CC - Storm Drainage Calcs Of THE
LAN D
GROUP
Southridge South Subdivision — Phase 1
Meridian, Idaho
Storm Drain Management & Engineering Drainage Report
Developer
Challenger Development
Meridian, ID 83642
Engineer 4oliAL
The Land Group, Inc. ��� �G1ST 01,,E
462 East Shore Drive, Suite 100 Q
Eagle, Idaho 83616
Contact: Jason Densmer, PE 09 1
Ph: 208-939-4041 � �0
� RTEOF P
October 26, 2021
TLG Project No. 121027 10/2�/2021
462 East Shore Drive, Suite 100, Eagle, Idaho 83616 208.939.4041 - thelandgroupinc.com
Southridge South Subdivision—Phase 1
Meridian, ID
Storm Water Management Report
Report Purpose & Site Description
The purpose of this report is to evaluate and document the post-development storm drain characteristics
of the Southridge South Subdivision—Phase 1 project.This report analyzes the storm drainage conditions
and provides calculations confirming the adequacy of proposed storm drain facilities to meet the project
needs.
The proposed Southridge South Subdivision— Phase 1 project is located located south of Overland Road,
between Linder Rd and Ten Mile, within the City of Meridian, Idaho.The proposed improvements consist
of single family homes with associated site improvements including new access roads, landscaping and
underground utilities.
Geotechnical conditions at the site were evaluated by Site Consulting, LLC and their findings are attached
as Appendix C. The site geotechnical evaluation provides guidance on design and project construction
considerations. Relative to storm drainage systems, recommendations for groundwater and soil
infiltration rates are provided. The geotechnical engineer's recommendations have been incorporated to
the proposed design and systems.
Proposed Systems
Appendix A provides an overview of the proposed drainage basins.
Storm Drainage Routing & Treatment
Within each drainage basin, stormwater runoff is collected from roadways that are sloped to the gutters
along the road edges,which then transport the collected drainage to catch basins.Once inside the system,
stormwater flows through a drainage piping network to sand & grease traps which remove heavy
sediment and light oils prior to discharge into underground seepage beds.The seepage bed provides final
treatment with an 18-inch layer of ASTM C33 filter sand.
Peak Rate of Discharge and Storage Volume
The peak rate of discharge for the roadway drainage systems were calculated using the Ada County
Highway District's published spreadsheets.
Calculation worksheets for peak flow and required storage volume in each drainage basin are provided in
Appendix B.
462 East Shore Drive, Suite 100, Eagle, Idaho 83616 208.939.4041 • thelandgroupinc.com
Southridge South Subdivision—Phase 1
Meridian, ID
Storm Water Management Report
Appendix A
Site Drainage Areas
462 East Shore Drive, Suite 100, Eagle, Idaho 83616 208.939.4041 • thelandgroupinc.com
-1 WIiA0:'-:.THE
-GROUP
I \\ CH 00/2.28 CFS
Q25-1.63 CFS °\
/
I /0100=1.72 CFS
I 025=1.23 CFS T
I — — — — I FACILITY 7b \ O
0100=0s1 CFS- 14513 SF y
yTEMPORARY DRAINAGE SWALE \
I V100-690 CF
— 16- N y FACILITY 7a \
_ V M 2889 SF \ _
Q i 1 D O
N' Q' Q100=0.59CFS
a / Q 025=0.42 CFS I I w+
/ vQ �p � � �/ I ��
� , y
c G
0100=1.41 cfs \ \ V M
41
Qg25=1.01 cfs V Q
Q100=1.25 CFS, QCn
/ \ 025=0.89 CFS � Q � ��
2
G / 0100=1.61 CFS �/ I a
G\ \ \025=0.94 CFS \ / ` Q O ANN
0100 08 CFS y
G `'` !♦ 025=0.78 CFS
\ V R
� ` L 0100=1.69 CFS \
025=1.21 CFS � � FACILITY 8a —
�S� Q10o-1.45CFS 2897 SF
-R,W RAN �— / \ � � \ / Q25=1.04 CFS TEMPORARY DRAINAGE SWALE
pp 0 yP \ ,
V100=230 CF
FACILITY 8b
2912 SF
PAN
TEMPORARV'DRIINN ALE / Q� OFS
V709=605 G�\ N
\ V` Q NOT FOR
FACILITY 1 Q'
AREA 8477 SF
o
G\ \\ CONSTRUCTION
s
Prolecr No.. 121027
r \ G\ \ oaeer Issuance: ####
\ \ Project MIIeMone', ####
\� Drainage Map
I ,\
=a Drainage Map 80 60
g4
Horizontal "Scale: 1 =8D. A p p A
e5�
Southridge South Subdivision—Phase 1
Meridian, ID
Storm Water Management Report
Appendix B
Drainage Calculations
462 East Shore Drive, Suite 100, Eagle, Idaho 83616 208.939.4041 • thelandgroupinc.com
ACHD Calculation Sheet for Finding Peak Discharge/Volume-Rational Method
NOTE:This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology.These
calculations shall establish a minimum requirement.The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted.
rge Rate using th r post-developm
Calculate Post-Development Flows(for pre-development flows,increase number of storage facilities to create new tab)
User input in yellow cells.
1 Project Name Southridge South Phase 1
2 Is area drainage basin map provided? YES
(map must be included with stormwater calculations)
3 Enter Design Storm(100-Year or 25-Year With 100-Year Flood Route) 100
4 Enter number of storage facilities(25 max) 8
Click to Show More Subbasins ❑
Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin
1 Subbasin 2 3 4 5 Subbasin 6 7 8 9 30
5 Area of Drainage Subbasin(SF or Acres) SF 8,477
Acres 0.19
6 Determine the Weighted Runoff Coefficient(C) 0.90
C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avg 0.90
7 Calculate Overland Flow Time of Concentration in Minutes(Tc)or use default 10 user Calculate
min i0 Min. Estimated Runoff Coefficients for Various Surface
Type of Surface Runoff Coefficients"I
8 Determine the average rainfall intensity(i)from IDF Curve based on Tc i 2.58 in/hr Business
Downtown areas 0.70-0.95
9 Calculate the Post-Development peak discharge(ClPeak) QPeA 0.45 Cfs Urban neighborhoods 0.50-0.70
Residential
Single Family 0.35-0.50
10 Calculate total runoff vol(V)(for sizing primary storage) V 605 ft Multi-family 0.60-0.75
V=Ci(Tc=60)Ax3600 Residential(rural) 0.25-0.40
11 Calculate Volume of Runoff Reduction Vrr Apartment Dwelling Areas 0.70
Industrial and Commercial
Enter Percentile Storm I(95th percentile=0.60 in) 95th 0.60 in Light areas 0.80
Enter Runoff Reduction Vol(95th Percentile=0.60-in x Area x C) Vrr 378 W Heavy areas 0.90
12 Detention:Approved Discharge Rate to Surface Waters(if applicable) cfs Parks,cemeteries 0.
Playgrounds 0.20-0.0-0.35
5
Railroad yard areas 0.20-0.40
13 Volume Summary Unimproved areas 0.10-0.30
Surface Storage:Basin Streets
Asphalt 095
Basin Foreba V 61 ft' .
