Loading...
PZ - Landscape Plan 3 NOTES: - 1. THE STAKING OF TREES IS TO BE THE CONTRACTOR'S OPTION; HOWEVER,THE CONTRACTOR IS RESPONSIBLE TO INSURE THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN REMOVE DEAD/DAMAGED BRANCHES AND PRUNE TO INTERNATIONAL SOCIETY OF ARBORICULTURE STANDARDS; o Landsp Automatic Underground Irrigation Notes. STRAIGHT FOR A MINIMUM OF 1 YEAR. ALL STAKING SHALL BE REMOVED AT THE END OF THE ONE cape Notes. YEAR WARRANTY PERIOD. IMPROPERLY PRUNED TREES (AS DETERMINED BY THE 2. IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS,THE CONTRACTOR IS TO LANDSCAPE ARCHITECT) SHALL BE REMOVED AND REPLACED. - oLM A. CONTRACTOR SHALL REPORT TO LANDSCAPE ARCHITECT ALL CONDITIONS WHICH ROOT BALL, ETC. CONTRACTOR'S OPTION. A. ALL LANDSCAPED AREAS SHALL HAVE AN AUTOMATIC UNDERGROUND SPRINKLER NOTIFY THE LANDSCAPE ARCHITECT BEFORE PROCEEDING. IMPAIR AND/OR PREVENT THE PROPER EXECUTION OF THIS WORK, PRIOR TO I. ALL PLANT MATERIAL SHALL CONFORM TO THE AMERICAN NURSERYMAN SYSTEM WHICH ENSURES COMPLETE COVERAGE AND PROPERLY ZONED FOR BEGINNING WORK. STANDARDS FOR TYPE AND SIZE SHOWN. PLANTS WILL BE REJECTED IF NOT IN A REQUIRED WATER USES. 3. LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO INSTALLATION OF PLANT MATERIAL. E y B. FINISH GRADES TO BE SMOOTH AND EVEN GRADIENTS WITH POSITIVE DRAINAGE IN SOUND AND HEALTHY CONDITION. B. EACH HYDROZONE IS TO BE IRRIGATED WITH SEPARATE INDIVIDUAL STATIONS. PREVAILING WIND DIRECTION ACCORDANCE WITH SITE GRADING PLAN. REMOVE RIDGES AND FILL DEPRESSIONS, J. ALL PLANT MATERIAL SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR C. POP-UP SPRINKLER HEADS SHALL HAVE A MINIMUM RISER HEIGHT OF 6" AT LAWN 4. WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE AS REQUIRED TO MEET FINISH GRADES. P1-INCH BELOW TOP OF ADJACENT BEGINNING AT THE DATE OF SUBSTANTIAL COMPLETION. REPLACE ALL PLANT AREAS. STANDARD OR FIGURE EIGHT TYING METHOD. SECURE THE TIES TO THE STAKES WITH GALVANIZED TREE WRAP TRUNK PROTECTION GALVANIZED NAILS TO PREVENT SLIPPAGE. _3 S PAVEMENT,VALVE BOX,VAULT, ETC. MATERIAL FOUND DEAD OR NOT IN A HEALTHY CONDITION IMMEDIATELY WITH THE D. ELECTRONIC WATER DISTRIBUTION/ TIMING CONTROLLERS ARE TO BE PROVIDED. 5. WATER TREE TWICE WITHIN THE FIRST 24 HOURS. REMOVE AFTER INSTALLATION C. ALL SOD AREAS SHALL HAVE A MINIMUM OF 12" OF TOPSOIL. SPREAD, COMPACT SAME SIZE AND SPECIES AT NO COST TO THE OWNER. MINIMUM CONTROLLER REQUIREMENTS ARE AS FOLLOWS: 6. IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE RUBBER CINCH TIE AND FINE GRADE TOPSOIL TO A SMOOTH AND UNIFORM GRADE. K. TREE PIT BACKFILL PLANTING MIX: BLEND TOPSOIL AND SOIL AMENDMENTS AND D.A. PRECISE INDIVIDUAL STATION TIMING ARCHITECT IMMEDIATELY. I D. RE-USE EXISTING SURFACE TOPSOIL WHERE POSSIBLE. VERIFY SUITABILITY OF FERTILIZER FOR TREE PIT BACKFILL AT THE FOLLOWING RATES. BLEND D.B. RUN TIME CAPABILITIES FOR EXTREMES IN PRECIPITATION