depth, Yc (ft) = 0.54 Top Width (ft) = 0.93 Calculations EGL (ft) = 1.21 Compute by: Known Q Known Q (cfs) = 1.59 Elev (ft) Depth j Section I 102.00 2.00 101.50 1.50 i 101.00 1.00 I c 100.50 0.50 100.00 0.00 99.50 -0.50 0 1 2 3 Reach (ft) Channel Report Hydraflow Express Extension for AutodeskO AutoCADO Civil 3D0 by Autodesk,Inc. Thursday,Jan 26 2017 PIPE BASIN B2 Circular Highlighted Diameter (ft) = 1.00 Depth (ft) = 0.43 Q (cfs) = 1.230 Area (sqft) = 0.33 Invert Elev (ft) = 100.00 Velocity (ft/s) = 3.78 Slope (%) = 0.50 Wetted Perim (ft) = 1.43 N-Value = 0.010 Crit Depth, Yc (ft) = 0.47 Top Width (ft) = 0.99 Calculations EGL (ft) = 0.65 Compute by: Known Q Known Q (cfs) = 1.23 Elev (ft) Depth Section 102.00 2.00 101.50 1.50 101.00 1.00 100.50 0.50 100.00 0.00 j 99.50 -0.50 0 1 2 3 Reach (ft) I i 50 � I ' i I m m 'v tn•c w N Y� z W o : I I N CO co— co m mco IN a D ma p I I I � I I / I I i O O M I w i Z 1 r w m V U) j I / O