Y Concrete 0.95
Primary Treatment/StorageBasin V 545 ft' Brick 0.95
Subsurface Storage Roofs 0.95
Gravel
Volume Without Sediment Factor(See BMP 20 Tab) V 605 ft'
Fields:Sandy soil Soil Soil Type
Slope A B C D
Flat:0-2% 0.04 0.07 0.11 0.
Average:2-6% 0.09 0.12 0.15 0.
Steep:>6% 0.13 0.18 0.23 0.
Adapted from ASCE
G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.xlsm 10/11/2021,10:19 AM
Version 10.5,November 2018
ACHD Calculation Sheet for Finding Peak Discharge/Volume-Rational Method
NOTE:This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology.These
calculations shall establish a minimum requirement.The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted.
rge Rate using th r post-developm
Calculate Post-Development Flows(for pre-development flows,increase number of storage facilities to create new tab)
User input in yellow cells.
1 Project Name Southridge South Phase 1,Facility 2
2 Is area drainage basin map provided? YES
(map must be included with stormwater calculations)
3 Enter Design Storm(100-Year or 25-Year With 100-Year Flood Route) 100
Click to Show More Subbasins ❑
Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin
1 Subbasin 2 3 4 5 Subbasin 6 7 8 9 10
5 Area of Drainage Subbasin(SF or Acres) SF 47,575 44,282
Acres 2.11
6 Determine the Weighted Runoff Coefficient(C) 0.50 0.50
C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avg 0.50
7 Calculate Overland Flow Time of Concentration in Minutes(Tc)or use default 10 user calculate
min 10 Min. Estimated Runoff Coefficients for Various Surface
Type of Surface Runoff Coefficients"I
8 Determine the average rainfall intensity(i)from IDF Curve based on Tc i 2.58 in hr Business
Downtown areas 0.70-0.95
9 Calculate the Post-Development peak discharge(QPeak) Qpeak 2.72 cfs Urban neighborhoods 0.50-0.70
Residential
Single Family 0.35-0.50
10 Calculate total runoff vol(V)(for sizing primary storage) 644 ft Multi-family 0.60-0.75
V=CI(Tc=60)Ax3600 Residential(rural) 0.25-0.40
11 Calculate Volume of Runoff Reduction Vrr Apartment Dwelling Areas 0.70
Industrial and Commercial
Enter Percentile Storm I(95th percentile=0.60 in) 95th 0.60 in Light areas 0.80
Enter Runoff Reduction Vol(95th Percentile=0.60-in x Area x C) Vrr 2,277 ft. Heavy areas 0.90
12 Detention:Approved Discharge Rate to Surface Waters(if applicable) cis Parks,Cemeteries 0.10-0.25
Playgrounds 0.20-0.35
Railroad yard areas 0.20-0.40
13 Volume Summary Unimproved areas 0.10-0.30
Surface Storage:Basin Streets
Basin Foreba V 364 ft, Asphalt 0.95
Y Concrete 0.95
Primary Treatment/StorageBasin V 3,280 ft' Brick 0.95
Subsurface Storage Roofs 0.95
Volume Without Sediment Factor(See BMP 20 Tab) V 3,644 ft^ Gravel 0.75
Fields:Sandy soil Soil Type
Slope A B C D
Flat:0-2% 0.04 0.07 0.11 0.
Average:2-6% 0.09 0.12 0.15 0.
Steep:>6% 0.13 0.18 0.23 0.
Adapted from ASCE
G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.xlsm 10/11/2021,10:19 AM
Version 10.5,November 2018
ACHD Calculation Sheet for Finding Peak Discharge/Volume-Rational Method
NOTE:This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology.These
calculations shall establish a minimum requirement.The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted.
rge Rate using th r post-developm
Calculate Post-Development Flows(for pre-development flows,increase number of storage facilities to create new tab)
User input in yellow cells.
1 Project Name Southridge South Phase 1,Facility 3
2 Is area drainage basin map provided? YES
(map must be included with stormwater calculations)
3 Enter Design Storm(100-Year or 25-Year With 100-Year Flood Route) 100
Click to Show More Subbasins ❑
Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin
1 Subbasin 2 3 4 5 Subbasin 6 7 8 9 10
5 Area of Drainage Subbasin(SF or Acres) SF 76,980 58,074
Acres 3.10
6 Determine the Weighted Runoff Coefficient(C) 0.50 0.50
C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avg 0.50
7 Calculate Overland Flow Time of Concentration in Minutes(Tc)or use default 10 user calculate
min 10 Min. Estimated Runoff Coefficients for Various Surface
Type of Surface Runoff Coefficients"I
8 Determine the average rainfall intensity(i)from IDF Curve based on Tc i 2.58 in hr Business
Downtown areas 0.70-0.95
- 4.00
9 Calculate the Post-Development peak discharge(QPeak) Q, cfs Urban neighborhoods 0.50-0.70
Residential
Single Family 0.35-0.50
10 Calculate total runoff vol(V)(for sizing primary storage) V 5,358 ft Multi-family 0.60-0.75
V=CI(Tc=60)Ax3600 Residential(rural) 0.25-0.40
11 Calculate Volume of Runoff Reduction Vrr Apartment Dwelling Areas 0.70
Industrial and Commercial
Enter Percentile Storm I(95th percentile=0.60 in) 95th 0.60 in Light areas 0.80
Enter Runoff Reduction Vol(95th Percentile=0.60-in x Area x C) Vr, 3,348 ft' Heavy areas 0.90
12 Detention:Approved Discharge Rate to Surface Waters(if applicable) cis Parks,Cemeteries 0.10-0.25
Playgrounds 0.20-0.35
Railroad yard areas 0.20-0.40
13 Volume Summary Unimproved areas 0.10-0.30
Surface Storage:Basin Streets
Basin Foreba V 536 ft` Asphalt 0.95
Y Concrete 0.95
Primary Treatment/StorageBasin V 4,822 ft' Brick 0.95
Subsurface Storage Roofs 0.95
Volume Without Sediment Factor(See BMP 20 Tab) V 5,358 ft' Gravel 0.75
Fields:Sandy soil Soil Type
Slope A B C D
Flat:0-2% 0.04 0.07 0.11 0.
Average:2-6% 0.09 0.12 0.15 0.
Steep:>6% 0.13 0.18 0.23 0.
Adapted from ASCE
G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.xlsm 10/11/2021,10:19 AM
Version 10.5,November 2018
ACHD Calculation Sheet for Finding Peak Discharge/Volume-Rational Method
NOTE:This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology.These
calculations shall establish a minimum requirement.The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted.
rge Rate using th r post-developm
Calculate Post-Development Flows(for pre-development flows,increase number of storage facilities to create new tab)
User input in yellow cells.