RATES 2"x 2"x 8'CEDAR STAKE-DO NOT PENETRATE ROOTBALL. II SURFACE SOIL TO PRODUCE TOPSOIL MEETING REQUIREMENTS AND AMEND WHEN AMENDMENTS THOROUGHLY WITH SOIL BACKFILL. TREE PITS SHALL BE 5'x5'x1.5' D.C. AT LEAST ONE PROGRAM FOR EACH HYDROZONE ROOT PROBE SEE NOTE 1. SET STAKES PARALLEL TO PREVAILING WIND. II I NECESSARY. TOPSOIL SHALL BE A LOOSE, FRIABLE, SANDY LOAM, CLEAN AND (37.5 CF/1.5 CY). D.D. SUFFICIENT MULTIPLE CYCLES TO AVOID WATER RUN-OFF _ FREE OF TOXIC MATERIALS, NOXIOUS WEEDS, WEED SEEDS, ROCKS, GRASS OR K.A. APPLICATION RATES: D.E. POWER FAILURE BACKUP FOR ALL PROGRAMMED INDIVIDUAL VALVED co OTHER FOREIGN MATERIAL AND A PH OF 5.5 TO 7.0. IF ON-SITE TOPSOIL DOES NOT K.A.A. HUMIC ACID: 25 LBS PER TREE PIT WATERING STATIONS WILL BE DESIGNED AND INSTALLED TO PROVIDE I MEET THESE MINIMUM STANDARDS, CONTRACTORS ARE RESPONSIBLE TO EITHER: K.A.B. COMMERCIAL GRADE COMPOST- 10 CUBIC FEET PER TREE PIT WATER TO RESPECTIVE HYDRO-ZONES. SOIL LINE 3"THICK BARK MULCH LAYER, KEEP BARK MULCH A) PROVIDE APPROVED IMPORTED TOPSOIL, OR B.) IMPROVE ON-SITE TOPSOIL K.A.C. PLANTING TABLET FERTILIZER-4 TABLETS PER TREE PIT E. INDIVIDUAL VALVED WATERING STATIONS WILL BE DESIGNED AND INSTALLED TO ,_ 3"AWAY FROM TRUNK WITH METHODS APPROVED BY LANDSCAPE ARCHITECT. SUPPLEMENT WITH K.A.D. CALCIFIED DIATOMACEOUS EARTH-75 LBS PER TREE PIT PROVIDE WATER TO RESPECTIVE HYDRO-ZONES. II IMPORTED TOPSOIL WHEN QUANTITIES ARE INSUFFICIENT. CLEAN TOPSOIL OF L. IMMEDIATELY CLEAN UP ANY TOPSOIL OR OTHER DEBRIS ON THE SITE CREATED F. THE IRRIGATION SYSTEM SHALL BE DESIGNED TO PROVIDE 100% COVERAGE WITH UTILIZE SOIL/ROOT PROBE AROUND TRUNK ROOTS, PLANTS, SODS, STONES, CLAY LUMPS AND OTHER EXTRANEOUS FROM LANDSCAPE OPERATIONS AND DISPOSE OF PROPERLY OFF SITE. HEAD TO HEAD SPACING OR TRIANGULAR SPACING AS APPROPRIATE. BACKFILL WITH SOIL PLANTING MIX. SEE II (APPROX. 3-4"AWAY FROM TRUNK)TO LOCATE 31I SPECIFICATIONS FOR ADDITIONAL INFORMATION. MATERIALS HARMFUL TO PLANT GROWTH. G. SPRINKLER HEADS SHALL BE ADJUSTED TO REDUCE OVERSPRAY ONTO HIGHEST ROOTS. HIGHEST ROOTS SHOULD BE O O E. IF IMPORTED TOPSOIL FROM OFF-SITE SOURCES IS REQUIRED, PROVIDE NEW IMPERVIOUS SURFACES SUCH AS SIDEWALKS, DRIVEWAYS, AND PARKING AREA. POSITIONED AT OR SLIGHTLY ABOVE GRADE LEVEL. I� ■� TOPSOIL THAT IS FERTILE, FRIABLE, NATURAL LOAM, SURFACE SOIL, REASONABLY TURF SOD H. EACH VALVE SHALL BE INSTALLED IN A VALVE BOX LARGE ENOUGH TO ALLOW FOR FINISH GRADE FREE OF SUBSOIL, CLAY LUMPS, BRUSH, WEEDS AND OTHER LITTER, AND FREE OF MAINTENANCE AND REMOVAL. ONLY ONE VALVE PER BOX. REMOVE BURLAP,TWINE,AND WIRE BASKET FROM TOP ROOTS, STUMPS, STONES LARGER THAN 2 INCHES IN ANY DIMENSION, AND OTHER LOLIUM PERENNE ALLAIRELL/ 15/a PERENNIAL RYEGRASS %OF ROOTBALL, REMOVE ALL NAILS,TIES,AND PLASTIC A \ V �� VA COMMERCIAL SLOW RELEASE FERTILIZER TABLETS EXTRANEOUS OR TOXIC MATTER HARMFUL TO PLANT GROWTH. o FROM ROOTBALL. IF SYNTHETIC BURLAP IS