PZ - Applicant's Response to Staff Report Kimley>>> Horn April 28, 2022 Joseph Dodson Community Development City of Meridian 33 E. Broadway Ave. Meridian, Idaho 83642 Re: Burnside (Jackson) Ridge Estates Comment Response On behalf of Linder Holdings, we are submitting a response to comments received from the City of Meridian Staff Report for the April 28, 2022 Planning & Zoning Commission hearing. We respectfully request outstanding comments should they arise be conditioned where possible. Regarding the project report received on April 22, 2022 for the project referenced above, please see the responses below. Comment numbers correspond to the original report. Any items not referenced below we are in agreement with at this time. II. SUMMARY OF REPORT A. Project Summary Neighborhood Meeting Date: June 18, 2021 Response: The June 18, 2021 neighborhood meeting was scheduled and canceled due to COVID-19. Neighborhood meetings were held on March 18, 2021 and October 19, 2021. Several additional individual meetings were also held. We request these dates be added to the report. VIII. CITY/AGENCY COMMENTS & CONDITIONS A. PLANNING DIVISION 1. A Development Agreement (DA) is required as a provision of annexation of this property. Prior to approval of the annexation ordinance, a DA shall be entered into between the City of Meridian, the property owner(s) at the time of annexation ordinance adoption, and the developer. A final plat will not be accepted until the DA is executed and the Annexation and Zoning ordinance is approved by City Council. Currently, a fee of $303.00 shall be paid by the Applicant to the Planning Division prior to commencement of the DA. The DA shall be signed by the property owner and returned to the Planning Division within six (6) months of kimley-horn.com11 •. • Street, Suite 210, Boise, 1 1: 207-8477 Kimley>>> Horn the City Council granting the annexation; The DA shall, at minimum, incorporate the following provisions: Response: We agree to enter into a development agreement subject to agreement on the final conditions to be included. We also agree to pay the associated$303 fee. b. Future development shall be substantially consistent with the proposed phasing plan with the modification to include the clubhouse and pool and the entirely of Lot 1, Block 12 with the first phase of development. Response: We have met with staff and agree to compromise by including the pool, clubhouse and Lot 1, Block 12 within the second phase. This is in response to our concerns with a limited number of homes from Phase 1 paying the high HOA fees associated with these large amenities once divided amongst few residents. We request this condition be modified. d. The required landscape street buffer, detached pedestrian facilities, and road improvements along W. Victory Road and S. Linder Road shall be constructed and vegetated with the first phase of development. Response: We agree to construct and vegetate all road improvements along Victory and Linder Road within the first phase of development, except for the Linder improvements adjacent the existing home (3801 S Linder Rd) which are currently planned for Phase 5. This is based on the existing homeowners desire to remain until Phase 5. Improvements during Phase 1 would interfere with their existing horse corral. We request this condition be modified. e. The existing home at 3801 S. Linder Road shall connect to City services within 60 days of the City Council approving the Annexation ordinance per UDC 9-1- 4 & UDC 9-4-8, unless City Council grants a different timeline of service connection—the home's existing access to Linder may remain until phase 3 when the property will have access to Linder through internal local streets and the first leg of E. Holstein, as shown on the approved phasing plan. Response: We request City Council consider a waiver or modification on the timeline for service connection of the existing home and removal of access to Linder. Sewer is not available from Linder Road adjacent the existing home and would require costly extension of sewer. We request a waiver be considered as the expense to connect to utilities and construct a new driveway to Phase 3 is not reasonable as the home and new driveway will be demolished during Phase 5. We request this condition be modified. kimley-horn.com1100 W. Idaho Street, Suite 210, Boise, •. • 83702 208-207-8477 Ki m ey>>> H o r n Page 3 PRELIMINARY PLAT CONDITIONS: 2. The preliminary plat included in Section VII.B, dated February 3, 2022, shall be revised as follows at least fifteen (15) days prior to the City Council hearing: a. Revise Blocks 2 & 3 to include R-8 compliant lots and add additional building lots to comply with the minimum gross density requirements west of S. Farmyard Avenue (at least 2.5 du/ac). Response: Discussion with staff elaborated that Comprehensive Plan Map Amendments are only accepted twice a year with the next submittal deadline closing on June 15, 2022. This would require a hearing before the Planning & Zoning Commission (likely August 2022) and a hearing