CC - Drainage Calcs PROJECT NO . 10 = 17 =014 DRAINAGE CALCULATIONS FOR Fall Creek No . 4 City of Meridian Ada County , Idaho March 20 , 2017 106 OF CimumB 10U0B ENGINEERS , INC . 250 S . Beechwood Drive , #201 Boise , Idaho 83709 208 =376 - 7330 PROJECT NO. 10-17-014 Fall Creek No.4 SITE OVERVIEW The Fall Creek Subdivision No.4 is located south of W.Overland Road between S.Stoddard Road and S. Linder Road in the Fall Creek Subdivision Meridian, Idaho.The proposed development consists of 46 single family residential lots located on approximately 18.2 acres. EXISTING DRAINAGE The existing project site presently consists of a vacant agricultural field. The site is bounded by developed single family residential properties to the south, east and west,and agricultural land to the north.The ground slopes gently from southeast to northwest at grades generally less than 2%. DRAINAGE DESIGN CONCEPT The proposed stormwater improvements include the installation of roadways, pipe networks, stormwater treatment systems,and storage facilities.The surface flow will be directed to and contained within the road sections to designed low points where inlets will capture the stormwater and convey it through a pipe network to a discharge location. A treatment system will be installed for each pipe network prior to allowing the stormwater to be be discharged to the storage facility. The site was divided into catchment areas based on the inlet locations. Each catchement area was analyzed for the 25-year flow rate for conveyance,the water quality event for treatment and the 100-year runoff for storage. Pre-development discharge has been piped to discharge to the Hardin Drain.The required onsite storage was adjusted to allow for the pre-development discharge. The full volume of Basin D and the excess volume of Basin B minus the water quality volume is being discharged as pre- development. CALCULATION METHODS Calcualtions were prepared in accordance with the current edition of the Ada County Highway District Stormwater Policy Manual using the rational method (Q=CIA).The catchment areas are shown on the Drainage Catchment Plan. The average rainfall intensity is estimated from the "Rainfall Intensity-Duration-Frequency Relationship"figure for each storm event noted. The time of concentration is determined using the TR-55 method and combines the longest overland grass flow time to gutter flow time. Calculations and spreadsheets are included with this report for all catchment areas. SOIL CONDITIONS Based upon the preliminary soils and subsurface investigation provided in the soils report for this subdivision,the existing soils will accept the runoff. However, in the event that during construction the contractor encounters either groundwater or rock,a revised design will be done based upon field conditions. \\boisefiles\public\Projects\JUB\1 0-1 7-014-Fall Creek No 4\Drainage\10_17_014_DrainageCalcs.xlsx as c Q Z aT+ O N � LO 00 (0 M o m fC w M 1° P7 n a m U) (j = NC; N Z N LL F- LL L w O W N O m co 1� r� O f� r 0) r� O d) co N N 0) O j 3 N N d' I� V (0 r N 0) LO O O r r O r r r (0 U O O O O O r O O O O O O O O O O O O a) Q 0 V N O M 0 W co N O N N co F N M 0 N Y E Q v 0 E O o S C N o 0 C E .0 W (0 N N I� N O T � V V EoE c�a O M (5 � O cr) v NN M rn O (p O L N U 0 0 O .