UTILIZED TO \�A/AA �� /AA/AAA :U) � II I F. OBTAIN TOPSOIL FROM LOCAL SOURCES OR FROM AREAS HAVING SIMILAR SOIL LOLIUM PERENNE MAHATTAN II/ 15% o WRAP THE ROOTBALL, IT SHALL BE COMPLETELY VA�A� /j\j n a ` CHARACTERISTICS TO THAT FOUND AT PROJECT SITE. OBTAIN TOPSOIL ONLY PERENNIAL RYEGRASS REMOVED. ONLY BIODEGRADEABLE BURLAP SHALL BE VA VAAVAAVAAVAAVAAVA VA V AVAVAA VA z II m LEFT ON THE BOTTOM OF THE ROOTBALL. \VA VA�VA�VA�VA�VA�VA�VA�VAxVA\VA\ �� Cc o FROM NATURALLY, WELL-DRAINED SITES WHERE TOPSOIL OCCURS IN A DEPTH OF PDA PRATENSIS'IMPERIAL BLUE'/ AjAAjAAjAAjAAjAAjAAjAAjAAjAAjAAj CA NOT LESS THAN 4 INCHES. IMPERIAL BLUE KENTUCKY 60% SET ROOTBALL ON NATIVE UNDISTURBED SUBSOIL I — G. ALL LANDSCAPE AREAS SHALL BE WEED FREE AT THE TIME OF LANDSCAPE BLUEGRASS T QINSTALLATION.REMOVE ALL ROOTS, WEEDS, ROCKS AND FOREIGN MATERIAL ON 2x ROOTBALL DIAMETER O I THE SURFACE. Deciduous Tree Planting 3x ROOTBALL DIAMETER i H. NEW TREE PLANTING, SEE DETAIL 1/1-1.00. CONTRACTOR SHALL STAKE ALL TREES DEEMED NECESSARY, LE..... FROM BEING BLOWN OVER, PLANTED WITH LOOSE Scale: NTS w I� C) i No a U) 1 Z a w 1I1I �4 p O 0 0 0 0 0 0 *0 0 0 0 0 0 0 0 0 0 fO I 3 I I 18 8 z co 0 21 20 19 17 16 15 14 1 4 1 III III O O O O � _ O I 5 w GT(2) S ' � 00 000 � 0 � 00 � 00000000 0000 � 2 a I O J I L o W I 1 PATHWAY, EMERGENCY ACCESS& SEWER EASEMENT 5 - - - - - - - - - - - - - - - W. JOSHUASTREET \ _ w I \ Cc !c 120'DRAINAGE EASEMENT LE(3) O Oco \ I CL 11 I i 23 29 O = Cc 5 24 O ■ o UI I 2 I I _ - - � L O Q I ■_ � 1 I O — 5 ILL I; PLANT SCHEDULE 0 i1 TREES BOTANICAL NAME/COMMON NAME CONT CAL \ 20'EASEMENT IN FAVOR O _ O NAMPA-MERIDIAN IRR. DIST. GT GLEDITSIA TRIACANTHOS 'SKYLINE' /SKYLINE HONEY LOCUST B&B 2" �� — 5 2 \ WITH A 10' WIDE MULTI-USE PATHWAYI 1 \ LE LIRIODENDRON TULIPIFERA 'EMERALD CITY TM/EMERALD CITY TULIP TREE B&B 2" / 5 \ I S' EXISTING / \ T N \ IRR. BOX EXISTING 20 FOOT WIDE EAS M Legend: I IN FAVOR OF NAMPA-MERIDIAN \ IF—NO . \ IRRIGATION DISTRICT . = 10-FT WIDE MULTI-USE THE GROUP O NEW TURF SOD. PATHWAY. \ INCORPORATED 462 East Shore Drive, Svate 100 Eagle, Idaho 83616 / I o 0 4' PEN STYLE METAL FENCE, OWNER SELECTION. 39.4041 Fax.208.939.4445 5 Ph. 208.www.thelandgrouPinc.9 com I 6'WHITE VINYL FENCE, OWNER SELECTION. 2 P�EIOF \\ 5� �i Keynotes. � wCALLOUT NUMBERS COORDINATED w I \ p D. ti0 f �JTO NUMBERED NOTES BELOW. A DRI VE \ I I — 1. BEGIN FENCING, SEE LEGEND FOR FENCING TYPE. — 2. END FENCING, SEE LEGEND FOR FENCING TYPE. 3. BERMING CONTOUR LINES, SLOPE AT 1 TO 3. / �� LA-202 4. REMOVE EXISTING TREE, GRIND STUMP TO A MINIMUM OF 6-INCHES BELOW SE OF OFF SITE. 5. 10 SURFACE, T WIDE MULTI-USE SLE PATHWAY, RECYCL DEBRIS AND LED ASPHALT, COORDINATE WITH CIVIL \ �A a FOR SECTION THICKNESS AND BASE COURSE DEPTH. �4/05/2017 \ Project No.: 117049 Date of Issuance: 04.05.17 Designed by: MRT Checked by: PH boa PreliminaryPlat Landscape Plan 40 80Sheet No.: HORIZONTAL SCALE: 1" = 40' Ll 0 0