before City Council (likely October 2022). This timeframe extends our entitlement period significantly. We would prefer to add units with R-8 zoning to meet the minimum gross density requirement of 2.5 du/ac. We believe the most logical placement of these units to be adjacent the open space areas internal to the development. This will ensure adequate transition to the existing parcels adjacent this project is maintained. We request this condition be modified. b. Shift E. Holstein at least 12 feet to the north to allow for the standard requirement of constructing half of the street section plus 12 additional feet of pavement for safe vehicular access—the stub location of this collector street along the west project boundary should also be shifted this distance to mitigate future connectivity issues with the adjacent county residence to the west. Response: After discussion with staff regarding our coordination with the adjacent landowner and potential development to the south, we agreed an agreement would be an acceptable alternative to relocating Holstein Dr. The agreement will allow the placement of Holstein in its current position and ensure the construction of safe vehicular access occurs with our development. We request this condition be modified. c. Add an additional stub street to the north boundary near Lot 11 or Lot 12, Block 5 for future connectivity and to break up the block length of E. Pivot Drive. Response: We agree to this condition with the latitude to determine the exact location which will work best on the site and with adjacent neighbors. d. Add an additional cross street from S. Red Angus Way heading northeast to S. International Way across the Calkins Lateral in alignment with E. Drawbar Street to create a compliant block length, provide better interconnectivity, and provide an additional access to the multi-use pathway along the Calkins Lateral. kimley-horn.com1100 W. Idaho Street, Suite 210, Boise, •. • 83702 208-207-8477 Kimley>>> Horn Response: After further discussion with staff, it was clarified we intend to pipe the Calkins Lateral. This will remove the grade limitations for pedestrians from Red Angus Way to Drawbar Street, meaning they can utilize the existing micro- paths which provide the break in block length. We request this condition be removed. f. Add the following additional micro-path lots at least 15 feet in width with a 5- foot wide pathway: 1) south side of E. Pivot in line with the recommended stub street location to head south between pivot and E. Drawbar and; 2) along the west boundary from S. Agronomy Avenue to the west property line near the shared property line of Lots 10 & 11, Block 6. Response: We agree to add the micro-path as dimensioned above to the south side of E. Pivot in line with the recommended stub street. We have concerns with the addition of a micro-path from S. Agronomy Ave. to the west property line near Lots 10 & 11, Block 6. This was a significant concern to adjacent neighbors and feel the existing west bound pedestrian connections on Holstein, Calkins Lateral and Victory Road are sufficient. We request this condition be modified. g. Depict the correct width of the Calkins Lateral easement and depict whether any buildable lots are encumbered by said easement. Response: After further discussion with staff, it was clarified we intend to pipe the Calkins Lateral which has been approved by the irrigation company. We'll confirm the notes and irrigation company comments are in alignment prior to City Council. We request this condition be modified. 3. The landscape plan included in Section VII.D, dated January 31, 2022, shall be revised as follows at least fifteen (15) days prior to the City Council hearing: d. Replace a lot in each of the two southern quadrants (southwest third and southeast third) with an additional open space lot—Staff recommends Lot 21 or 22, Block 13 in the southeast third and Lot 7 or 8, Block 7 in the southwest third. Response: The lot sizes of this development ensure adequate open space is available within each lot. Micro-paths and detached sidewalks encourage walking to the central community open space and amenity area, which are a sufficient size for all residents to enjoy. We request this condition be removed. f. Remove the micro-path common lots of Lot 7, Block 12 & Lot 10, Block 11 in lieu of the recommended new cross street noted in VIII.A.2d. Ki m ey>>> H o r n Page 5 Response: See response to Condition #2d above. We request the micro-paths as drawn remain. We request this condition be removed. 16. Applicant shall tile all irrigation facilities within the development area per UDC 11-3A6, unless waived by City Council. The applicant is seeking a waiver to leave the Calkins Lateral open as linear open space. Response: The proposal includes tiling the Calkins Lateral. We request this condition be modified. If you have any further questions, please contact me at 208-207-8477 or by email at Nicolette.Womack@kimley-horn.com. Sincerely, Kimley-Horn and Associates, Inc. Nicolette Womack, AICP Planner 00208-207-8477