Loading...
CC - Landscape Plan 1 ' 2 3 4 ' 5 ' 6 7 8 ' 9 10 mLn I Oq LU LANPSGAPE NOTES: N O1 I � STACK ROC K " O BLOCK 1 I G R O U P 1. REOULATION5 $ 5TANDARD5 not meeting these standards for quality, or plants determined to be ro STACK ROCK GROUP, INC. 1.1 . All contractor work Shall be conducted in accordance with I5PWC (Idaho unhealthy by Owner's representative, will be rejected.. I I r- L A N D 5 C A P E Standard Public Works Gon5truction), 201 '7; and City of Meridian, ID 6.3. All trees to be installed per detail 1 /L 1 .0 1. I 0 ARCHITECTURE/ MASTER codes, Standards and State and local regulations. 6.4. All shrubs to be installed per detail 2/L 1.0 1. 7 I o P L A N N I N 6 2. EXI5TIN6 CONDITION5 6.5. Trees and Shrubs over 36" Shall not be planted within clear vision _U `f' 2.1 . All utilities Shall be located prior to construction and protected. Any triangles per city code. B LAC KSTO N E SUBDIVISION W IC E G H OwARD, PLA damage to structures, utilities or concrete will be replaced at 6.6. Fertilize all trees and Shrubs with 'Agriform' planting tablets or approved OFFFICE:: (205) 345.0500 EMAIL: contractor'sLOT 4 expense. equal. Apply per manufacturers recommendations. I I , BLOCK 1 WILL@STAGKROGKGROUP.GOM 2.2. The Site has many existing improvements 5uch as underground utilities, 7. IRRIGATION www.5TAGKR0GKGR0UP.G0M curb and gutter, light poles and Sidewalks. 7. 1 . Irrigation System Shall be design build and built to the following 17 �\ I I THE 6 R A P H I C S AN 2.3. See Engineer's plans for information about existing features; all drainage 5pecification5: DE516N5 ON THIS 5HEE pipes and locations. Protect and retain drainage at all times. 7. 1 . 1. Adhere to city code5 when connecting to city water. I ARE DELIVERABLE5 THA 3. GRADING a SITE PREPARATION -7.1 .2. All irrigation material to be new with manufacturers' warranty fully \ REMAIN AT ALL TIME 3.1 . Prepare finish grades for planting by grubbing and removing weeds. If intact. FA I PROPERTY OF STAG K G necessary apply Round-Up (or equivalent herbicide), using a certified -7. 1 .3. Install outdoor rated controller to be located as indicated on plan; ROCK 6 R O U P , I N C applicator. Remove rock5 and other materials over 2". coordinate with project manager and Site electrician on exact S I 3.2. All gravel overprep to be removed and disposed Of off Site. location. 5 s" d REPRODUCTION OR REDS 3.3. Finish grade to be Smooth transition to allow for entire Site to be a 7. 1 .3. 1. Controller to have On/Off rain Switch or rain Shut off device W69' d3 \ OF T H 1 5 P R O D U G CONTAINED HERE IN 1 natural flowing Space. that does not alter program. Install in Steel lock box with (2) p,�� PROHIBITED WITHOUT TH 3.4. Fine grade lawn areas tdrainage away from 5truocture5 elevations Set by Engineer's plans with positive 7 1 .4. All remote control valves (including master control valve) to have m S 4055,o5E 1 DRIVEWAY 3.4. 