1 Project Name Southridge South Phase 1,Facility 4
2 Is area drainage basin map provided? YES
(map must be included with stormwater calculations)
3 Enter Design Storm(100-Year or 25-Year With 100-Year Flood Route) 100
Click to Show More Subbasins ❑
Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin
1 Subbasin 2 3 4 5 Subbasin 6 7 8 9 10
5 Area of Drainage Subbasin(SF or Acres) SF 20,644 19,931
Acres 0.93
6 Determine the Weighted Runoff Coefficient(C) 0.50 0.50
C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avg 0.50
7 Calculate Overland Flow Time of Concentration in Minutes(Tc)or use default 10 user calculate
min 10 Min. Estimated Runoff Coefficients for Various Surface
Type of Surface Runoff Coefficients"I
8 Determine the average rainfall intensity(i)from IDF Curve based on Tc i 2.58 in hr Business
Downtown areas 0.70-0.95
9 Calculate the Post-Development peak discharge(QPeak) Q,-, EN cfs Urban neighborhoods 0.50-0.70
Residential
Single Family 0.35-0.50
10 Calculate total runoff vol(V)(for sizing primary storage) V 1,610 ft Multi-family 0.60-0.75
V=CI(Tc=60)Ax3600 Residential(rural) 0.25-0.40
11 Calculate Volume of Runoff Reduction Vrr Apartment Dwelling Areas 0.70
Industrial and Commercial
Enter Percentile Storm I(95th percentile=0.60 in) 95th 0.60 in Light areas 0.80
Enter Runoff Reduction Vol(95th Percentile=0.60-in x Area x C) Vrr 1,006 ft' Heavy areas 0.90
12 Detention:Approved Discharge Rate to Surface Waters(if applicable) cis Parks,Cemeteries 0.10-0.25
Playgrounds 0.20-0.35
Railroad yard areas 0.20-0.40
13 Volume Summary Unimproved areas 0.10-0.30
Surface Storage:Basin Streets
Basin Foreba V 161 ft` Asphalt 0.95
Y Concrete 0.95
Primary Treatment/StorageBasin V 1,449 ft' Brick 0.95
Subsurface Storage Roofs 0.95
Volume Without Sediment Factor(See BMP 20 Tab) V 1,610 ft' Gravel 0.75
Fields:Sandy soil Soil Type
Slope A B C D
Flat:0-2% 0.04 0.07 0.11 0.
Average:2-6% 0.09 0.12 0.15 0.
Steep:>6% 0.13 0.18 0.23 0.
Adapted from ASCE
G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.xlsm 10/11/2021,10:19 AM
Version 10.5,November 2018
ACHD Calculation Sheet for Finding Peak Discharge/Volume-Rational Method
NOTE:This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology.These
calculations shall establish a minimum requirement.The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted.
rge Rate using th r post-developm
Calculate Post-Development Flows(for pre-development flows,increase number of storage facilities to create new tab)
User input in yellow cells.
1 Project Name Southridge South Phase 1,Facility 5
2 Is area drainage basin map provided? YES
(map must be included with stormwater calculations)
3 Enter Design Storm(100-Year or 25-Year With 100-Year Flood Route) 100
Click to Show More Subbasins ❑
Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin
1 Subbasin 2 3 4 5 Subbasin 6 7 8 9 10
5 Area of Drainage Subbasin(SF or Acres) SF 42,144 36,621
Acres 1.81
6 Determine the Weighted Runoff Coefficient(C) 0.50 0.50
C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avg 0.50
7 Calculate Overland Flow Time of Concentration in Minutes(Tc)or use default 10 user calculate
min 10 Min. Estimated Runoff Coefficients for Various Surface
Type of Surface Runoff Coefficients"I
8 Determine the average rainfall intensity(i)from IDF Curve based on Tc i 2.58 in hr Business
Downtown areas 0.70-0.95
9 Calculate the Post-Development peak discharge(QPeak) Qpeak .83 cfs Urban neighborhoods 0.50-0.70
Residential
Single Family 0.35-0.50
10 Calculate total runoff vol(V)(for sizing primary storage) ft Multi-family 0.60-0.75
V=CI(Tc=60)Ax3600 Residential(rural) 0.25-0.40
11 Calculate Volume of Runoff Reduction Vrr Apartment Dwelling Areas 0.70
Industrial and Commercial
Enter Percentile Storm I(95th percentile=0.60 in) 95th 0.60 in Light areas 0.80
Enter Runoff Reduction Vol(95th Percentile=0.60-in x Area x C) Vrr 1,953 ft' Heavy areas 0.90
12 Detention:Approved Discharge Rate to Surface Waters(if applicable) cis Parks,Cemeteries 0.10-0.25
Playgrounds 0.20-0.35
Railroad yard areas 0.20-0.40
13 Volume Summary Unimproved areas 0.10-0.30
Surface Storage:Basin Streets
Basin Foreba V 312 ft` Asphalt 0.95
Y Concrete 0.95
Primary Treatment/StorageBasin V 2,812 ft' Brick 0.95
Subsurface Storage Roofs 0.95
Volume Without Sediment Factor(See BMP 20 Tab) V 3,125 ft, Gravel 0.75
Fields:Sandy soil Soil Type
Slope A B C D
Flat:0-2% 0.04 0.07 0.11 O.
Average:2-6% 0.09 0.12 0.15 O.
Steep:>6% 0.13 0.18 0.23 O.
Adapted from ASCE
G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.xlsm 10/11/2021,10:19 AM
Version 10.5,November 2018
ACHD Calculation Sheet for Finding Peak Discharge/Volume-Rational Method
NOTE:This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology.These
calculations shall establish a minimum requirement.The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted.
rge Rate using th r post-developm
Calculate Post-Development Flows(for pre-development flows,increase number of storage facilities to create new tab)
User input in yellow cells.
