Loading...
CC - Amenity Details NOTES: NOTES: 1. THE STAKING OF TREES IS TO BE THE CONTRACTOR'S OPTION; HOWEVER, THE CONTRACTOR IS REMOVE DEAD/DAMAGED BRANCHES AND PRUNE TO 1. THE STAKING OF TREES IS TO BE THE CONTRACTOR'S OPTION; HOWEVER,THE CONTRACTOR IS REMOVE DEAD/DAMAGED BRANCHES AND PRUNE TO 1 1 THE RESPONSIBLE TO INSURE THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN RESPONSIBLE TO INSURE THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN WAIIIIIIIn WE STRAIGHT FOR A MINIMUM OF 1 YEAR. ALL STAKING SHALL BE REMOVED AT THE END OF THE ONE INTERNATIONAL SOCIETY OF ARBORICULTURE STANDARDS; STRAIGHT FOR A MINIMUM OF 1 YEAR. ALL STAKING SHALL BE REMOVED AT THE END OF THE ONE INTERNATIONAL SOCIETY OF ARBORICULTURE STANDARDS; LAN D YEAR WARRANTY PERIOD. IMPROPERLY PRUNED TREES (AS DETERMINED BY THE YEAR WARRANTY PERIOD. IMPROPERLY PRUNED TREES (AS DETERMINED BY THE . 2. IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS,THE CONTRACTOR IS TO LANDSCAPE ARCHITECT) SHALL BE REMOVED AND REPLACED. 2. IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS,THE CONTRACTOR IS TO LANDSCAPE ARCHITECT) SHALL BE REMOVED AND REPLACED. - GROUP NOTIFY THE LANDSCAPE ARCHITECT BEFORE PROCEEDING. NOTIFY THE LANDSCAPE ARCHITECT BEFORE PROCEEDING. 3. LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO 3. LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO INSTALLATION OF PLANT MATERIAL. INSTALLATION OF PLANT MATERIAL. a� o 4. WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE PREVAILING WIND DIRECTION 4. WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE STANDARD OR - PREVAILING WIND DIRECTION STANDARD OR FIGURE EIGHT TYING METHOD. SECURE THE TIES TO THE STAKES WITH TREE WRAP TRUNK PROTECTION, FIGURE EIGHT TYING METHOD. SECURE THE TIES TO THE STAKES WITH GALVANIZED NAILS TO GALVANIZED NAILS TO PREVENT SLIPPAGE. PREVENT SLIPPAGE. a 5. WATER TREE TWICE WITHIN THE FIRST 24 HOURS. REMOVE AFTER INSTALLATION 5. WATER TREE TWICE WITHIN THE FIRST 24 HOURS. RUBBER CINCH TIE 00 6. IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE RUBBER CINCH TIE 6. IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY. ARCHITECT IMMEDIATELY. C� �o 2"x 2"x 8'CEDAR STAKE- DO NOT PENETRATE ROOTBALL. o, 2"x 2"x 8'CEDAR STAKE-DO NOT PENETRATE ROOTBALL. ROOT PROBE SEE NOTE 1. SET STAKES PARALLEL TO PREVAILING WIND. ROOT PROBE SEE NOTE 1. SET STAKES PARALLEL TO PREVAILING WIND. � L q SOIL LINE MULCH LAYER, KEEP MULCH 3"AWAY FROM SOIL LINE MULCH LAYER, KEEP MULCH 3"AWAY FROM TRUNK I TRUNK UTILIZE SOIL/ROOT PROBE AROUND TRUNK \ BACKFILL WITH SOIL PLANTING MIX. SEE UTILIZE SOIL/ROOT PROBE AROUND TRUNK T' \\ BACKFILL WITH SOIL PLANTING MIX. SEE (APPROX. 