1 . Refer to Engineer'5 plane for grading information s for all drainage STAIGK ROGiO6R0 P, I NSENT O flow control device. 10.90, pipes and locations. Protect and retain drainage at all times. -7.1 .5. Irrigation System piping to be minimum c1a55 200 PVC or approved ©20 1 '7 STACK 3.5. No pooling or standing water will be accepted per industry standards. equal, Sleeves to be double the Size of pipes located within, all wires ROCK GROUP, IN G. 4. BOILS to be contained in separate sleeves 1 - 1 /2" dia min. 4.1 . All planter beds to receive a minimum of 1 5" depth of Screened topsoil. 7.1 .6. Use common trenching where possible.. SSS Spread, compact, and fine grade to Smooth and uniform grade 2" below 7.1 .7. All PVC located under hard5cape5 to be Schedule 40 PVC with Same 1S, adjacent Surfaces. req'5 as above. 4.2. All lawn areas to receive a minimum of 1 2" depth of 5creened topsoil. 7.1 .5. All mainline pipe and wires to be buried a minimum of 1 5" and all lateral Spread, compact, and fine grade topsoil to a smooth uniform grade 1" piping to be buried a minimum of 1 2" below grade. SQo \ fig, s•d• PRELIMINARY: F below adjacent Surfaces. 7.1 .q. All wires to be 1 4 gauge direct bury wire at a minimum. Size wire for S6, \ NOT FOR CONSTRUCTION 4.3. Reuse of existing topsoil that has been stockpiled on Site is permitted correct voltage loss. m e9�F \ `�.•``��,,14110F jl,,00''4,� if: 7.1 . 1 0. Supply a minimum of (2) Spare wires to furthe5t valves from 4.3. 1 . Topsoil is tested and analyzed to ensure a proper growing medium. controller in all directions. 1l. d� O Provide additional amendments as determined by Soil tests. And 7.1 . 1 1 . Sprinkler heads Shall have amatched precipitation within each 4.3.2. Topsoil is to be loose, friable Sandy loam that is clean and free of control circuit. Velocitie5 Shall not exceed 5 feet per second. S8 5536 W 48.9 w= toxic materials, noxious weeds, weed Seeds, rocks, grass or other 7.1 . 1 2. Contractor is responsible complying with all code5 and paying all HEL 5EM(4) �ti foreign materials. permits nece55ary. M 1 gal FENCE S LA-167�� 4.3.3. Topsoil Should have a h of r to 5.5. 7.1 . 1 3. Sprinkler heads Shall have matched precipitation within each control VIB GAR(1 ) �� UNE G,201 p p p p p I I �/ PYR GAL(4) F i 4.3.4. If on Site topsoil does not meet these minimum Standards contractor circuit. Velocities Shall not exceed 5 feet per Second. I 2 gal / 15 gal N, / %, DSCAYV0.1`��� is responsible for providing approved imported topsoil or improving 7.1 . 14. water schedule to be provided at a min of 50016 evapotranspiration GAL KAR(2) HEL 5EM(3) N, on5ite topsoil per the approval of the project manager. as determined by the local ET. 1 g VIB E,u (1 l 1 gal 4.4. If imported topsoil is used it must be from a local source and be 7. 1 . 1 5. 5. 