Loading...
PZ - Preliminary Landscape CT C NAI SUTV:" C\ C AT IDAHO SURVEY GROUP \ O O ATE Ilj \ WEED ABATEMENT NOTES: E-o ❑ ° w \ I. ALL AREAS TO BE PLANTED OR HYDROSEEDED SHALL HAVE WEED 165 4 4 - - 4 - - ABATEMENT OPERATIONS PERFORMED ON THEM PRIOR TO IR I IR R + + + + + + \ PLANTING OR HYDR05EEDIN6. IR IR + + IR+ + 2. GONTRAGTOR SHALL SPRAY ALL EXPOSED WEEDS �oo SCA��oo° w + + + + + + + + + WITH GROUND-UPo (CONTACT HERBICIDE) OR APPROVED EQUAL. �0000� o + + + ++ + + 5 \ 3. DO NOT WATER FOR AT LEAST SEVEN 0) DAYS. REMOVE 4 + � + 1 + + + I \ \ EXPOSED WEEDS FROM THE SITE. ° BLOCK 1 + + +�±_ + \ 4. CONTRACTOR SHALL OPERATE THE AUTOMATIC IRRIGATION SYSTEM FOR A PERIOD OF FOURTEEN (14) DAYS. AT CONGLU51ON OF THIS o M M TA + + + + + + + +\ WATERING PERIOD, 015GONTINUE WATERING FOR THREE TO FIVE 0 \ (3-5) DAYS. D v .e N u, co 5. APPLY SECOND APPLICATION OF GROUND-UPo TO ALL EXPOSED � fD o + + + +/ yT \ WEEDS. APPLY IN STRICT CONFORMANCE WITH MANUFACTURER'S mL M _ . w CJ + LEE 5PEGIFIGATIONS AND INSTRUCTIONS. DO NOT WATER FOR AT a M 0 w �� LEAST SEVEN (7) DAYS. REMOVE WEEDS FROM THE SITE. Q C6 0 o E - C p u_ a 1 2 3 rE + 3 `��� \ \ 6. IF ANY EVIDENCE OF WEED GERMINATION EXISTS AFTER TWO (2) E o `-' ,°- a ao N o v o W 0 .- L r0 J7 O Z C + + APPLICATIONS, CONTRACTOR SHALL BE DIRECTED TO PERFORM A .� o .m 3 N o Ez THIRD APPLICATION. J W CD s -1 0 W � 4P+ ° "y� \ \ .2 0- co Cs N \ 7. AT THE TIME OF PLANTING AND HYDROSEEDIN6, ALL PLANTING 0 + + AREAS SHALL BE WEED FREE. • _ ■ • Z )t710 ° L + + 4 5 � + + + IN. + + + + + IbA I + f + + + + + \ �� o + / +J + + + ' , x jR C - - W - w - / 3 + + + + + +1 + x z / TA I+ + + + T + + + + + D + + + 1 + + + + + x z + + + + + + + + o \x\x\ STATEN PARK ° K w w w w w w w w w w w w w w w w + + + + + + + + + + + 0 �-, I _T + + + :� +� + + �° x\x SUBDIVISION W. SHIRDALE CT. _ / + + + J+ + + + + + + \x + + + + + \ \ �� 10 / + + + + + + + + + + + + 5 SS g„SS 8„SS 8„SS 8„SS 8„SS 8„S 8"SS SS � � r � � / 7 �o x\x Copyright�C 2017 \ All rights reserved. Reproduction or use in any form 0 ' /'') x or by any means without written permission of 2 2 ♦ - - 5 \ \ \\ �, \,`.\ Breckon Land Design,Inc.is unlawful and subject to 0 J , +� / M - M criminal prosecution. w w �+ a ♦ _ hop bp Y + + + Za 5 Z + + o Q o H + + IR ' '�'° z + x� + +1 + a 13 12 11 10 8 \ 10 + + 1 w 10 11� + + I� ` + + � 0 6 5 '�� v + + y o� � z w I Q Z 4 + + + z BLOCK 1 + + 1 w 10 + NNI C� +i ' > U + � JI JI JI ?JI JI ?JI ZII �I JI Q w r n - G - c JI G ?JI JI ?JI III di III al - - ?JI JI z >_ V/ V W ASHFORD GREENS SUBDIVISION 6 - -x�x Q THE LAKE AT CHERRY LANE NO.9 SUBDIVISION Q z N coo zQ F 0 _OCK 9 £ BLOCK 11 BLOCK 29 0 CD 5 N W W O w J > p � w � I � N � Q I o I w � z E co v, z © I _ I I w n T PRELIMINARY LANDSCAPE PLAN v N 20 0 20 40 60 SCALE: III= 20'-0" PLANT SCHEDULE LANDSCAPE LEGEND QTY. KEY BOTANICAL NAME COMMON NAME SIZE NOTES CLASS CIOLANDSCAPE NOTES: DECIDUOUS SHADE TREES = oo go:z oW ° PLANTS TO BE INSTALLED, " "z 0 + 4 TA TiIio omeriIi 'Redmond' Redmond Linden 2" GAL. BBB 35'Hx25'W ` T yWc O7 1. GONTRAGTOR SHALL REPORT TO LANDSCAPE ARGHITEGT ALL CONDITIONS WHIGH IMPAIR AND/OR PREVENT THE PROPER EXEGUTION OF THIS WORK, PRIOR TO BEGINNING WORK. •• SEE DETAIL 2 ff 3/PPI.O \\ z w 0. >. 