34"AWAY FROM TRUNK)TO LOCATE 3" SPECIFICATIONS FOR ADDITIONAL INFORMATION. (APPROX. 3-4"AWAY FROM TRUNK)TO LOCATE 3" SPECIFICATIONS FOR ADDITIONAL INFORMATION. HIGHEST ROOTS. HIGHEST ROOTS SHOULD BE HIGHEST ROOTS. HIGHEST ROOTS SHOULD BE POSITIONED AT OR SLIGHTLY ABOVE GRADE LEVEL. �\� \ \\ \ FINISH GRADE POSITIONED AT OR SLIGHTLY ABOVE GRADE LEVEL. \ \ \ \ \\ FINISH GRADE REMOVE BURLAP,TWINE, AND WIRE BASKET FROM TOP /\\/\\ \ \\ \ \\ \ \ /\/ 1 \ \/ \ \ \ _" REMOVE BURLAP, TWINE,AND WIRE BASKET FROM TOP OF ROOTBALL, REMOVE ALL NAILS,TIES,AND PLASTIC \ \ COMMERCIAL SLOW RELEASE FERTILIZER TABLETS /OF ROOTBALL, REMOVE ALL NAILS,TIES, AND PLASTIC \ \ COMMERCIAL SLOW RELEASE FERTILIZER TABLETS FROM ROOTBALL. IF SYNTHETIC BURLAP IS UTILIZED TO \ \\ \ \ \ \ \ \\/\/ FROM ROOTBALL. IF SYNTHETIC BURLAP IS UTILIZED TO \/ \/A � V/VA VA v v v /VA / v s>,>� >>3>,>> ' v v // // WRAP THE ROOTBALL, IT SHALL BE COMPLETELY \/\\ \ s�>; \ \\ WRAP THE ROOTBALL, IT SHALL BE COMPLETELY REMOVED. ONLY BIODEGRADEABLE BURLAP SHALL BE \\/ \/\/\/\/\/\ \ \/\/ \ REMOVED. ONLY BIODEGRADEABLE BURLAP SHALL BE LEFT ON THE BOTTOM OF THE ROOTBALL. VL/ V/V/�V/�V/�V/�V/�V/�V/� /V/\ // LEFT ON THE BOTTOM OF THE ROOTBALL. VAS%\ VAS/AAA%\�%\�/�/�/�/AAA /j�/j�/j�/j�/j�/j�/j�/j�/j�/j�// SET ROOTBALL ON NATIVE UNDISTURBED SUBSOIL AVA VAjjAAjj�jAAjjA�jjA�jjA�jjAAjjAAjjAA/AAj j SET ROOTBALL ON NATIVE UNDISTURBED SUBSOIL 2x ROOTBALL DIAMETER 2x ROOTBALL DIAMETER Deciduous Tree Planting 3x ROOTBALL DIAMETER Coniferous Tree Planting 3x ROOTBALL DIAMETER 1 Scale: NITS 2 Scale: NITS OUT-TO-OUT DECK PLANKS GENERAL NOTES: **CLEAR WIDTH 5/8"0 X V-4" TIMBER BOLT & STRUCTURE NUT W/(2)-MALLEABLE IRON SPECIFICATIONS: MATERIALS AND CONSTRUCTION OF THIS STRUCTURE SHALL BE IN WASHERS. FIELD DRILL 11/16"0 ACCORDANCE WITH THE STANDARD SPECIFICATION FOR CONSTRUCTION OF ROADS AND 6 6 HOLES IN CURB , DECK PLANKS & BRIDGES ON FEDERAL HIGHWAY PROJECTS (FP-03) AND STANDARD SPECIFICATIONS FOR CONTINUOUS PLATE TO MATCH CONSTRUCTION OF TRAILS AND TRAIL BRIDGES ON FEDERAL PROJECTS, 2" X 8" MINIMUM CURB BLOCK. TREAT HOLES PER RUNNING PLANK i i GENERAL NOTES. TIMBER & LUMBER: SOLID SAWN TIMBER MEMBERS SHALL CONFORM TO THE REQUIREMENTS OF 2" X 12" SHOWN THE GRADING RULES AGENCY FOR THE SPECIES, TYPE, AND GRADE SPECIFIED BELOW. 