1.14. Install all irrigation per irrigation drawings. utilize material m 3 gal VIB BU3 (1) Screened free of any debris or foreign matter. Topsoil must not contain specified or approved equal. UJ 3 gal S °° rock5, 5tick5, lumps, or toxic matter. 5. CONTRACTOR RESPONSIBILITIES I VIB GAR(1) 629 \ 4.5. Smooth, compact, and fine grade topsoil in lawn areas to Smooth and 5.1. Contractor is responsible for 1 year of maintenance starting at the final N I 2 gal E uniform grade .5" below adjacent Surfaces. date of acceptance by owner. o GAL KAR(2) 61S \ 11 1 4.6. Prepare finish grade of topsoil to elevations Set by Engineer's plane with 5.2. Estimated quantities are Shown for general reference only. Contractor I 9 LU drainage away from 5tructure5. Refer to Civil Engineer'5 plane shall be responsible for all quantity estimates. M N (4) GAL KAR / C for grading information. 5.3. Refer to note 2. 1 regarding damages to existing utilities s permitting 1 I HEL 5EM(2) 4.7. Amend all new plantings with 2 arts topsoil and 1 art com o5t. note in Irrigation Section. EXISTING 6'CLOSED VISION FENCE 1 gal p g p p p p TO REMAIN,PRESERVE S PROTECT 5. PLANTER BED MULCH 5.4. All plant material and workmanship Shall be guaranteed for a period of _ I VIE, GAR(1) 5.1 . All planter beds to receive 2" depth of black and tan mini rock mulch or one year beginning at the date of Acceptance by Owner. Replace all 2 gal .n approved equal. Submit for approval prior to placement. dead or unhealthy plant material immediately with Same type and Size at _ €P I \ V 1 5.1 . 1 . Install over commercial grade weed-barrier fabric, per manufacturer no cost to Owner. recommendations. 5.5. Land5cape contractor to turn in as built drawings at the end of project. ts) 6. PLANTS Substantial completion will not be granted until 2 copie5 @ 1 "=20' 5c �LACKSTONEale SUBDIVISION LU V N 6. 1. All plant material Shall be installed per industry Standards. are turned in and approved by owner'5 representative. H I / LU LW It 6.2. All plant material Shall meet or exceed the minimum federal Standards as q- In the event of a discrepancy, notify the General Contra-tor. V / LOT 6, BLOCK 1 Ln S Q Q�regulated by AN51 z60. 1, American Standard for NurseryStock. Plants CKS1�0NE SUB IV v � _ �� N v z Q LOT 1, BLOCK W - ,� �i LU . a = 00 i � Q LU 0 10 20 30 feet 7L7L77--7�7 SCALE: 1" = 10' O O C NOTES: 1. DO NOT DAMAGE OR GUT LEADER NOTES: BAGKFILL SHALL BE 1 00% 2. DO NOT DISTURB ROOT OR DAMAGE ROOT BALL WHEN INSTALLING TREE OR TREE REMOVE ALL TAGS, TWINE OR TOPSOIL. WATER SETTLE ALL STAKES. OTHER NON BIODEGRADABLE PLANTIN65 TO ENSURE PLANT 3. TREE 5TAKIN6 SHALL BE AT THE DISCRETION OF CONTRACTOR. HOWEVER ANY MATERIALS ATTACHED TO ROOTBALL MAINTAINS 2" TREES DISTURBED FROM PLUMB DURING THE PLANT WARRANTEE PERIOD WILL BE PLANT OR ROOT MASS. HEIGHT ABOVE EX15TINO REPAIRED OR REPLACED AT GONTRACTOR'S EXPENSE. SOILS WHEN COMPLETE. REVISIONS 4. WATER PLANTS THOROUGHLY IMMEDIATELY AFTER IN5TILLATION. MRK DATE Description 5. REMOVE ALL BURLAP,TWINE, ROPE,OR MATERIAL FROM THE TOP 3 OF THE PLANTER FERTILIZER ROOTBALL. PLANT PIT HOLE E BE MIN 6" TABLETS SET 3" BELOW A ** ** 6. 