CC - Engineer Statement Kimley>Morn
March 4, 2022
City of Meridian
33 E Broadway Avenue
Meridian, Idaho 83642
RE: Graycliff Subdivision-Phase 3 Construction Drawings
To Whom it May Concern—
Groundwater monitoring was conducted by Natural Resource Solutions, LLC throughout a period
from 2006-2019. Based on the results of these groundwater readings, the roadway centerline
elevations within the Graycliff Subdivision Phase 3 are designed to be greater than 3' above highest
established groundwater elevation.
Respectfully,
SS\ONAL 4,
OFF' \CENSF� /yF
� F
8670
0 03/04/2022 O
qTF OF \'P
�e�GA IL NA
Abbey Hahn, PE
Kimley-Horn
950 W. Bannock Street, Suite 00 Boise, ID 83702 �: ..