6" X 6" CURB DECK PLANKS, CURBS, SILLS, & BACKING PLANKS _ _ - COASTAL REGION DOUGLAS FIR-LARCH ROUGH SAWN NO.1 GRADE, GRADING RULES _ 3" X 6" X 2'-0" CURB BLOCKS AGENCY - WWPA, WCLIB SPACED AT 5'-0" ON CENTER RUNNING PLANKS - - - COASTAL REGION DOUGLAS FIR-LARCH ROUGH SAWN NO.2 GRADE, GRADING RULES -- 3" X 8" MINIMUM DECK PLANKS AGENCY - WWPA, WCLIB 2" X 6" CONTINUOUS PLATE RAILS & POSTS (SEE PROJECT CRITERIA) UNTREATED 7" 7" - REDWOOD, S4S, NO.1 GRADE GRADING RULES AGENCY - RIS *SPACE O - WESTERN RED CEDAR, S4S, SELECT STRUCTURAL GRADE GRADING RULES AGENCY - WWPA, WCUB 2'-0" MAXIMUM TREATED O SHRUB INCREMENTS - HEM-FIR/DOUGLAS FIR, S4S, NO.1 GRADE GRADING RULES AGENCY - WWPA, WCLIB STRINGER STRINGER TREATMENT: SEE PROJECT CRITERIA FOR MEMBERS IDENTIFIED TO BE TREATED AND FOR ■� BRIDGE WITH CURBS ONLY TREATMENT TYPE. PRESERVATIVE TREATMENT SHALL BE IN ACCORDANCE WITH THE CURRENT BOULDER, LOCATED, SIZE AND TYPE PER DECK SECTION W/STRINGERS ©2'-0" O.C. AMERICAN WOOD PROTECTION ASSOCIATION (AWPA) SPECIFICATIONS USING THE TREATMENT PLANS. THREE MATERIALS LISTED BELOW. TREATMENT WILL COMPLY WITH THE REQUIREMENTS OF THE R ■� a **MINIMUM NUMBER OF STRINGERS CURRENT EDITION OF WESTERN WOOD PRESERVERS INSTITUTE (WWPI) "BEST MANAGEMENT INSIDE FACE TO INSIDE FACE OF RAILING PRACTICES FOR THE USE OF TREATED WOOD IN AQUATIC ENVIRONMENTS". COMPACTED SUBGRADE AS 11/16"0 (TYP) SYSTEM 11/16"0 (TYP) ■� REQUIRED F I 1 1/2" 1 1/2" STRINGERS, DECKING, RUNNING PLANKS, & RAILING SYSTEM, IF TREATED - AWPA USE CATEGORY SYSTEM (U1) FOR USE CATEGORY 3B ABOVE FINISH GRADE 1 1/2 1 1/2 GROUND-EXPOSED (UC3B) 6" 6" - PENTACHLOROPHENOL IN LIGHT OIL (TYPE C SOLVENT) WATER RETENTION - COPPER NAPHTHENATE (CuN) IN LIGHT OIL (TYPE C SOLVENT) MULCH LAYER BASIN / / \ 10 1/2" 10 1/2"o 10 1/2" 10 1/2"o SILLS, BACKING PLANKS, CRIBS, & TIMBER WALLS, IF TREATED - AWPA USE CATEGORY SYSTEM (U1) FOR USE CATEGORY 4B GROUND 1 1/2" 1 1/2" 1 1/2" 1 1/2" CONTACT-HEAVY DUTY (UC4B) - PENTACHLOROPHENOL IN HEAVY OIL (TYPE A SOLVENT) COD 2'-0" 2'-0" - COPPER NAPHTHENATE (CuN) IN HEAVY OIL (TYPE A SOLVENT) FIELD TREATMENT: COPPER NAPHTHENATE (2% SOLUTION) SHALL BE FURNISHED FOR FIELD PLAN-CURB BLOCK PLAN-CURB BLOCK AT SPLICE TREATING OD WOOD. ALL ABRASIONS AND FIELD CUTS -APPROVED BY THE C.O.R.- SHALL BE CAREFULLY TRIMMED AND GIVEN THREE BRUSH COATS OF THE FIELD TREATMENT CM \ \\ \\ \ \ \ \ \ \ \ 5/8"0 TIMBER SOLUTION. WHERE APPROVED FIELD DRILLING OF BOLT OR NAIL HOLES IS REQUIRED, THE 1/2 HOLES SHALL BE FILLED WITH PRESERVATIVE PRIOR TO INSERTING THE FASTENERS. BOLTS (TYP) CURB CURB CURB ■ ■1 CURB DEPTH HARDWARE AND STRUCTURAL STEEL: SEE PROJECT DESIGN CRITERIA FOR STEEL HARDWARE - /// FINISH. GALVANIZED OR UNFINISHED HARDWARE SHALL MEET THE REQUIREMENTS OF COMMERCIAL \\%\\%\\%\\% /\\%\\%\\%\\%\\%\\%\\%\\%\\%\\% BACKFILL