Loading...
CC - Engineer Cert. Alan Tiefenbach Feb 1,2022,4:40 PM(9 days ago) to Joe,me,B I- Kent isin t this short plat also including the remainder of the landscape strip to the northwest?That would be a common lot. You would be combining this into the existing lot where you are building the warehouse.so that would be one building lot. Im pretty sure Joe doesn't care about this since he will review the CZC and already revised the annexation request,but I've copied him so he can respond and if nothing else is required you can include his email as the letter. Landscape plan should include as-built buffer to the northwest(remaining buffer).The remaining landscaping will be part of the CZC. ON THE PHONE LATER STATED NO LANDSCAPE Not necessary to submit engineer drawings or CAD drawings PLAN WOULD BE REQUIRED Please submit that all this is not applicable so no one holds this up. NO NEW STREETS SO NO ENGINEERING CERT Alan Tiefenbach I Current Associate Planner City of Meridian I Community Development Dept. 33 E.Broadway Ave.,Ste.102.Meridian,Idaho 83642 Phone.208-489-05731 Fax:208-489-0571 C�Q(E IDIZ IAN,.- Joe Bongiorno OP Feb 1,2022,4:45 PM(9 days ago) to Alan,me,Bill- Yes-I will comment at the CZC Joe Bongiorno CFI,CFEI Deputy Chief-Fire Marshal Meridian Fire 33 E.Broadway Ave..Ste.210,Meridian.ID 83642 (Direct)208-489-0458(Cell)208-936-9554 CjQ�E IDIZ IAN,�- Dedication-Loyalty-Tradition Alan Tiefenbach Feb 1,2022,4:40 PM(9 days ago) to Joe,me,B I- Kent isin t this short plat also including the remainder of the landscape strip to the northwest?That would be a common lot. You would be combining this into the existing lot where you are building the warehouse.so that would be one building lot. Im pretty sure Joe doesn't care about this since he will review the CZC and already revised the annexation request,but I've copied him so he can respond and if nothing else is required you can include his email as the letter. Landscape plan should include as-built buffer to the northwest(remaining buffer).The remaining landscaping will be part of the CZC. ON THE PHONE LATER STATED NO LANDSCAPE Not necessary to submit engineer drawings or CAD drawings PLAN WOULD BE REQUIRED Please submit that all this is not applicable so no one holds this up. NO NEW STREETS SO NO ENGINEERING CERT Alan Tiefenbach I Current Associate Planner City of Meridian I Community Development Dept. 33 E.Broadway Ave.,Ste.102.Meridian,Idaho 83642 Phone.208-489-05731 Fax:208-489-0571 C�Q(E IDIZ IAN,.- Joe Bongiorno OP Feb 1,2022,4:45 PM(9 days ago) to Alan,me,Bill- Yes-I will comment at the CZC Joe Bongiorno CFI,CFEI Deputy Chief-Fire Marshal Meridian Fire 33 E.Broadway Ave..Ste.210,Meridian.ID 83642 (Direct)208-489-0458(Cell)208-936-9554 CjQ�E IDIZ IAN,�- Dedication-Loyalty-Tradition