5' DIAMETER PLANTER BED/MULCH RING AROUND THE TRUNK OF THE TREE. 5"OF WIDER AND 6"DEEPER THAN NURSERY CONTAINER GRADE, APPROVED BY MULCH MIN.DO NOT PLACE MULCH WITHIN 2"OF TRUNK OF TREE. OWNER AND/OR 7. ALL LARGE AND ORNAMENTAL TREES TO REGEIVIN6 5TAKIN6 PER DETAIL 1/L 1.1 O MAINTENANCE COMPANY. 3" BELOW GRADE, QUANTITY PER PLAN $ SPEC5. TOP TWO STRUCTURAL GRAFT VISIBLE ABOVE MULCH 2"MIN. B ROOTS: <3" BELOW SOIL LINE AWAY FROM TOP OF ROOTBALL. FOLD BURLAP FROM TRUNK OF PLANT. PLANT 5CHEDULE SOIL LINE OF THE TOP OF TOP OF ROOT BALL 3" DEEP MULCH LOWEST THE ROOT BALL AFTER DOWN INTO GROUND; MIN. TREES GORE BOTANICAL NAME / COMMON NAME CONT QTY JOB NO: 1 7-753 STRUCTURAL ROOT REMOVING EXCE55 SOIL. SET TOP OF BALL DATE: JUNE 9,20 17 <5" BELOW TOP OF 2%2 2-3" OF MULCH FLUSH WITH FINISH LAWN OR PAVING PYR GAL Pyrus calleryana / Ornamental Pear 1 5 gal 4 DRAWN BY: K5 LANDSCAPE REQUIREMENTS: ROOT BALL BAGKFILL MIX SEE GRADE CHECKED BY: JB 11III1 NOTES AND CITY OF MERIDIAN MUNICIPAL CODE =ry -III-III III-II _I-III=_ III-III= SPECIFICATIONS. DRAWING TITL0 - = III=III=11 1 2" TO 1 5"FOR LARGER SHRUB 5HRUB5 GORE BOTANICAL NAME / COMMON NAME SIZE QTY F1 1=1 111-I 11=1 501L 5AUGER >3"HIGH III=III �' 11=III=III- ROOT BALLS, BUFFER REQUIREMENTS: REMOVE AT END OF I=III=III -III=III-' =Ti-Ili1 Ti-Ti=11 MAKE DEPTH IN GAL KAR Galama rosti5 x acutiflora 'Karl Foer5ter' / Feather Reed Gra55 1 al 10 *WHEN A FENCE IS PROVIDED,TREES REDUCED TO 1 PER 55 PLUS SHRUB AND/OR LAWN PROJECT ;III-III - - 11=III=III 9 9 =III- =1I1=1I1=1I1=III- -III=1I1- MIN. 4" DEEPER 'I I- =1 11 I1=1I1=1I 1=1 I1=1 I I _ I I1=1I1= ��� - -III-I - - 1 I-III-III=1I1=1I 1 I- - -I I1=1I1=1' THAN BALL) L A N D 5 G A P E --III-III=III=III-III=III-III=III=III- =III=III=III=III=III= • BUFFER LENGTH TREES REQ'D SHRUBS REQ'D GUT AND FOLD WIRE ill=IIIIII-III=III=III-III=III-III=III- =III=III-III=III= -ITI-ITIIII=111=11-11�=11�-111-111-111- 11�-111=11=III- BALL AND BURLAP PLANT HEL 5EM Helictotrichon 5emperviren5 / Blue Oat Gra55 1 gal q • SOUTH 140 4 4 BASKET FROM TOP OF ITI=III-III-III-IIL-III=ITI-ITI-IIL-III- I II-III-111 (IF CONTAINER - GROWN SCREENING ROOTBALL COMPACT 501E UNDER A ROOTBALL TO qO% SOIL SURFACE PLANT WITH ROOTS PLAN TREE 8 SHRUB MINIMUMS: PROCTOR. ROUGHENED TO L005ENE01 AND PULLED VIB GAR Viburnum carle5ii / Korean Spice Viburnum 2 gal 3 • EVERGREEN 6-7' BIND WITH NEW OUT TO PREVENT PLANT • ORNAMENTAL 2"CALIPER SOIL FROM BEGOMIN6 ROOT SHEET NUMBER • SHADE TREES 2"CALIPER BALL AND BURLAP TREE PUNTING SHRUB PUNTING BOUND) VIB BU3 Viburnum x 'Burkwoodii' / Burkwood Viburnum 3 gal 2 I+� � •OO • WOODY SHRUBS 2 GALLON 1 3/4" = 1'-0" 32 g343.33-05 1" = 1'-0" 32 g333.16-01 SHEET 1 OF 1 1 2 13 4 15 6 7 8 19 110