WITH SOIL PLANTING AASHTO M270, GRADE 36, WITH NUTS AND BOLTS CONFORMING TO ASTM A307, GRADE A. \//\//\//\/ //\//\//\//\//\//\//\//\//\//\// m WEATHERING STEEL AND HARDWARE SHALL MEET THE REQUIREMENTS OF AASHTO M270, CL Cc FERTILIZER TABLETS \\//\\/// ///\/\ //\\ MIX. SEE SPECIFICATIONS FOR _ GRADE 50W, WITH BOLTS AND NUTS CONFORMING TO ASTM A325, TYPE 3. USE MALLEABLE ADDITIONAL INFORMATION. IRON WASHERS AGAINST WOOD UNLESS OTHERWISE NOTED. ■- z = cc CA WHEN STRUCTURAL STEEL IS TO BE WELDED, THE WELDING PROCEDURE SHALL BE IN cc 0- ACCORDANCE WITH AWS D1.1 AND SHALL BE SUITABLE FOR THE GRADE OF STEEL AND LU NOTES: DECK PLANKS INTENDED USE OR SERVICE. O 1. NOTIFY LANDSCAPE ARCHITECT WHEN PLACING BOULDERS FOR APPROVAL. FABRICATION: SUBMIT SHOP DRAWINGS FOR ALL BRIDGE COMPONENTS (EXCEPT TIMBER � 2" X 6" CONTINUOUS PLATE RUNNING PLANKS). SHOW ALL DIMENSIONS AND FABRICATION DETAILS FOR ALL CUT L_ � 2. PLACE BOULDERS PRIOR TO INSTALLATION OF IRRIGATION SYSTEM. CD c� ELEVATION-TYPICAL CONNECTION ELEVATION-CONNECTION AT SPLICE OR BORED TIMBER. FIELD DRILLING OF HOLES SHALL NOT BE ALLOWED UNLESS 0 00 4.WHEN PLAC3. CLEAN ALL BNG OULDEOULDERS ORS IRT AND BURY /40OSE T0 1/3DOB BIS.OULDER BELOW FINISH GRADE. OTHERWISE NOTED ON THE PLANS. 0 cc 2i 5. DO NOT SCAR OR DAMAGE BOULDERS. SOLID SAWN CURB CONNECTION DETAILS ■� z a Lo � M � Shrub Planting 4 Boulder Installation 5 USFS Standard Bridge Detail 962-10-03a Q M 2E 3 Scale: NITS Scale: NITS Scale: NTS Revisions 1. TOP OF WALL, REFER TO CIVIL SHEETS LANDSCAPE SOD MIX, PER INSTALL TREE PER FOR MORE INFORMATION LANDSCAPE PLANS DETAILS 1 & 2/L1.50 8' O° TOP OF BERM, REFER Cl) LANDSCAPE PLANTING BED, PER TO CIVIL SHEETS FOR w BOULDER RETAINING WALL BY LANDSCAPE PLANS. MORE INFORMATION TOP OF BERM o DESIGN-BUILD CONTRACTOR CD PER CIVIL PLANS N 2' 2' o / 3-3.5' HT. BOULDERS FOR TREE CLEAR WIDTH VARIES CLEAR � WELL. REFER TO DETAIL 4/1-1.50 FOR ► ! r r oINSTALL SHRUB PER 1=1 I=I I=I I=I I BOULDER INSTALLATION DETAIL. 1" DETAIL 3/1-1.50 o =III=I I I I-I I-I I-I I-I I I I I=I I -_ 3'-3.5' HT. BOULDERS w 2/o CROSS SLOPE -III=III III-I -I -I -I III-III=III= Lu I- fill I I-I I ill II-III-III-III=1 I III=1 I I=1 I I=11 = FOR 5'x5'TREE WELL I MULCH AT EDGE =III=I I I=I I I=I I I I I II I IIIII I IIIII I IIIII I IIIII I 111=III=III=III=III= 5' \ __ BETWEEN PAVEMENT III-I I I-I I F= I1=I I M I - - III-III-III-I I I-I I I-I I - ______ __ __________________ AND FACE OF BOULDER =III=III=III=III=III=1 III=III=III=III=III=II�- 2.5 2.5 \% \/<%\/ x � \ \� �E OF�o -I 11=1 11=1 11=1 11=1 I I-I 11- I-1 I I-I 11=1 11=1 I I-III-I