2. NO MATERIAL SUBSTITUTIONS SHALL BE MADE WITHOUT THE LANDSCAPE ARCHITECT'S PRIOR WRITTEN APPROVAL. ALTERNATE MATERIALS OF SIMILAR SIZE AND CHARACTER MAY BE CONSIDERED IF SPEGIFIED PLANT MATERIALS CAN NOT BE OBTAINED. �� _ Loa d'W W 3. COORDINATE ALL WORK WITH ALL OTHER SITE RELATED DEVELOPMENT DRAWINGS. C� a G a E z E 4. COORDINATE WORK SCHEDULE AND OBSERVATIONS WITH LANDSCAPE ARGHITEGT PRIOR TO CONSTRUCTION START-UP. -x x x x x- EXISTING VINYL FENCE LANDSCAPE REQUIREMENTS CALLOUT LEGEND az>.w 2 C 5. ALL PLANT MATERIAL SHALL BE INSTALLED AS PER DETAILS. 6. ALL PLANT MATERIAL SHALL CONFORM TO THE AMERICAN NURSERYMAN STANDARDS FOR TYPE AND SIZE SHOWN. PLANTS WILL BE REJECTED IF NOT IN A SOUND AND HEALTHY CONDITION. PROPOSED VINYL FENCE COMMON OPEN SPACE/SITE INFORMATION 060MMON LOT. CC) 7. IN THE EVENT OF A PLANT COUNT DISCREPANCY, PLANT SYMBOLS SHALL OVERRIDE 5GHEDULE QUANTITIES AND GALL OUT SYMBOL NUMBERS. REVISIONS Q 0 8. ALL PLANTING BEDS SHALL BE COVERED WITH A MINIMUM OF 3" DEPTH OF BARK MULCH. SUBMIT SAMPLE FOR APPROVAL. TOTAL AREA OF SITE: 80,172 SF (1.84 AG) No. Date Description q. ALL PLANT MATERIAL SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR BEGINNING AT THE DATE OF AGGEPTANGE BY THE OWNER. REPLACE ALL PLANT MATERIAL FOUND DEAD OR NOT IN A HEALTHY CONDITION WROUGHT IRON FENCE OPEN SPACE REQUIRED: 10% = 8,017 SF (O.IS AG) 0 40' VISION TRIANGLE. L_ IMMEDIATELY WITH THE SAME SIZE AND SPECIES AT NO G05T TO THE OWNER. - - PROPERTY LINE (VERIFY) TOTAL OPEN SPACE PROVIDED: = 6,010 SF - 7.5% (0.14 AG) 0 10. FINISH GRADES SHALL PROVIDE A SMOOTH TRANSITION WITH ADJAGENT SURFAGES AND ENSURE POSITIVE DRAINAGE IN ACCORDANCE WITH THE SITE GRADING PLAN. QUALIFIED OPEN SPACE: = (9,010 SF - 7.516 (0.14 AG) 11. AMEND EXISTING APPROVED TOPSOIL AT A RATIO OF THREE GUBIG YARDS OF APPROVED COMPOST PER 1000 SQUARE FEET. ROTO-TILL ORGANIC MATTER A MINIMUM OF 6 INCHES INTO TOPSOIL. _ _ _ _ _ _ _ _ _ _ GUT EDGE SEE DETAIL I TREE PER 8000 SF REQUIRED: I TREE O PEDESTRIAN ACCESS GATE. 12. FERTILIZE ALL TREES AND SHRUBS WITH 'AGRIFORM' PLANTING TABLETS. QUANTITY PER MANUFACTURER'S RECOMMENDATIONS. I/PPI.5 PROVIDED:I TREE 13. ALL PLANTING BEDS SHALL HAVE A MINIMUM 18" DEPTH OF TOPSOIL. LAWN AREAS SHALL HAVE A MINIMUM 12" DEPTH OF TOPSOIL. SPREAD, COMPACT, AND FINE GRADE TOPSOIL TO A SMOOTH AND UNIFORM GRADE PROJECT NO.: 3" BELOW ADJAGENT SURFAGES OF PLANTER BED AREAS, 1-1/2" BELOW ADJAGENT SURFAGES OF TURF SOD AREAS, AND I" BELOW ADJAGENT SURFACES OF TURF SEED AREAS. r QUANTITY 10 BUILDING LOTS, 2 GOMMON LOTS PROPOSED VINYL FENCE - COLOR AND Q 14. REUSE EXISTING TOPSOIL STOCKPILED ON THE 51TE. SUPPLEMENT WITH IMPORTED TOPSOIL WHEN QUANTITIES ARE INSUFFICIENT. VERIFY SUITABILITY AND CONDITION OF TOPSOIL AS A GROWING MEDIUM. PERFORM PLANT IDENTIFICATION KEY 6RO55 DENSITY: = 4.6 DU/ACRE O HEIGHT TO BE DETERMINED BY OWNER. 