-- O O O O O O O o Q E a) j O O O C O Ln ++ 7 7 a) N Q H m cr N ¢ oo 'm o d OC N w C Q (U C O p O n N a) CO ++ () O o in ¢ co 00 N Cl) h O I� Q) m r� � O Q(� O N p N Nq�f Ln n N co O O N75 V II to II II ¢p ¢� N c) 06 66 66 O O O O O U 7 > U .° .m . N C7 U co LO CO N co) N Q N N n O N N W n O O r O (0 N W P M Q1 r N C`') W r W M m W t` Q U r N r N V O r N O co O O O r O O N L O N d' W N 00 (3) r� O N Cn LO Re N (0 00 LO LO W U t` P7 r (h h r I� co (li .- N V LO V a (D (D m O r N (M o O r O O O O O O O CDC � T O N N V O W 00 O N N r V r` 00 co O (O 0 0 O LL l0 U_ C Q a] CO r LO O f` co LD N N '7 LO LO O r n (Q O N N CO CD r O CD O CDr O O W m .� OCj W V co (0 W W a7 co W W W I` LL Ln N 7 CM LO LO LO LO LO Ln LO C) Y 0 'tq - C C N N N N N N N N N N N Q ro O (1) N O U U a- OC f LO O m m Ln Ln Ln Ln ip Ln M m Ln ip m II II II II N = CO CD r (c (° CO 00 CO CO W W rn C O O O O O O p O 0 U it ¢ — T ~ � I- T ~ ~ M I Ln V C7) O 0)W (D O (D (0 (. _ _ cr) O O O 0 0O O O O O O O O O 0 LOLO Ln Ln LO W LO LO LO Ln O 0 0 O O O O 66 O O O C x N O N U 0 0 m 3 ° ° _O J co rn N C (0 W O m N (fl N C') O N LO n V N n LO (0 O O Cn (7 O `� LL v co (o h (fl L6 Li v Lo L6 o of O 0 S 7 L N O (.0 W M (c) � O co O rl ++ o) J 0) LO CV) r C` V r� LO CO (D r' O ) o7 r� o r LO � cO co a T m II U) w 0F 0 0 0 0 0 0 o c qj 0 00 0o O O o 0 0 0 00 0 0 0 0 0 0 0 0 0 0 'a F. W O C K* V V V d' d `i' V V a y O O E Lri Lri Lri Lri ri ri ri ri Lri Lri Lri m U a7 N N N N N N N N N N CDLi L 0) t6 O O 0 o O CD O (DO ClO v C 3 m 3 c o w 0 0 0 0 0 0 0 Cl 0 0 0 0 ° o O O O o o t0 N c') U J 0 C D '° �,,, 0 0 0 o LO Ln LO LO 0 0 CDN LL .C: (/� 0 co L N J ' LO LO LO LO N N N N LO LO l0 (7 ° 3 O C No cl j a `m m V V @ 00 •a 0 N > 3 (� O Q. m O T 0) N `O U U L N O E o 0 0 0 0 0 0 0 0 0 0 O O O o rim 'v n n n n n n n n n n o d 0 N N O d 0 LL Q. (Q E O J O Q N '- ` D 11 OFM cn II ¢ co co co co co co co co co co co t M 0) O) m 0) 0) (A D) 0) 0) 0) m O O CD O O O O O O O O m 7 � v N O o ° LL > a m m m U U o W W i Q a Basin A PROJECT NO. 10- 17-014 Fall Creek No, 4 Contributing Catchment Areas : A Required Water Quality Volume : 1 ,534 ft3 Required Water Quality Flow Rate : 0.70 cfs Required Storage Volume : 3 ,767 ft3 Seepage Bed Volume Calculations Storage Duration Depth = 8 ft Length = 118 ft Infiltration Area = 11180 ft Width = 10 ft Infiltration Rate = 0 . 93 in ./hr Void Ratio = 40 % Trench Infiltration = 91 ft3/hr Trench Volume = 3 ,776 ft3 Time for 90% Percolation = 15. 10 hr Sand and Grease Trap Calculations Box Volume = 1000 gallon Interior Box Width = 48 in QWQ = 0 . 