I BOULDER TREE WELL: PLAN VIEW /i\\/i\\/i\\/i\\/i\\/i\\/i\\/i\\�i `�i �i\\/i\\/i\\/i\\/i\\/i\\/i\\/i\\/i\\/i\\/i\\/i`\/i\\/i\\/i\\/i� ��� 2` W T �ti� =III=III=III=III=III 1'' 5' -111 III-III-III-III-III-- 2:1 SLOPE MAX PER CIVIL \\ /\\ /\\` `/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/ SIDEWALK PER CIVIL PLANS =III=III=III=III=III��I I- '1=III=III=III=III=III=11 / '�//0//�//�//�//�//� /%\//%\ /i �`!/%/%//\�/%/%/%/%/%/% \�/%/%/{ =lII=III=III=III-III=1 I -I I I-III=III=III=III=1 I/ - :; \\, DRAWINGS /i�//i\//i\ \ i\ ��jt�i\tii Cc _ru =I I M I M I M I M I I, 1�' "c "ASPHALT PA III-III-III-III-III-III FINISHED GRADE 3 LASS "C PAVING LA-1 589 = , III=III=III-III-III-I I I-'' \ \/ // I=III i 4 6"AGGREGATE BASE /�/�L`QNDSCAY�'��\\ � - III-III-III-III-I 11-1�I- III- /\\i/\\�\i/\\i/\\i/\\ III-1 I I-� III-III-III-III-I I1-'' I-III-III- GEOTExTILE FABRIC o�F/o7/2022 TREE PLANTING MIX PER NOTES I I-III-III-III I I 1 I-III-1 I_I-I 11= 1 I=III=III-III-I' ON SHEET L1.00 j-�I I_s I=1 I I-III III I 1 I "'-1�iiIIII ' �� Project No.: 120194 I-III-III-III- _I I I- a 1I M I I-III-I FUTURE ITD SERVICE UNDISTURBED EARTH Date of Issuance: 04.07.2022 I-III-III-III;I Project Milestone: Permit Set -III-III=III- ROAD AND HWY 16 III=III=III-III;11'- Figure 3-2. Asphalt Pathway Cross-Section Detail -III-III III- a II-111= - 47.8' Construction Documents Landscape Details - South Berm Cross-Section City of Meridian Pathways Master Plan Asphalt Pathway Section 6 7 Scale: 1/4" = 1' Scale: NTS L1m50 THE LAND DRAINAGE WINDOW TO EDGE OF DRY CREEK, • 2"-6"WASHED RIVER COBBLE AT 12" DIMENSION RANGES 2-4'TYP,SEE PLAN � '`�' Wit.., a�',h. . ' - - GROUP DEPTH. PLACE ROCKS IN ORGANIC lir FASHION TO CREATE A SMALL CREEK LIKE BASALT BOULDERS PER APPEARANCE ,* b PLAN AND DETAIL 4/L1.50 J�saa, y _"mil - •{ r4' r. ' +"••rA Ji r .4 2" ROUND COBBLE AT 4"DEPTH \i�\i�\i\\i�\i�\i�\i�\i�\i�\i�\i�\i\\i�\i�\i�\i�\i�\i�\i�\i\\i\\i�\i�\ice\i�\i�\i�\i< - 1 \\%/\%/\%/\%/\%/\%/\%/\%/\%/\\%/\%/\%/\%/\%/\%/\%/\%/�\%/\\%/�\%/�\%/�\%/�\%/�\%/� PROPOSED FINISH GROUND - PER GRADING PLAN VO MINIMUM 2/o SLOPE TO DRAINAGE WINDOW - w IY Dry Creek 2 Timberform Colossus Bench Bears Playgrounds Embankment Slide 4 Fallen Log Open Play Amenity 1 Scale: NTS Scale: NTS Scale: NTS Scale: NTS I PLANT SCHEDULE i SHRUBS CODE BOTANICAL/COMMON NAME SIZE CONTAINER QTY I so I o - - FRC sculpture outline / _ I i I i I t, BOUTELOUA GRACILIS'BLONDE AMBITION'/ i i I BB BLONDE AMBITION BLUE GRAMA 3 GAL. POT 52 Sculpture net L — — — — CORNUS SANGUINEA'MIDWINTER FIRE'/ �O 1/2"O x 8 1/2" SS wedge anchor(3) '°°° I I CM 5 GAL. POT 