1 Project Name Southridge South Phase 1,Facility 6
2 Is area drainage basin map provided? YES
(map must be included with stormwater calculations)
3 Enter Design Storm(100-Year or 25-Year With 100-Year Flood Route) 100
Click to Show More Subbasins ❑
Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin
1 Subbasin 2 3 4 5 Subbasin 6 7 8 9 10
5 Area of Drainage Subbasin(SF or Acres) SF 57,020 48,874
Acres 2.43
6 Determine the Weighted Runoff Coefficient(C) 0.50 0.50
C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avg 0.50
7 Calculate Overland Flow Time of Concentration in Minutes(Tc)or use default 10 user calculate
min 10 Min. Estimated Runoff Coefficients for Various Surface
Type of Surface Runoff Coefficients"I
8 Determine the average rainfall intensity(i)from IDF Curve based on Tc i 2.58 in hr Business
Downtown areas 0.70-0.95
9 Calculate the Post-Development peak discharge(QPeak) QPe-1 3.14 cfs Urban neighborhoods 0.50-0.70
IF Residential
Single Family 0.35-0.50
10 Calculate total runoff vol(V)(for sizing primary storage) V 4,201 ft Multi-family 0.60-0.75
V=CI(Tc=60)Ax3600 Residential(rural) 0.25-0.40
11 Calculate Volume of Runoff Reduction Vrr Apartment Dwelling Areas 0.70
Industrial and Commercial
Enter Percentile Storm I(95th percentile=0.60 in) 95th 0.60 in Light areas 0.80
Enter Runoff Reduction Vol(95th Percentile=0.60-in x Area x C) Vrr 2,625 ft' Heavy areas 0.90
12 Detention:Approved Discharge Rate to Surface Waters(if applicable) cis Parks,Cemeteries 0.10-0.25
Playgrounds 0.20-0.35
Railroad yard areas 0.20-0.40
13 Volume Summary Unimproved areas 0.10-0.30
Surface Storage:Basin Streets
Basin Foreba V 420 ft` Asphalt 0.95
Y Concrete 0.95
Primary Treatment/StorageBasin V 3,781 ft' Brick 0.95
Subsurface Storage Roofs 0.95
Volume Without Sediment Factor(See BMP 20 Tab) V 4,201 ft' Gravel 0.75
Fields:Sandy soil Soil Type
Slope A B C D
Flat:0-2% 0.04 0.07 0.11 0.
Average:2-6% 0.09 0.12 0.15 0.
Steep:>6% 0.13 0.18 0.23 0.
Adapted from ASCE
G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.xlsm 10/11/2021,10:19 AM
Version 10.5,November 2018
ACHD Calculation Sheet for Finding Peak Discharge/Volume-Rational Method
NOTE:This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology.These
calculations shall establish a minimum requirement.The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted.
rge Rate using th r post-developm
Calculate Post-Development Flows(for pre-development flows,increase number of storage facilities to create new tab)
User input in yellow cells.
1 Project Name Southridge South Phase 1,Facility 7
2 Is area drainage basin map provided? YES
(map must be included with stormwater calculations)
3 Enter Design Storm(100-Year or 25-Year With 100-Year Flood Route) 100
Click to Show More Subbasins ❑
Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin
1 Subbasin 2 3 4 5 Subbasin 6 7 8 9 10
5 Area of Drainage Subbasin(SF or Acres) SF 14,513 2,889
Acres 0.40
6 Determine the Weighted Runoff Coefficient(C) 0.50 0.50
C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avg 0.50
7 Calculate Overland Flow Time of Concentration in Minutes(Tc)or use default 10 user calculate
min 10 Min. Estimated Runoff Coefficients for Various Surface
Type of Surface Runoff Coefficients"I
8 Determine the average rainfall intensity(i)from IDF Curve based on Tc #95th
F0.6Oin
Business
Downtown areas 0.70-0.95
9 Calculate the Post-Development peak discharge(QPeak) Urban neighborhoods 0.50-0.70
Residential
Single Family 0.35-0.50
10 Calculate total runoffvol(V)(for sizing primary storage) Multi-family 0.60-0.75
V=CI(Tc=60)Ax3600 Residential(rural) 0.25-0.40
11 Calculate Volume of Runoff Reduction Vrr Apartment Dwelling Areas 0.70
Industrial and Commercial
Enter Percentile Storm I(95th percentile=0.60 in) Light areas 0.80
Enter Runoff Reduction Vol(95th Percentile=0.60-in x Area x C) Vn 431 ft' Heavy areas 0.90
12 Detention:Approved Discharge Rate to Surface Waters(if applicable) cis Parks,Cemeteries 0.10-0.25
Playgrounds 0.20-0.35
Railroad yard areas 0.20-0.40
13 Volume Summary Unimproved areas 0.10-0.30
Surface Storage:Basin Streets
Basin Foreba V 69 ft` Asphalt 0.95
Y Concrete 0.95
Primary Treatment/StorageBasin V 621 ft' Brick 0.95
Subsurface Storage Roofs 0.95
Volume Without Sediment Factor(See BMP 20 Tab) V 690 ft' Gravel 0.75
Fields:Sandy soil Soil Type
Slope A B C D
Flat:0-2% 0.04 0.07 0.11 O.
Average:2-6% 0.09 0.12 0.15 O.
Steep:>6% 0.13 0.18 0.23 O.
Adapted from ASCE
G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.xlsm 10/11/2021,10:19 AM
Version 10.5,November 2018
ACHD Calculation Sheet for Finding Peak Discharge/Volume-Rational Method
NOTE:This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology.These
calculations shall establish a minimum requirement.The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted.
rge Rate using th r post-developm
Calculate Post-Development Flows(for pre-development flows,increase number of storage facilities to create new tab)
User input in yellow cells.
1 Project Name Southridge South Phase 1,Facility 8
2 Is area drainage basin map provided? YES
(map must be included with stormwater calculations)
3 Enter Design Storm(100-Year or 25-Year With 100-Year Flood Route) 100
Click to Show More Subbasins ❑
Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin
1 Subbasin 2 3 4 5 Subbasin 6 7 8 9 10
5 Area of Drainage Subbasin(SF or Acres) SF 2,897 2,912
Acres 0.13
6 Determine the Weighted Runoff Coefficient(C) 0.50 0.50
C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avg 0.50
7 Calculate Overland Flow Time of Concentration in Minutes(Tc)or use default 10 user calculate
min 10 Min. Estimated Runoff Coefficients for Various Surface
Type of Surface Runoff Coefficients"I
8 Determine the average rainfall intensity(i)from IDF Curve based on Tc i 2.58 n hr Business
Downtown areas 0.70-0.95
9 Calculate the Post-Development peak discharge(QPeak) Qpeak 0.17 cfs Urban neighborhoods 0.50-0.70
Residential
Single Family 0.35-0.50
10 Calculate total runoff vol(V)(for sizing primary storage) 230 ft Multi-family 0.60-0.75
V=CI(Tc=60)Ax3600 Residential(rural) 0.25-0.40
11 Calculate Volume of Runoff Reduction Vrr Apartment Dwelling Areas 0.70
Industrial and Commercial
Enter Percentile Storm I(95th percentile=0.60 in) 95th 0.60 in Light areas 0.80
Enter Runoff Reduction Vol(95th Percentile=0.60-in x Area x C) Vrr 144 ft' Heavy areas 0.90
12 Detention:Approved Discharge Rate to Surface Waters(if applicable) cis Parks,Cemeteries 0.10-0.25
Playgrounds 0.20-0.35
Railroad yard areas 0.20-0.40
13 Volume Summary Unimproved areas 0.10-0.30
Surface Storage:Basin Streets
Basin Foreba V 23 ft` Asphalt 0.95
Y Concrete 0.95
Primary Treatment/StorageBasin V 207 ft' Brick 0.95
Subsurface Storage Roofs 0.95
Volume Without Sediment Factor(See BMP 20 Tab) V 230 ft' Gravel 0.75
Fields:Sandy soil Soil Type
Slope A B C D
Flat:0-2% 0.04 0.07 0.11 0.
