2022-08-05 Boise Project Board of ControlDAVID RENOLDS
CHAIRMAN OF THE BOARD
DONALD BARKSDALE
VICE CHAIRMAN OF THE BOARD
ROBERT D. CARTER
PROJECT MANAGER
THOMAS RITTHALER
ASSISTANT PROJECT MANAGER
APRYL GARDNER
SECRETARY -TREASURER
MARY SUE CHASE
ASSISTANT SECRETARY -
TREASURER
BOISE PROJECT BOARD OF CONTROL
(FORMERLY BOISE U.S. RECLAMATION PROJECT)
2465 OVERLAND ROAD
BOISE, IDAHO 83705-3155
RECEIVED
AUG 0 u a"
CITY OFC�feqqz5r
CITY CLERKS OFFIC
$2 August 2022
City Clerk's Office
33 E Broadway Avenue
Meridian ID, 83642
OPERATING AGENCY FOR 167,000
ACRES FOR THE FOLLOWING
IRRIGATION DISTRICTS
NAMPA-MERIDIAN DISTRICT
BOISE-KUNA DISTRICT
WILDER DISTRICT
NEW YORK DISTRICT
BIG BEND DISTRICT
RE: Tessara Subdivision/Patrick Connor Preapp-2021-0222
2365 W Victory Rd
New York Irrigation District Ny- 170-001-00, 170-001-01
Calkins Lateral 94+40, 94+50, Rawson 337+00
Sec. 26, T3N, Rl W, BM.
Joseph Dodson:
TEL: (208) 344-1141
FAX: (208) 344-1437
The United States' Calkins Lateral lies in the North East boundary of the mentioned location. location. The easement for this canal is held in the name of the United
States through the Bureau of Reclamation under the authority of the Act of August
30,1890. (26 Stat. 391; 43 U.S.C. 945)
The Boise Project Board of Control is contracted to operate and maintain this lateral. We
assert the federal easement 28 feet south and west and 28 feet north and east of the
lateral's centerline. Whereas this area is for the operation and maintenance of our facility,
no activity should hinder our ability to do so.
It sloes not appear in the plans that this easement has been protected rand Boise Proiect
will not approve plans until it is.
The Boise Project does not approve landscaping including trees and/or shrubs (other than
grass or gravel) within its easements, as this will certainly increase our cost of
maintenance.
All fences/pathtivays must be just off the edge of all Boise Project easements. Easements
must be left a flat drivable surface.
Parking lots, curbing, light poles, signs, etc. and the placing of asphalt and/or cement
over Project facility easements must be approved by Boise Project Board of Control prior
to construction.
Project facilities and/or easements that parallel, and are within and/or intended to be
within road right-of-ways due to any development of this property must be relocated
outside of road right -of --ways. The easements of Boise Project facilities will remain the
same unless agreed upon and/or approved with written permission from Boise Project
Board of Control.
The construction of any roadway crossings must be conducted only during the non -
irrigation season when the canal is dewatered. In any case no work shall take place
within the easement before the proper crossing agreements have been secured through the
Bureau of Reclamation and the Boise Project Board of Control.
Utilities planning to cross any project facility must do so in accordance with the master
policies now held between the Bureau of Reclamation and most of the utilities. In any
case, no work shall take place within the easement before proper crossing agreements
have been secured through both the Bureau of Reclamation and the Boise Project Board
of Control.
Crossing agreements must be secured and signed by all parties prior to March lst of each
year. A time schedule for the construction to be done during the non -irrigation season
must be approved by Boise Project prior to any activity within Project easements. No
construction will be allowed within the easement boundaries of the Boise Project Board
of Control facilities after March 15"' of each year. However, on a case -by -case basis,
overhead utilities and utilities boring underneath a Project facility may be allowed after
March 15'h if reviewed and approved by the Boise Project.
The piping and relocation of any Lateral, Canal and/or Drain must be reviewed and
approved by the Project and is (to include all appurtenant boxes and/or structures) and
must be warranted by the landowner for a period of (5) five -years. The Warrantee
Agreement must be secured prior to ANY disturbance of that facility. A relocation
agreement must also be procured through the Bureau of Reclamation prior to any
construction within the above -mentioned easement.
Boise Project Board of Control must approve any requests and/or relocation of delivery
points prior to construction. RE C E I V Et)
Storm Drainage and/or Street Runoff must be retained on site. AUG Q 5 7022
O DISCHARGE into any live irrigation system is permitted. Y LE KSB D,,,
N
i;ITY CLERKS OFFICE
Per Idaho State Statutes, title 42, local irrigation/drainage ditches that cross this property,
in order to serve neighboring properties, must remain unobstructed and protected by an
appropriate easement. It is the responsibility of the developers, landowners, and
contractors to protect them and allow water to pass to downstream users.
This development is subject to Idaho Code 31-3805, in accordance, this office is
requesting afull-size hard copy of the plans to include drainage and irrigation.
Whereas this property lies within New York Irrigation District it is important that
representatives of this development contact the NYID office as soon as possible to
discuss a pressure system prior to any costly design work. If applicable, the
irrigation system will have to be built to specific specifications as set by the District /
Project.
Boise Project Board of Control must receive a written response from the New York
Irrigation District as to who will own and operate the pressure irrigation system
prior to review and approval of an irrigation plan by Boise Project Board of
Control.
Wording on the preliminary and final recorded plat needs to state that any proposed
and/or future usage of the Boise Project Board of Control facilities are subject to Idaho
Statues, Title 42-1209.
Future preliminary and final plats must call out the Project easements and the plats must
also note, which lots have surface irrigation water rights and which lots do not.
Whereas this development is in its preliminary stages, Boise Project Board of Control
reserves the right to review plans and require changes when our easements and/or
facilities are affected by unknown factors even during the construction phase.
If you have any firrther questions or comments regarding this matter, please do not
hesitate to contact meat (208) 344-1141.
Sin ,
RECEIVED
T mas Ritthaler AUG 0 5 2022
Assistant Project Manager, BPBC CITY 0FCQ04 .
HYI�
or/tr CITY CLERKS OFFICE
f
cc: Clint McCormick Watermaster, Div; 2 BPBC
Terri Hasson Secretary -Treasurer NYID
File
Q
U
O
MO
W
4 J
U
N
�O
N
.O
W
OI N
a �
d c
v
N �
_ U C
E a
O y A
M
O
o
v�
m �
U
N U m
O r �
Q a
o in s a
v
p � E
N
d y�
O O c n
d—
d o
O z
9
O to A
a �
d d
`o
m
78
C
C
GI
L
O
N
L
a
a �
c
o
m
0 a
Q
O N
U Ncu v
O O O) o
N C N
V N
ca
d Q m
d N E
s
O O O `o
m U
CL
aooW
� A N
QCO E
C
C O 7 O v
�77 c
A
A
X C
m
Y Z o
U y j 12
L 2 N
~- +
cu
7 �
N �
c
c
N ai
40 o
me
Q 8
M u n
N yj Q a
M c U 4 d
m 9 d
0
m
b U d ti O m
z
o cd
LL a,