111 7 1/2" embed O�O - _-� i I MIDWINTER FIRE BLOODTWIG DOGWOOD 0 �_—� _ ■� afety surfacing (by others) ,�' i I I CERCOCARPUS MONTANUS/ALDERLEAF (7) B B , I i I I CM2 5 GAL. POT 21 inished grade i i MOUNTAIN MAHOGANY ■ (1 ) RW 16"x36"fiber reinforced concrete I i i FI FORSYTHIA X INTERMEDIA/BORDER FORSYTHIA 5 GAL. POT 41 ■ pier, 4000 psi (3) (by others) I ntegral footing i ----- - ompacted subgrade (by others) I 3 BB I i I FP2 FALLUGIA PARADOXA/APACHE PLUME 3 GAL. POT 33 \I I CA RA JS JUNIPERUS SABINA/SAVIN JUNIPER 5 GAL. POT 28 37'-10" r I I I y PHYSOCARPUS OPULIFOLIUS'MONLO'TM/ / Min 6' use zone I I i P62 DIABOLO NINEBARK 5 GAL. POT 9 CD So/ I\ (to be verified by installer) i PHILADELPHUS LEWISII'GOOSE CREEK'/WILD n / i i I � PG MOCKORANGE 5 GAL. POT 32 ■� � i (2) Sp o I I CL + 5'-6" Sculpture net '— — — '�� PT PURSHIA TRIDENTATA ANTELOPE BITTERBRUSH 5 GAL. POT 20 (3) FI / 4 16"x36" Fiber reinforced concrete -———— ——————— — I i CA---- -- pier, 4000 psi (3) (by others) ♦ � I RHUS TRILOBATA AUTUMN AMBER /AUTUMN • e" ih AMBER SUMAC\ — ---- (10) BB ♦ ♦ RA 5GAL. POT 131 � � / 1 - I ♦♦ 0 oro 3' 10" 3'-g 3-4- ———— ———————— —————— .. I�—j— ---- --------- ♦♦ M mime co N .. .d Sr O i i O I ♦ RW ROSA WOODSII/MOUNTAIN ROSE 5 GAL. POT 53 d • I c r / ■��� \ SO SALVIA DORRII/DESERT SAGE 3 GAL. POT 46 ' Lo a .= C\J CD R/W co - ------------- - ---- integral footing / , ♦ ) '(1 ) C M ���` SCHIZACHYRIUM SCOPARIUM 'THE BLUES'/THE I _ 3 PGa o , SS BLUES LITTLE BLUESTEM 3 GAL. POT 89 P2 (1 I %ME ME ___ I I Revisions 1� \ l 16' GFRC sculpture/ / SS (3) SHRUB AREAS CODE BOTANICAL/COMMON NAME SIZE CONTAINER QTY 1. plan outline / RA (10) — — — — — /// AB ACHD BASIN FORB MIX/FORB MIX --- SF,417 - AM ACHILLEA MILLEFOLIUM/COMMON YARROW 1 GAL. POT 98 PLANT AT 24"O.C. AGASTACHE NEOMEXICANA/NEW MEXICO -- --------- --------- - ------ --------- -------------------- ----- ------ -a ° a 4 AN HUMMINGBIRD MINT 1 GAL. POT 64 4 :..a PLANT AT 24"O.C. ' R LFESTUCA IDAHOENSIS'SISKIYOU BLUE'/SISKIYOU LU® 0 2 4 8 FS BLUE FESCUE 1 GAL. POT 526 .� - - - — — — — — — — — PLANT ATI8"O.C. Woodland Fort_AP018 NEPETA X FAASSENII'WALKER'S LOW'/WALKER'S NW LOW CATMINT 1 GAL. POT 41 J J J J J PLANT AT 36"O.C. PENSTEMON STRICTUS/ROCKY MOUNTAIN PS PENSTEMON 1 GAL. POT 62 ID Sculpture Woodland Fort Play Feature Community Pool Parking Lot Shrub Planting Detail ° PLANT AT36"O.C. \y�P�EIOF DgyO 4 5 Scale: NTS Scale: 1" = 20' — N W .� r = U-1 589 ' � NDSCAY\ \1�1\ 04/07/2022 Project No.: 120194 Date of Issuance: 04.07.2022 Project Milestone: Permit Set Construction Documents Landscape Details � = L 1 i■ 51 ��o