Loading...
CC - Roadway Plan and DetailsPL 34.0' RIGHT OF WAY PL 1.0' 1 1.0' LJ.V 1.5%t 2% .. N HI0K0 0.25% 6" MINUS PIT RUN /� A RIBBON CURB ASPHALTIC PAVEMENT �/��/ %" CRUSHED AGGREGATE BASE TYPICAL PRIVATE STREET SECTION -NTS-o o / \ EP �o � - \ \ 17.94f 6"CRUSHED / // cD 17 AGGREGATE 2" PLANT MIX / / 13 6p p00°�° cd 17.76 7.80 G / 17.61 f 4 �; EOC EOC��. 1° - �� 17.82f BASE TYPE I PAVEMENT / EP MA 17.56 �� ro cJ ASPHALT PATHWAY SECTION �� // 12 7.EP `3,� EP $ SCALE: NTS 1 °17.38 / 17.24� 2 - .-' 17.69t\ EO RIM 4 - �- MA 17.04 17.80 W� 17.82t + / / RIM EOC 17.81 MA MA �� n 11EOC 3 17.5\� - / TBC 11 / 17.03, z� \ oy, g 8 o 6C17.3�� 10 ° ° 1 ° 17.41 5 ,,�� FL TBC2 TBC y�- 001° 17.44 17.79 M7A.76f TBC EOC + 17.65 1 .40 1 .86 / 2.02% TBC 18 OC EXISTING �17.02 1 �� 18.05t / EOC 7 MA ����P 19 18.38 3 8 TBC C3 + / 7/ S 16.68 8 TBC 20 p 3.07% 61 I 1 ING EXIST 5° 19.61 19.33 3 TBC TBC 15 i9.0of / 6 / 21 �� 4 • / �°JA 6 v 18.69 ? / LC_ S 1 6.67 F ° �� S ° 0t / a M / 22 7 � 16 q j9.0 2 / 1 8 �o0, 16.51 23 18.53 5 4 cz FL } 5 24 19 O ec N D s° fpCs TBC 2 BLOCK 1 o N V8. A95t / 1617- ° RI 4 \1 6 1.01% 16.416.09 18.51t EOC/LTBC LP 19.05 MA 4 I 18.65 19.22 TBC s ° 5 1 TBC TBC 1S - II 2.00% 1 18.77 0 O w TBC 0 �1 c, 7 PARKING STALLS -� "'� �0 18.74 s° O 18'x9'=63.00' d •"••................... .......• � 7 + TBC 3 16.45 TBC - - - 17.22 - 3 16.88 i 16.69 TBC 17.95 18.12 18.19 18.37 18.94 o �t 18.79 .18.36t EOC 16.49 TBC \`l'a I TBC c I TBC I TBC I MA RIM s - 4 �+ 0 4 ro TBC oo TBC 4 TBC �I + 27f as as as as ns ns' aS os as as as as as 18.22 16.52 I 1 RIM m ��� RIM 16.86t 17.18±7 17.27t17.38t 118.00tA.� 7.96f 8 16.47 MA MA MA ■ MA MA MA 18.13 16,064 RIM16.10t z � RIM 3.61% RIM MAk� 18.1 o N o N ^ z MA o MA 16.02t ° MA 17.00t 16.53t - „ MA MA 16.97t > J MA MA I- �,.. L-� I Know what's below. Call before you dig NOTE: SEAL -ENGINEER BENCHMARK: WORK CONTAINED WITHIN THESE PLANS SHALL NOT COMMENCE UNTIL AN FOSS\ONAL •PLANNING ENCROA HPE NT PERMIT BEEN IOS ASSUEego IST RF0 B BLAINE AWOMER A. �C VRVEYING SEC SHEET GRADINNo. 17011 CIVIL ENGINEERING ENGINEERING •PUBLIC WORKS DRAWING STATUS: 9�9T oP� FOR AGENCY REVIEW MARK 11 BY DATE APPR, DATE y0ipF FF �y�w Boise, ID 83706, 4355 M E-.1d St-t, Suite 145 . 1-208-593-7555 SCALE ENGINEER REVISIONS COUNTY W N H V: 0 20 40 60 ® KEYNOTES 1. INSTALL 3" ROLLED CURB AND GUTTER PER ACHD SUPPLEMENTAL DRAWING SD-702. 2. INSTALL 5' TRANSITION FROM 6" VERTICAL CURB AND GUTTER TO 3" ROLLED CURB AND GUTTER. 3. INSTALL 6" VERTICAL CURB AND GUTTER PER ACHD SUPPLEMENTAL DRAWING SD-701. 4. INSTALL 6" VERTICAL CURB (NO GUTTER) PER ISPWC SD-701A. 5. INSTALL 5' WIDE ATTACHED CONCRETE SIDEWALK PER ACHD SUPPLEMENTAL DRAWING SD-709. 6. INSTALL 4' VALLEY GUTTER PER ACHD SUPPLEMENTAL DRAWING SD-708. 7. INSTALL 5' WIDE MEANDERING ASPHALT PATHWAY PER SECTION DETAIL THIS SHEET. 8. INSTALL 2' RIBBON CURB PER ACHD SUPPLEMENTAL DRAWING SD-703. 9. INSTALL PEDESTRIAN RAMP WITH NO LANDING PER ACHD SUPPLEMENTAL DRAWING SD-712G. INSTALL TRUNCATED DOMES PER ACHD SUPPLEMENTAL DRAWING SD-712. DOMES SHALL BE RIGID INSERTS WET -SET INTO THE CONCRETE (CONCRETE STAMP AND ADHESIVE MATS NOT ALLOWED) AND SHALL BE COLORED 'TRAFFIC YELLOW. SHEET NOTES A. SEE SHEET C1.1 FOR GENERAL AND ROADWAY NOTES. B. SEE SHEET C1.3 FOR STREET LIGHT AND SIGNAGE PLAN. C. SEE THIS SHEET FOR TYPICAL ROADWAY SECTION. D. SEE SHEET C3.0 FOR LOT GRADING. E. SIDEWALK CROSS SLOPE SHALL NOT EXCEED 2.0%. NO TOLERANCES WILL BE ALLOWED. F. SEE STORM WATER IMPROVEMENT SHEETS FOR ADDITIONAL INFORMATION. G. PRIOR TO PLACEMENT OF ANY PAVEMENT MARKINGS, CONTACT ACHD INSPECTION FOR VERIFICATION OF COMPLIANCE WITH POLICY AND EXISTING MARKINGS. H. CONTRACTOR RESPONSIBLE FOR SIGN INSTALLATION MUST BE BONDED WITH ACHD AND OBTAIN A NO -CHARGE RIGHT OF WAY PERMIT. SHEET NO, CITY OF MERIDIAN, ID C2.o WOODCREST TOWNHOMES SUBDIVISION ROADWAY IMPROVEMENT PLANS FILE NO. ROADWAY PLAN AND DETAILS N1420004