Average:2-6% 0.09 0.12 0.15 0.
Steep:>6% 0.13 0.18 0.23 0.
Adapted from ASCE
G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.xlsm 10/11/2021,10:19 AM
Version 10.5,November 2018
ACHD Calculation Sheet for Sizing Basins
NOTE:This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's
calculation methodology.These calculations shall establish a minimum requirement.The Engineer's methodology must result in facilities that meet or
exceed these calculations in order to be accepted.
User input in yellow cells.
1 Project Name Southridge South Phase 1
2 Enter number of Basins(25 max) 3
3 Number of Cells(Forebay+Primary=2,Primary Only=1) 1
4 Design Storm 100 Link to: Qv
5 Weighted Runoff Coefficient C 0.90 QV2 n
QV3
6 Area A(Acres) 0.19 acres Q,V4
7 Approved Discharge Rate(if applicable) 0.00 cfs QV5
QV6
8 1-Basin Forebay V 605 it Q•v7
va
Toggle between Forebay and Primary Basin,enter data and print for each
SideSkpeZ Sb°E Sib spsz
n. ^ D. Dmv
e; w� �—� w
y
rks4°z Rt
Forebay
9 Select Forebay Shape 3-Rectangle
10 Width of Forebay Bottom W 33.0 it
11 Length of Forebay Bottom L 40.0 ft
12 Side Slopes(H:1) H:1 4.00
13 Enter Bottom Elevation 2684.88 ft
14 Enter Top Bank Elevation 2686.38 ft
15 Enter Water Surface Elevation(WSE) 2685.88 ft
16 Distance Between Forebay and Primary Basin(blank if na) 0.00 ft
17 Enter Elevation Berm 0.00 ft
18 Enter High Groundwater Elevation 0.00 ft
19 Min.Freeboard Requirement 0.50
20 Freeboard Provided
21 Infiltration Area for Forebay Infiltration? 6.00 in/hr Note:infiltration required if
Design Infiltration Rate,Enter 0for no infiltration bottom sloped%or0 outflow
22 Infiltration Area for Forebay As-d 330 ftz
Enter 0 for no infiltration
23 Adjusted Storage Required
Storm Duration !total Q Runoff Perc Vol Pre-Dev Total Max Vol
Vol Discharge Discharge Reqd
Min Hr in/hr cfs ft' ft' ft3 ft' ft
60 1.00 0.96 0.17 605 165 0 165 10
24 Depth-Storage Relationship:
Saved Surface
Basin Basin Surface Surface Area A at Volume
Saved Side Slope Width at Length at Area A at Area A at Stage(ff) Below
Stage(ft) New Stage(it) (H:V) Stage(ft) Stage(ft) Stage(ft) Stage(ft) OVERIDE Stage(ft)
2684.88 2684.88 4.000 33.0 40.0 1,320 0
2684.88 4.000 33.0 40.0 1,320
2685.88 1 4.000 1 41.0 48.0 1 1,968 1 1,644
1.00 ft depth for storage STORAGE OK
25 Does forebay have capacity? VES
26 Time to drain forebay 3.3 hours
90%volume in 48-hours minimum OK
G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.xism 10/11/2021,10:19 AM
Version 10.0,May 2018
ACHD Calculation Sheet for Sizing Basins
NOTE:This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's
calculation methodology.These calculations shall establish a minimum requirement.The Engineer's methodology must result in facilities that meet or
exceed these calculations in order to be accepted.
User input in yellow cells.
1 Project Name Southridge South Phase 1,Facility 7,Pond 2
2 Enter number of Basins(25 max) 3
3 Number of Cells(Forebay+Primary=2,Primary Only=1) 1
4 Design Storm 100 Link to: Qv n
5 Weighted Runoff Coefficient C 0.50 QV2
QV3
6 Area A(Acres) 0.40 acres Q,V4
7 Approved Discharge Rate(if applicable) 0.00 cfs QV5
QV6
8 1-Basin Forebay V 690 ft3 Qv7�i
va
Toggle between Forebay and Primary Basin,enter data and print for each
*5.*s,hPZ
�°ESib spsz
Ay Rt
Forebay
9 Select Forebay Shape 3-Rectangle
10 Width of Forebay Bottom W 33.0 it
11 Length of Forebay Bottom L 40.0 ft
12 Side Slopes(H:1) H:1 4.00
13 Enter Bottom Elevation 2664.87 ft
14 Enter Top Bank Elevation 2666.37 ft
15 Enter Water Surface Elevation(WSE) 2665.87 ft
16 Distance Between Forebay and Primary Basin(blank if na) 0.00 ft
17 Enter Elevation Berm 0.00 ft
18 Enter High Groundwater Elevation 0.00 ft
19 Min.Freeboard Requirement 0.50
20 Freeboard Provided
21 Infiltration Area for Forebay Infiltration? 6.00 in/hr Note:infiltration required if
Design Infiltration Rate,Enter 0for no infiltration bottom sloped%or0 outflow
22 Infiltration Area for Forebay As-d 1,320 ftz
Enter 0 for no infiltration
23 Adjusted Storage Required
260
m Duration !total Q Runoff Perc Vol Pre-Dev Total Max Vol
Vol Discharge Discharge Reqd
Hr in/hr cfs ft3 ft3 ft3 ft3 ft3 1.00 0.96 0.19 690 660 0 660 30
24 Depth-Storage Relationship:
Saved Surface
Basin Basin Surface Surface Area A at Volume
Saved Side Slope Width at Length at Area A at Area A at Stage(ff) Below
Stage(ft) New Stage(it) (H:V) Stage(ft) Stage(ft) Stage(ft) Stage(ft) OVERIDE Stage(ft)
2664.87 2664.87 4.000 33.0 40.0 1,320 0
2665.87 4.000 41.0 48.0 1,968 1,644
1.00 ft depth for storage STORAGE OK
25 Does forebay have capacity? VES
26 Time to drain forebay 0.9 hours
90%volume in 48-hours minimum OK
G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.xism 10/11/2021,10:19 AM
Version 10.0,May 2018
ACHD Calculation Sheet for Sizing Basins
NOTE:This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's
calculation methodology.These calculations shall establish a minimum requirement.The Engineer's methodology must result in facilities that meet or
exceed these calculations in order to be accepted.
User input in yellow cells.