17034 Q B v SOIL TEST/ ANALYSIS AND PROVIDE ADDITIONAL AMENDMENT AS DETERMINED BY SOIL TESTS. TOPSOIL SHALL BE A LOOSE, FRIABLE, SANDY LOAM, GLEAN AND FREE OF TOXIC, MATERIALS, NOXIOUS WEEDS, WEED NET DENSITY: = 7.4 DU/ACRE FENCE SHOWN I' OFF OF PROPERTY LINE DRAWN BY: SEEDS, ROCKS, GRASS OR OTHER FOREIGN MATERIAL AND A HAVE A PH OF 5.5 TO 7.0. IF ON51TE TOPSOIL DOES NOT MEET THESE MINIMUM STANDARDS, CONTRACTOR IS RESPONSIBLE TO EITHER: + + + + MIN. LOT SIZE: = 4,034 SF, AVG. LOT SIZE: = 4g5q SF FOR GRAPHIC CLARITY. A) PROVIDE APPROVED IMPORTED TOPSOIL, OR + + + + + TURF SOD OVER APPROVED TOPSOIL EXISTING ZONING: RUT COUNTY, PROPOSED ZONING: R-4 MSD co B) IMPROVE ON-SITE TOPSOIL WITH METHODS APPROVED BY THE LANDSCAPE ARGHITEGT. + + + + PROPOSED WROUGHT IRON FENCE - CHECKED BY: + + + + + AS SPECIFIED. @COLOR AND HEIGHT TO BE DETERMINED -0I5. IF IMPORTED TOPSOIL FROM OFF-SITE SOURCES IS REQUIRED, ENSURE IT IS FERTILE, FRIABLE, NATURAL LOAM, SURFACE SOIL, REASONABLY FREE OF SUBSOIL, CLAY LUMPS, BRUSH, WEEDS AND OTHER LITTER, AND + + + + MSD _ 0 FREE OF ROOTS, STUMPS, STONES LARGER THAN 2 INCHES IN ANY DIMENSION, AND OTHER EXTRANEOUS OR TOXIC MATTER HARMFUL TO PLANT GROWTH. BY OWNER. FENCE SHOWN I' OFF OF (D A) OBTAIN TOPSOIL FROM LOCAL SOURCES OR FROM AREAS HAVING SIMILAR SOIL CHARACTERISTICS TO THOSE FOUND ON THE PROJECT SITE. OBTAIN TOPSOIL ONLY FROM NATURALLY, WELL-DRAINED SITES PROPERTY LINE FOR GRAPHIC CLARITY. DATE: J d WHERE TOPSOIL OCCURS AT A DEPTH OF NOT LESS THAN 4 INCHES. BARK MULCH AND APPROVED O 4/12/17 0 B) REPRESENTATIVE SAMPLES SHALL BE TESTED FOR ACIDITY, FERTILITY, TOXICITY, AND GENERAL TEXTURE BY A RECOGNIZED COMMERCIAL OR GOVERNMENT AGENCY AND GOPIE5 OF THE TESTING AGENCY'S TOPSOIL AS SPEGIFIED. EXISTING VINYL FENCING TO REMAIN. LLI FINDINGS AND RECOMMENDATIONS SHALL BE FURNISHED TO THE OWNER'S REPRESENTATIVE BY THE CONTRACTOR. NO TOPSOIL SHALL BE DELIVERED IN A FROZEN OR MUDDY CONDITION. ACIDITY/ALKALINITY RANGE - PH. 5.5 TO 7.6. SHEET NUMBER ^^ 0 16. IMMEDIATELY GLEAN UP ANY TOPSOIL OR OTHER DEBRIS ON THE SITE CREATED FROM LANDSCAPE OPERATIONS AND DISPOSE OF PROPERLY OFF SITE. L.L A � 17. TREES SHALL NOT BE PLANTED WITHIN THE 10'-0" CLEAR ZONE OF ALL STORM DRAIN PIPE, 5TRUGTURE5, OR FACILITIES. 18. SEEPAGE BEDS AND OTHER STORM DRAINAGE FACILITIES MUST BE PROTECTED FROM ANY AND ALL CONTAMINATION DURING THE GON5TRUGTION AND INSTALLATION OF THE LAN05GAPE IRRIGATION SYSTEM. D P1.0 o, Iq. IN THE EVENT OF A DISCREPANCY, NOTIFY THE LANDSCAPE ARGHITEGT IMMEDIATELY. I I I 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16