Loading...
CC - Engineer Statement THE 00 LAND - GROUP April 7, 2022 Mr. Warren Stewart, PE City of Meridian 33 E. Broadway Ave. Meridian, ID 83642 RE: Aviator Springs Subdivision Street Centerline Elevation Certification PN 120194 Dear Mr. Stewart: As required by the City's final plat application requirements, please accept this statement certifying that all street finish centerline elevations are set a minimum of three (3)feet above the highest established normal groundwater elevation. According to the initial test pit investigations and recent groundwater monitoring,the groundwater within this project was not encountered within a depth of three (3)feet of the existing ground. Based on the above information, I certify that groundwater would be greater than three (3)feet below the designed finished street centerline elevations throughout the project. Sincerely, ,OVAL EN THE LAND GROUP, INC. ��5G\S G James W. Gute, PE , Principal, Project Civil Engineer 68 04/07/2022 ATEoF0 462 East Shore Drive, Suite 100, Eagle, Idaho 83616 208.939.4041 thelandgroupinc.com