70 ft3/sec Baffle Separation = 20 in Throat Velocity = 0. 1 ft/sec Number of Boxes = 1 Throat Area = 6 . 67 ftz Throat Velocity must be < 0 . 50 ft/sec \\boisefiles\public\Projects\JUB\10. 17-014- Fall Creek No 4\Drainage\10_17_014_DrainageCalcs .xlsx Page 4 of 10 Basin B PROJECT NO. 10-17-014 Fall Creek No, 4 Contributing Catchment Areas : B Required Water Quality Volume : 21548 ft3 Required Water Quality Flow Rate: 1 . 17 cfs Pre-Development discharge Volume 3,708 ft3 Required Storage Volume : 2,547 ft3 Pre-development discharge volume to be discharged to the Hardin Drain . Seepage Bed Volume Calculations Storage Duration Depth = 8 ft Length = 68 ft Infiltration Area = 816 ft Width = 12 ft Infiltration Rate = 0 . 93 in ./hr Void Ratio = 40 % Trench Infiltration = 63 ft3/hr Trench Volume = 21611 ft3 Time for 90% Percolation = 36. 26 hr Sand and Grease Trap Calculations Box Volume = 1000 gallon Interior Box Width = 48 in QWa = 1 . 17 ft3/sec Baffle Separation = 20 in Throat Velocity = 0. 17 ft/sec Number of Boxes = 1 Throat Area = 6 . 67 ft' Throat Velocity must be < 0 . 50 ft/sec \\boisefiles\public\Projects\JUB\1 0-1 7-014-Fall Creek No 4\Drainage\10_17_014_DrainageCalcs.xlsx Page 5 of 10 Basin C PROJECT NO. 10-17-014 Fali Creek No. 4 Contributing Catchment Areas : C Required Water Quality Volume : 1 , 154 ft' Required Water Quality Flow Rate : 0.57 cfs Required Storage Volume : 2,834 ft' Seepage Bed Volume Calculations Storage Duration Depth = 8 ft Length = 89 ft Infiltration Area = 890 ft Width = 10 ft Infiltration Rate = 0 . 93 in ./hr Void Ratio = 40 % Trench Infiltration = 69 ft3/hr Trench Volume = 21848 ft3 Time for 90% Percolation = 15.06 hr Sand and Grease Trap Calculations Box Volume = 1000 gallon Interior Box Width = 48 in QWa = 0 . 57 ft3/sec Baffle Separation = 20 in Throat Velocity = 0.08 ft/sec Number of Boxes = 1 Throat Area = 6 . 67 ftz Throat Velocity must be < 0 . 50 ft/sec \\boisefiles\public\Projects\JUB\1 0-1 7-014-Fall Creek No 4\Drainage\10_17_014_DrainageCa1cs.x1sx Page 6 of 10 Basin D PROJECT NO. 10-17-014 Fall Creek No. 4 Contributing Catchment Areas : D Required Water Quality Volume : 338 ft3 Required Water Quality Flow Rate: 0. 57 cfs Pre-Development discharge Volume 829 ft3 Required Storage Volume : 0 ft3 Pre-development discharge volume to be discharged to the Hardin Drain . Sand and Grease Trap Calculations Box Volume = 1000 gallon Interior Box Width = 48 in QWa = 0 . 57 ft3/sec Baffle Separation = 20 in Throat Velocity = 0.08 ft/sec Number of Boxes = 1 Throat Area = 6 .67 fe Throat Velocity must be < 0 . 50 ft/sec \\boisefiles\public\Projects\JUB\10-17-014-Fall Creek No 4\Drainage\10_17_014_DrainageCalcs.xlsx Page 7 of 10 Basin E PROJECT NO. 10- 17-014 Fall Creek No. 4 Contributing Catchment Areas : E Required Water Quality Volume: 746 ft3 Required Water Quality Flow Rate : 0. 