1 Project Name Southridge South Phase 1,Facility 8,Pond 3
2 Enter number of Basins(25 max) 3
3 Number of Cells(Forebay+Primary=2,Primary Only=1) 1
4 Design Storm 100 Link to: Qv n
5 Weighted Runoff Coefficient C 0.50 QV2
QV3
6 Area A(Acres) 0.13 acres Q,V4
7 Approved Discharge Rate(if applicable) 0.00 cfs QV5
QV6
8 1-Basin Forebay V 230 ft3 Qv7
va
Toggle between Forebay and Primary Basin,enter data and print for each
*5.*s,hPZ
�°ESib spsz
Ay Rt
Forebay
9 Select Forebay Shape 3-Rectangle
10 Width of Forebay Bottom W 33.0 it
11 Length of Forebay Bottom L 20.0 ft
12 Side Slopes(H:1) H:1 4.00
13 Enter Bottom Elevation 2667.35 ft
14 Enter Top Bank Elevation 2668.85 ft
15 Enter Water Surface Elevation(WSE) 2668.35 ft
16 Distance Between Forebay and Primary Basin(blank if na) 0.00 ft
17 Enter Elevation Berm 0.00 ft
18 Enter High Groundwater Elevation 0.00 ft
19 Min.Freeboard Requirement 0.50
20 Freeboard Provided J
21 Infiltration Area for Forebay Infiltration? 6.00 in/hr Note:infiltration required if
Design Infiltration Rate,Enter 0for no infiltration bottom sloped%or0 outflow
22 Infiltration Area for Forebay As-d 660 ftz
Enter 0 for no infiltration
23 Adjusted Storage Required
260
m Duration !total Q Runoff Perc Vol Pre-Dev Total Max Vol
Vol Discharge Discharge Reqd
Hr in/hr cfs ft3 ft3 ft3 ft3 ft
1.00 0.96 0.06 230 330 0 330 0
24 Depth-Storage Relationship:
Saved Surface
Basin Basin Surface Surface Area A at Volume
Saved Side Slope Width at Length at Area A at Area A at Stage(ff) Below
Stage(ft) New Stage(it) (H:V) Stage(ft) Stage(ft) Stage(ft) Stage(ft) OVERIDE Stage(ft)
2667.35 2667.35 4.000 33.0 20.0 660 0
2668.35 4.000 41.0 28.0 1,148 904
1.00 ft depth for storage STORAGE OK
25 Does forebay have capacity? YES
26 Time to drain forebay 0.6 hours
90%volume in 48-hours minimum OK
G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.xism 10/11/2021,10:19 AM
Version 10.0,May 2018
ACHD Calculation Sheet for Sand/Grease Traps
NOTE:This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the
Engineer's calculation methodology. These calculations shall establish a minimum requirement.The Engineer's methodology must
result in facilities that meet or exceed these calculations in order to be accepted.
User input in yellow cells.
1 Project Name Southridge South Phase 1
2 Enter number of Sand/Grease Traps(25 max) 5
Number of Peak Flow Baffle Throat Velocity Is the
Vault Size Spacing width Area(ftZ) 0.5 fps Velocity
S/G Traps Q-cfs inch inch max. ok?
1000 G 1 2.72 18 48 6.00 0.45
Reference for Throat widths(inch)
ADS
Boise Lar-ken WQU,
Vault BMP 16
1000 G 48.0 50.5 n/a
1500 G 60.0 61.5 n/a
WQU1000 n/a n/a 60
WQU1500 n/a n/a 60
G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.xlsm 10/11/2021, 10:19 AM
Version 10.0, May 2018
ACHD Calculation Sheet for Sand/Grease Traps
NOTE:This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the
Engineer's calculation methodology. These calculations shall establish a minimum requirement.The Engineer's methodology must
result in facilities that meet or exceed these calculations in order to be accepted.
User input in yellow cells.
1 Project Name Southridge South Phase 1,Tank 2
2 Enter number of Sand/Grease Traps(25 max) 5
Number of Peak Flow Baffle Throat Velocity Is the
Vault Size Spacing width Area(ftZ) 0.5 fps Velocity
S/G Traps Q-cfs inch inch max. ok?
1500 G 1 4 20 60 8.33 0.48
Reference for Throat widths(inch)
ADS
Boise Lar-ken WQU,
Vault BMP 16
1000 G 48.0 50.5 n/a
1500 G 60.0 61.5 n/a
WQU1000 n/a n/a 60
WQU1500 n/a n/a 60
G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.xlsm 10/11/2021, 10:19 AM
Version 10.0, May 2018
ACHD Calculation Sheet for Sand/Grease Traps
NOTE:This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the
Engineer's calculation methodology. These calculations shall establish a minimum requirement.The Engineer's methodology must
result in facilities that meet or exceed these calculations in order to be accepted.
User input in yellow cells.
1 Project Name Southridge South Phase 1,Tank 3
2 Enter number of Sand/Grease Traps(25 max) 5
Number of Peak Flow Baffle Throat Velocity Is the
Vault Size Spacing width Area(ftZ) 0.5 fps Velocity
S/G Traps Q-cfs inch inch max. ok?
1000 G 1 1.2 18 48 6.00 0.20
Reference for Throat widths(inch)
ADS
Boise Lar-ken WQU,
Vault BMP 16
1000 G 48.0 50.5 n/a
1500 G 60.0 61.5 n/a
WQU1000 n/a n/a 60
WQU1500 n/a n/a 60
G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.xlsm 10/11/2021, 10:19 AM
Version 10.0, May 2018
ACHD Calculation Sheet for Sand/Grease Traps
NOTE:This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the
Engineer's calculation methodology. These calculations shall establish a minimum requirement.The Engineer's methodology must
result in facilities that meet or exceed these calculations in order to be accepted.
User input in yellow cells.
1 Project Name Southridge South Phase 1,Tank 4
2 Enter number of Sand/Grease Traps(25 max) 5
Number of Peak Flow Baffle Throat Velocity Is the
Vault Size Spacing width Area(ftZ) 0.5 fps Velocity
S/G Traps Q-cfs inch inch max. ok?
1000 G 1 1.25 18 48 6.00 0.21
Reference for Throat widths(inch)
ADS
Boise Lar-ken WQU,
Vault BMP 16
1000 G 48.0 50.5 n/a
1500 G 60.0 61.5 n/a
WQU1000 n/a n/a 60
WQU1500 n/a n/a 60
G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.xlsm 10/11/2021, 10:19 AM
Version 10.0, May 2018
ACHD Calculation Sheet for Sand/Grease Traps
NOTE:This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the
Engineer's calculation methodology. These calculations shall establish a minimum requirement.The Engineer's methodology must
result in facilities that meet or exceed these calculations in order to be accepted.
User input in yellow cells.
1 Project Name Southridge South Phase 1,Tank 5
2 Enter number of Sand/Grease Traps(25 max) 5
Number of Peak Flow Baffle Throat Velocity Is the
Vault Size Spacing width Area(ftZ) 0.5 fps Velocity
S/G Traps Q-cfs inch inch max. ok?
1000 G 1 3.14 20 48 6.67 0.47
Reference for Throat widths(inch)
ADS
Boise Lar-ken WQU,
Vault BMP 16
1000 G 48.0 50.5 n/a
1500 G 60.0 61.5 n/a
WQU1000 n/a n/a 60
WQU1500 n/a n/a 60
G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.xlsm 10/11/2021, 10:19 AM
Version 10.0, May 2018
ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers
NOTE:This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the
Engineer's calculation methodology. These calculations shall establish a minimum requirement.The Engineer's methodology must result in
facilities that meet or exceed these calculations in order to be accepted.
