DA Legal Description V1AAk 5awtooth Land 5urveyin6j, LLC
F: (208) 398-8 104 F: (208) 398-8 105
2030 5. Wa5hincgton Ave., Emmett, ID 83G 17
February 28, 2019
Phase 2 Boundary Description
BASIS OF BEARINGS FOR THIS DESCRIPTION IS NORTH 89059'28" WEST BETWEEN THE 5/8"
REBAR ILLEGIBLE CAP MARKING THE E1/16 CORNER COMMON TO SECTIONS 32 AND 5, AND THE
BRASS CAP MARKING THE S1/4 CORNER OF SECTION 32, BOTH IN T. 3 N., R. 1 E., B.M., ADA
COUNTY, IDAHO.
A PARCEL OF LAND LOCATED IN THE SW1/4 OF THE SE1/4 OF SECTION 32, T. 3 N., R. 1 E., B.M.,
CITY OF MERIDIAN, ADA COUNTY, IDAHO, MORE PARTICULARLY DESCRIBED AS FOLLOWS:
COMMENCING AT A BRASS CAP MARKING THE S1/4 CORNER OF SAID SECTION 32;
THENCE NORTH 0008'57" EAST, COINCIDENT WITH THE WEST LINE OF SAID SW1/4 OF THE SE1/4
OF SECTION 32, A DISTANCE OF 75.00 FEET TO A 5/8" REBAR PLS 14221, THE POINT OF
BEGINNING;
THENCE LEAVING SAID WEST LINE OF THE SW1/4 OF THE SE1/4 OF SECTION 32,
SOUTH 89059'28" EAST, PARALLEL WITH THE SOUTH LINE OF SAID SW1/4 OF THE SE1/4 OF
SECTION 32, A DISTANCE OF 671.44 FEET TO A 5/8" REBAR PLS 14221;
THENCE NORTH 45000'32" EAST, 22.63 FEET TO A 5/8" REBAR PLS 14221;
THENCE NORTH 0000'32" EAST, 73.62 FEET TO A 5/8" REBAR PLS 14221;
THENCE NORTH 40019'29" EAST, 183.61 FEET TO A 5/8" REBAR PLS 14221;
THENCE SOUTH 89059'28" EAST, PARALLEL WITH SAID SOUTH LINE OF THE SW1/4 OF THE SE1/4 OF
SECTION 32, A DISTANCE OF 136.15 FEET TO A 5/8" REBAR PLS 14221;
THENCE NORTH 0000'32" EAST, 592.00 FEET TO A 5/8" REBAR PLS 14221;
THENCE NORTH 89059'28" WEST, PARALLEL WITH SAID SOUTH LINE OF THE SW1/4 OF THE SE1/4
OF SECTION 32, A DISTANCE OF 940.37 FEET TO A 5/8" REBAR PLS 14221 ON SAID WEST LINE OF
THE SW1/4 OF THE SE1/4 OF SECTION 32;
THENCE SOUTH 0008'57" WEST, COINCIDENT WITH SAID WEST LINE OF THE SW1/4 OF THE SE1/4
OF SECTION 32, A DISTANCE OF 821.62 FEET TO THE POINT OF BEGINNING.
THE ABOVE DESCRIBED PARCEL CONTAINS EN
16.60 ACRES, MORE OR LESS.
a 14.2
OF
SAC POAl�P
P:\2017\17272-CMG IMPRESSIVE EASTRIDGE SUBDIVISION\Survey\Drawings\Descriptions\17272�dary Phase
2 Desc.docx
Page 11
PRopF\ `
U)
D U) m
0= mcn
y
0 <
Ocnm
ZOnD
m U)
N �
;(J
D—ia�
OD?rn
z�=
mN
0
0
m
N
C7
a
N,
O
p
o
Z
S 0°08'57_' W _ 821.62'
G
Gro O v, w
rn ? N z ao
V p
o�
m
Ll
bI
li
kO
m
rn
v ON
p
r)
�=x
mn
wIo
o
r
ti9
`�
.p
Z
✓��{9.
0
0°
Mtn
nr
%0
rti
m
awi vi
. %D
ti
W
N
rn
N 0000'32" E 592.00'
10
0
I�
Map Check Wed Feb 27 16:27:46 2019
17272 EASTRIDGE PHASE 2- CLOSURE
Operator AL Project
Date Time
Course Bearing Distance PT# Northing Easting Description
301 685857.96 2462223.17 CALL
301-302 S 89059'28" E 671.44✓ 302 685857.85 2462894.60 CALC
302-303 N 45000'32" E 22.63✓ 303 685873.85 2462910.61 CALC
303-304 N 00000'32" E 73.62 1/304 685947.47 2462910.62 CALC
304-305 N 40019'29" E 183.61 ,'305 686087.45 2463029.44 CALC
305-306 S 89059'28" E 136.15 ✓306 686087.43 2463165.58 CALC
306-307 N 00000'32" E 592.00✓ 307 686679.43 2463165.68 CALC
307-308 N 89059'28" W 940.37/ 308 686679.58 2462225.30 CALC
308-301 S 00008157" W 821.62/ 301 685857.96 2462223.17 CALC
Closure error distance> 0.000 Error Bearing> N 90000'00" E
Closure Precision> 1 in 3441434989295.6 Total Distance Traversed> 3441.43
723100.7
16.6001 ✓
d
2-
2/7
Page 1 of 1