18 cfs Required Storage Volume : 19832 ft3 Seepage Bed Volume Calculations Storage Duration Depth = 8 ft Length = 48 ft Infiltration Area = 576 ft2 Width = 12 ft Infiltration Rate = 0 . 93 in ./hr Void Ratio = 40 % Trench Infiltration = 45 ft3/hr Trench Volume = 19843 ft3 Time for 90% Percolation = 15 .04 hr Sand and Grease Trap Calculations Box Volume = 1000 gallon Interior Box Width = 48 in QWo = 0 . 18 ft3/sec Baffle Separation = 20 in Throat Velocity = 0.03 ft/sec Number of Boxes = 1 Throat Area = 6 . 67 ft' Throat Velocity must be < 0 . 50 ft/sec \\boisefiles\public\Projects\1UB\10- 17-014-Fall Creek No 4\Drainage\10_17_014_DrainageCalcs.xlsx Page 8 of 10 Basin F PROJECT NO. 10-17-014 Fall Creek No. 4 Contributing Catchment Areas : F Required Water Quality Volume : 493 ft3 Required Water Quality Flow Rate : 0. 12 cfs Required Storage Volume : 1 , 210 ft3 Seepage Bed ThE Volume Calculations Storage Duration Depth = 8 ft Length = 30 ft Infiltration Area = 360 ftz Width = 12 ft Infiltration Rate = 0 . 93 in ./hr ## Void Ratio = 40 % Trench Infiltration = 28 ft3/hr Trench Volume = 11152 ft3 Time for 90% Percolation = 15.89 hr Sand and Grease Trap Calculations Box Volume = 1000 gallon Interior Box Width = 48 in Qwo = 0 . 12 ft3/sec Baffle Separation = 20 in Throat Velocity = 0.02 ft/sec Number of Boxes = 1 Throat Area = 6 . 67 ft2 Throat Velocity must be < 0 . 50 ft/sec \\boisefiles\public\Projects\JUB\10-17-014-Fall Creek No 4\Drainage\10_17_014_DrainageCalcs.xlsx Page 9 of 10 Boise Area Intensity- Duration- Frequency Intensity ( inches per hour) Design Storm 2 5 10 25 50 100 Tc 0 . 17 10 min 0 . 69 1 . 15 1 . 45 1 . 85 2020 2 . 58 0 . 25 15 min 0 . 59 0 . 97 1 . 22 1 . 56 1986 2 . 18 0 . 33 20 min 0 .49 0 . 81 1 . 01 1 . 30 1954 1 . 81 0 . 42 25 min 0 . 43 0 . 71 0 . 89 1 . 14 1 . 35 1 . 58 0 . 50 30 min 0 . 41 0 . 67 0 . 85 1 . 08 1 . 29 1 . 51 0 . 58 35 min 0 . 34 0 . 56 0 . 70 0 . 90 1907 1 . 25 0 . 67 40 min 0 . 31 0 . 51 0 . 64 0 . 82 0 . 98 1 . 15 0 . 75 45 min 0 . 29 0 . 48 0 . 60 0 . 77 0 . 91 1 . 07 0 . 83 50 min 0 . 27 0 . 45 0 . 56 0 . 72 0 . 85 1 . 00 0 . 92 55 min 0 . 26 0 . 43 0 . 54 0 . 69 0 . 82 0 . 96 1 . 00 1 hour 0 . 26 0 . 43 0 . 54 0 . 69 0 . 82 0 . 96 2 . 00 2 hours 0 . 16 0 . 25 0 . 31 0 . 39 0 . 46 0 . 54 3 . 00 3 hours 0 . 13 0 . 19 0 . 23 0 . 29 0 . 34 0 . 40 6 . 00 6 hours 0 . 09 0 . 12 0 . 14 0 . 18 0 . 21 0 . 25 12 . 00 12 hours 0 . 06 0 . 08 0 . 10 0 . 12 0 . 14 0 . 16 24 . 00 24 hours 0 . 04 0 . 06 0 . 06 0 . 08 0 . 09 0 . 10 NOAA Atlas 2 Intensity Duration Frequency 3 . 5 -- - -- -- 2 year 3 - -x- 5 year 2 . 5 -x- 10 year t N 2 xA 25 year V \ - 1 50 year 1 . 5 * - - ?4 \ � 100 year C MENNEN 0 . 5 I Ads WIN 10 min 15 min 30 min 1 hour 2 hours 3 hours 6 hours 12 hours 24 hours Duration in minutes and hours I, , I I I I � -lu I BASIN Al \ 0.80 ACRES NN 41 � � I 1 I i I , s I W /II a0 60 120 SCALE IN FEET \ \\ \ I i C N FALL CREEK SUBDIVISION NO. 4 l— Meridian, Idaho DRAINAGE CATCHMENT PLAN a o 1-U-8 ENGINEERS,INC.