Note this spreadsheet pulls information from the"Peak QV"tab
Calculate Post-Development Flows(for pre-development flows,increase number of storage facilities to create new tab)
User input in yellow cells.
1 Project Name Southridge South Phase 1,Facility 2
2 Enter number of Seepage Beds(25 max) 5
3 Design Storm 100
4 Weighted Runoff Coefficient C 0.50 Link to: Qv
5 Area A(Acres) 2.11 acres Q,v3�
6 Approved discharge rate(if applicable) 0.00 cis Qva
Qvs
7 Is Seepage Bed in Common Lot? No V 4,555 ft3 25%Sediment
8 Set Total Design Width of All Drain Rock W 10.0 ft
9 Set Total Design Depth of All Drain Rock D 11.5 ft
Rock Only,Do Not Include Filter Sand Depth or Cover
10 Void Ratio of Drain Rock Voids 0.35
0.4 for 1.5"-2"drain rock and 3/4"Chips
11 Design Infiltration Rate(8 in/hr max) Perc 6.00 in/hr
12 Size of WQ Perf Pipe(Pert 1800) Dia pipe 18 in
13 Size of Overflow Perf Pipe(Perfs 3600),READ if Q100>3.3 cfs in
14 Calculate Total Storage per Foot Spf 45.5 ft3/ft
15 Calculate Design Length L 100 ft
Override Value Required for Chambers
16 Variable Infiltration Window L SWL 100 ft
17 Variable Infiltration Window W SWW 10.0 ft
18 Time to Drain 8.2 hours
90%volume in 48-hours minimum
19 Length of WQ&Overflow Perf Pipes 100 ft
20 Perf Pipe Checks.Qperf>=Qpeak;
where Qperf=CdxAxV(2xgxH)
Optional Storage Chambers
Note:This assumes chambers are organized in a rectangular layout.
1-StormTech,
1 Type of Chambers SC740
2 Volume to Store V 0 ft3
3 Installed Chamber Width Cw 4.25 ft
Installed Chamber Depth Cd 2.50 ft
Installed Chamber Height Ch 7.12 ft
4 Chamber Void Factor
5 Chamber Storage Volume,Without Rock,Per Manuf 45.90 ft3/Unit
6 Chamber Storage Volume,With Rock,Per Manuf 74.90 ft3/Unit
7 Total Number of Units Required 0 ea
8 Area of Infiltration Aperc ftz
9 Volume Infiltration Vperc 0 ft3/hr
10 Time to Drain hours
90%volume in 48-hours minimum
G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.xism 10/11/2021,10:22 AM
Version 10.0,May 2018
ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers
NOTE:This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the
Engineer's calculation methodology. These calculations shall establish a minimum requirement.The Engineer's methodology must result in
facilities that meet or exceed these calculations in order to be accepted.
Note this spreadsheet pulls information from the"Peak QV"tab
Calculate Post-Development Flows(for pre-development flows,increase number of storage facilities to create new tab)
User input in yellow cells.
1 Project Name Southridge South Phase 1,Facility 3,Bed 2
2 Enter number of Seepage Beds(25 max) 5
3 Design Storm 100
4 Weighted Runoff Coefficient C 0.50 Link to: Qv
5 Area A(Acres) 3.10 acres lqvl�
6 Approved discharge rate(if applicable) 0.00 cfs Qva
Qvs
7 Is Seepage Bed in Common Lot? No V 6,697 ft3 25%Sediment
8 Set Total Design Width of All Drain Rock W 10.0 ft
9 Set Total Design Depth of All Drain Rock D 11.0 ft
Rock Only,Do Not Include Filter Sand Depth or Cover
10 Void Ratio of Drain Rock Voids 0.35
0.4 for 1.5"-2"drain rock and 3/4"Chips
11 Design Infiltration Rate(8 in/hr max) Perc 6.00 in/hr
12 Size of WQ Perf Pipe(Pert 1800) Dia pipe 18 in
13 Size of Overflow Perf Pipe(Perfs 3600),READ if Q100>3.3 cfs in
14 Calculate Total Storage per Foot Spf 43.8 ft3/ft
15 Calculate Design Length L 153 ft
Override Value Required for Chambers
16 Variable Infiltration Window L SWL 153 ft
17 Variable Infiltration Window W SWW 10.0 ft
18 Time to Drain 7.9 hours
90%volume in 48-hours minimum
19 Length of WQ&Overflow Perf Pipes 153 ft
20 Perf Pipe Checks.Qperf>=Qpeak;
where Qperf=CdxAxV(2xgxH)
Optional Storage Chambers
Note:This assumes chambers are organized in a rectangular layout.
1-StormTech,
1 Type of Chambers SC740
2 Volume to Store V 0 ft3
3 Installed Chamber Width Cw 4.25 ft
Installed Chamber Depth Cd 2.50 ft
Installed Chamber Height Ch 7.12 ft
4 Chamber Void Factor
5 Chamber Storage Volume,Without Rock,Per Manuf 45.90 ft3/Unit
6 Chamber Storage Volume,With Rock,Per Manuf 74.90 ft3/Unit
7 Total Number of Units Required 0 ea
8 Area of Infiltration Aperc ftz
9 Volume Infiltration Vperc 0 ft3/hr
10 Time to Drain hours
90%volume in 48-hours minimum
G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.xism 10/11/2021,10:22 AM
Version 10.0,May 2018
ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers
NOTE:This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the
Engineer's calculation methodology. These calculations shall establish a minimum requirement.The Engineer's methodology must result in
facilities that meet or exceed these calculations in order to be accepted.
Note this spreadsheet pulls information from the"Peak QV"tab
Calculate Post-Development Flows(for pre-development flows,increase number of storage facilities to create new tab)
User input in yellow cells.
1 Project Name Southridge South Phase 1,Facility 4,Bed 3
2 Enter number of Seepage Beds(25 max) 5
3 Design Storm 100
4 Weighted Runoff Coefficient C 0.50 Link to: Qv
5 Area A(Acres) 0.93 acres qv3
6 Approved discharge rate(if applicable) 0.00 cfs Qv4�
Qvs
7 Is Seepage Bed in Common Lot? No V 2,012 ft3 25%Sediment
8 Set Total Design Width of All Drain Rock W 8.0 ft
9 Set Total Design Depth of All Drain Rock D 9.0 ft
Rock Only,Do Not Include Filter Sand Depth or Cover
10 Void Ratio of Drain Rock Voids 0.35
0.4 for 1.5"-2"drain rock and 3/4"Chips
11 Design Infiltration Rate(8 in/hr max) Perc 6.00 in/hr
12 Size of WQ Perf Pipe(Pert 1800) Dia pipe 18 in
13 Size of Overflow Perf Pipe(Perfs 3600),READ if Q100>3.3 cfs in
14 Calculate Total Storage per Foot Spf 29.5 ft3/ft
15 Calculate Design Length L 68 ft
Override Value Required for Chambers
16 Variable Infiltration Window L SWL 68 ft
17 Variable Infiltration Window W SWW 8.0 ft
18 Time to Drain 6.6 hours
90%volume in 48-hours minimum
19 Length of WQ&Overflow Perf Pipes 68 ft
20 Perf Pipe Checks.Qperf>=Qpeak;
where Qperf=CdxAxV(2xgxH)
Optional Storage Chambers
Note:This assumes chambers are organized in a rectangular layout.
