PZ - Applicant Data Table re: Schools
West Ada School District Facility Plan Info from Marci Est. # Kids Est. # Kids Est. #
School Enrollment and Design Capacity Horner (WASD) – Phase – Phase 4 Kids --
1
1 2010
School Enrollment Capacity Enroll/Capacity 552 units 177 units 1034
= 83 kids = 27 kids units =
2
355 kids
Barbara Morgan 473 500
STEM Academy
Chaparral 451 700 552/600 (could
Elementary fit 700)
School
Chief Joseph 566 700
School of the
Arts
Peregrine 537 650
Elementary
Meridian Middle 1272 1250 1080/1250
Meridian High 2094 2400 1786/2075
Differences between 2010/2022 (Pattern = Less Intense in 2022)
Residential Units/Density Non-Residential SF Difference in Traffic
3
Generation
45
2010 2022 2010 2022 2010 2022
R40/R15: R15: Retail/Rest: Office: Weekday: Weekday:
64 TH 552 units 362,500 339,400 23,317 9,569
171 apt
Subtotal:235/13.9 Subtotal:552/13.7 Office/Service AM Peak AM Peak
du/ac du/ac Retail/Service: Retail: Hour: Hour:
98,000 160,000 1,844 841
CC: CC:
Subtotal 799 apt Subtotal 177 apt Office: Warehouse: PM Peak PM Peak
6
799/16.44 du/ac 177/10.24 du/ac 1,074,800 411,900 Hour: Hour:
2,107 814
TOTAL: TOTAL: TOTAL Non-
1034 units/15.8 729 TOTAL Non-Res:
du/ac units/12.7du/ac Res: 911,300
1,535,300 SF
1
WASD multiplier = .15. Total number of units for both Phase 1 and Phase 4 = 729 x .15 = 109.35
(rounded to 109).
2
Total number of residential units proposed = 1034 x .15 = 354.85 (rounded to 355 kids).
3
Comparison: Garrett Scott, 2-11-22.
4
Used acres in 2010 vs 2022 zoned acres. Does not account for non-residential in CC.
5
SF based on approved TIS numbers.
6
2010 DA/Staff Report = exceeds the 8-12 du/ac encouraged by TMISAP; encourages future plan to
build on the concept plan to align with the FLUM density targets more closely, which the 2022 plan does.