Loading...
PZ - Concept Elevations T/1 ♦ C �1 Z .c N N LU N APPROX. BLDG. HGHT. 23' - 2 17/32" ct TOP PLATE � �= 11' - 1 1/8" ^ CEILING 11 19/32" — — — — — — — — — — - — — PLAN CONFORMS TO OR REQUIRES: PRESCRIPTIVE ❑ CODE (IRC 2012 WALL BRACING) ❑ SPECIAL ENGINEERING ENGINEERING PERFORMED AND INDICATED ON DWG IF SPECIAL ENGINEERING IS REQUIRED, VERIFY ALL ENGINEERING IS INDICATED ON PLANS PRIOR TO CONSTRUCTION ,❑ � MAON LEVEL PRELIMINARY DRAWINGS ff (NOT FOR CONSTRUCTION) n FRONT ELEVATION PRESENTATION 1/2" = 1'-0" CONTRACTOR TO REVIEW DRAWINGS PRIOR TO BIDDING AND CONSTRUCTION.ANY ERRORS AND OMISSIONS SHALL BE BROUGHT TO THE ATTENTION OF THE DRAFTER/DESIGNER FOR CORRECTION. FINAL DRAWINGS CURRENT REVISION: Date 4/6/2022 Drawn by Caloy Saliva Checked by Dustin Hadfield E1 . 2 N 0 CD N N FRONT ELEVATION T/1 ♦ C �1 Z .c N N W N 0 > a a APPROX. BLDG. HGHT. jh_TOP PLT. FINISH FLR 17 UPPER LEVEL _ — _ — — — _ — — — — — _ PLAN CONFORMS TO 10' - 7 7/16" OR REQUIRES: H T r- 1 H PRESCRIPTIVE ❑ CODE (IRC 2012 WALL BRACING) moor— ❑ SPECIAL I ENGINEERING ` ENGINEERING PERFORMED now AND INDICATED ON DWG ` IF SPECIAL ENGINEERING IS REQUIRED, ` VERIFY ALL ENGINEERING IS INDICATED ON PLANS PRIOR TO ,' CONSTRUCTION PRELIMINARY DRAWINGS (NOT FOR CONSTRUCTION) —TF f MAIN LEVEL 0' - 65/16" CONTRACTOR TO REVIEW DRAWINGS PRIOR TO BIDDING AND CONSTRUCTION.ANY ERRORS AND OMISSIONS SHALL BE BROUGHT TO THE ATTENTION OF THE DRAFTER/DESIGNER FOR CORRECTION. FINAL DRAWINGS n FRONT ELEVATION PRESENTATION ' 1/2" = 1'-0" CURRENT REVISION: Date 4/6/2022 Drawn by Caloy Saliva Checked by Dustin Hadfield E1 . 2 Co Co N N FRONT ELEVATION0 T/1 ♦ C �1 Z .c N N APPROX. BLDG. _HGHT. Cl) LU 799 TP LT.1/8" — — — ---- �� w 0 UPPER LEVEL N 11' /8" M CEILING 10' - 1 1/8' — PLAN CONFORMS TO OR REQUIRES: PRESCRIPTIVE ❑ CODE (IRC 2012 WALL BRACING) ❑ SPECIAL ENGINEERING ENGINEERING PERFORMED AND INDICATED ON DWG , , , IF SPECIAL ENGINEERING IS REQUIRED, t 4 t VERIFY ALL ENGINEERING IS INDICATED ON PLANS PRIOR TO CONSTRUCTION PRELIMINARY DRAWINGS (NOT FOR CONSTRUCTION) MAIN LEVEL 0' - 0" CONTRACTOR TO REVIEW DRAWINGS PRIOR TO BIDDING AND CONSTRUCTION.ANY ERRORS AND OMISSIONS SHALL BE BROUGHT TO THE ATTENTION OF THE DRAFTER/DESIGNER FOR CORRECTION. FINAL DRAWINGS n FRONT ELEVATION PRESENTATION ' 1/2" = 1'-0" CURRENT REVISION: Date 04/06/2022 Drawn by Caloy Saliva Checked by Dustin Hadfield 2 E1 . 2 Lo Lo N N N FRONT ELEVATION0