Loading...
CC - Engineer Statement Kimley>Morn January 14, 2022 City of Meridian 33 E Broadway Avenue Meridian, Idaho 83642 RE: Graycliff Subdivision-Phase 2 Construction Drawings To Whom it May Concern— Groundwater monitoring was conducted by Natural Resource Solutions, LLC throughout a period from 2006-2019. Based on the results of these groundwater readings, the roadway centerline elevations within the Graycliff Subdivision Phase 2 are designed to be greater than 3' above highest established groundwater elevation. Respectfully, SS\ONAL FNc o�F' \CENS,,R 8670 0 01/14/2022 O qTF OF SOP �e�GA IL V\ ' Abbey Hahn, PE Kimley-Horn 950 W. Bannock Street, Suite 00 Boise, ID 83702 �: ..