1-StormTech,
1 Type of Chambers SC740
2 Volume to Store V 0 ft3
3 Installed Chamber Width Cw 4.25 ft
Installed Chamber Depth Cd 2.50 ft
Installed Chamber Height Ch 7.12 ft
4 Chamber Void Factor
5 Chamber Storage Volume,Without Rock,Per Manuf 45.90 ft3/Unit
6 Chamber Storage Volume,With Rock,Per Manuf 74.90 ft3/Unit
7 Total Number of Units Required 0 ea
8 Area of Infiltration Aperc ftz
9 Volume Infiltration Vperc 0 ft3/hr
10 Time to Drain hours
90%volume in 48-hours minimum
G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.xism 10/11/2021,10:22 AM
Version 10.0,May 2018
ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers
NOTE:This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the
Engineer's calculation methodology. These calculations shall establish a minimum requirement.The Engineer's methodology must result in
facilities that meet or exceed these calculations in order to be accepted.
Note this spreadsheet pulls information from the"Peak QV"tab
Calculate Post-Development Flows(for pre-development flows,increase number of storage facilities to create new tab)
User input in yellow cells.
1 Project Name Southridge South Phase 1,Facility 5,Bed 4
2 Enter number of Seepage Beds(25 max) 5
3 Design Storm 100
4 Weighted Runoff Coefficient C 0.50 Link to: Qv
5 Area A(Acres) 1.81 acres a,v3
6 Approved discharge rate(if applicable) 0.00 cfs a,v4
Qvs
7 Is Seepage Bed in Common Lot? No V 3,906 ft3 25%Sediment
8 Set Total Design Width of All Drain Rock W 10.0 ft
9 Set Total Design Depth of All Drain Rock D 5.5 ft
Rock Only,Do Not Include Filter Sand Depth or Cover
10 Void Ratio of Drain Rock Voids 0.35
0.4 for 1.5"-2"drain rock and 3/4"Chips
11 Design Infiltration Rate(8 in/hr max) Perc 6.00 in/hr
12 Size of WQ Perf Pipe(Pert 1800) Dia pipe 18 in
13 Size of Overflow Perf Pipe(Perfs 3600),READ if Q100>3.3 cfs in
14 Calculate Total Storage per Foot Spf 24.5 Oft
15 Calculate Design Length L 159 ft
Override Value Required for Chambers
16 Variable Infiltration Window L SWL 159 ft
17 Variable Infiltration Window W SWW 10.0 ft
18 Time to Drain 4-T hours
90%volume in 48-hours minimum
19 Length of WQ&Overflow Perf Pipes 159 ft
20 Perf Pipe Checks.Qperf>=Qpeak;
where Qperf=CdxAxV(2xgxH)
Optional Storage Chambers
Note:This assumes chambers are organized in a rectangular layout.
1-StormTech,
1 Type of Chambers SC740
2 Volume to Store V 0 ft3
3 Installed Chamber Width Cw 4.25 ft
Installed Chamber Depth Cd 2.50 ft
Installed Chamber Height Ch 7.12 ft
4 Chamber Void Factor
5 Chamber Storage Volume,Without Rock,Per Manuf 45.90 ft3/Unit
6 Chamber Storage Volume,With Rock,Per Manuf 74.90 ft3/Unit
7 Total Number of Units Required 0 ea
8 Area of Infiltration Aperc ftz
9 Volume Infiltration Vperc 0 ft3/hr
10 Time to Drain hours
90%volume in 48-hours minimum
G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.xism 10/11/2021,10:22 AM
Version 10.0,May 2018
ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers
NOTE:This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the
Engineer's calculation methodology. These calculations shall establish a minimum requirement.The Engineer's methodology must result in
facilities that meet or exceed these calculations in order to be accepted.
Note this spreadsheet pulls information from the"Peak QV"tab
Calculate Post-Development Flows(for pre-development flows,increase number of storage facilities to create new tab)
User input in yellow cells.
1 Project Name Southridge South Phase 1,Facility 6,Bed 5
2 Enter number of Seepage Beds(25 max) 5
3 Design Storm 100
4 Weighted Runoff Coefficient C 0.50 Link to: Qv'
5 Area A(Acres) 2.43 acres Q,vs
6 Approved discharge rate(if applicable) 0.00 cfs Qv6�
Qv7
7 Is Seepage Bed in Common Lot? No V 5,251 ft3 25%Sediment
8 Set Total Design Width of All Drain Rock W 10.0 ft
9 Set Total Design Depth of All Drain Rock D 11.5 ft
Rock Only,Do Not Include Filter Sand Depth or Cover
10 Void Ratio of Drain Rock Voids 0.35
0.4 for 1.5"-2"drain rock and 3/4"Chips
11 Design Infiltration Rate(8 in/hr max) Perc 6.00 in/hr
12 Size of WQ Perf Pipe(Pert 1800) Dia pipe 18 in
13 Size of Overflow Perf Pipe(Perfs 3600),READ if Q100>3.3 cfs in
14 Calculate Total Storage per Foot Spf 45.5 ft3/ft
15 Calculate Design Length L 115 ft
Override Value Required for Chambers
16 Variable Infiltration Window L SWL 115 ft
17 Variable Infiltration Window W SWW 10.0 ft
18 Time to Drain 8.2 hours
90%volume in 48-hours minimum
19 Length of WQ&Overflow Perf Pipes 115 ft
20 Perf Pipe Checks.Qperf>=Qpeak;
where Qperf=CdxAxV(2xgxH)
Optional Storage Chambers
Note:This assumes chambers are organized in a rectangular layout.
1-StormTech,
1 Type of Chambers SC740
2 Volume to Store V 0 ft3
3 Installed Chamber Width Cw 4.25 ft
Installed Chamber Depth Cd 2.50 ft
Installed Chamber Height Ch 7.12 ft
4 Chamber Void Factor
5 Chamber Storage Volume,Without Rock,Per Manuf 45.90 ft3/Unit
6 Chamber Storage Volume,With Rock,Per Manuf 74.90 ft3/Unit
7 Total Number of Units Required 0 ea
8 Area of Infiltration Aperc ftz
9 Volume Infiltration Vperc 0 ft3/hr
10 Time to Drain hours
90%volume in 48-hours minimum
G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.xism 10/11/2021,10:22 AM
Version 10.0,May 2018
Southridge South Subdivision—Phase 1
Meridian, ID
Storm Water Management Report
Appendix C
Geotechnical Report
462 East Shore Drive, Suite 100, Eagle, Idaho 83616 208.939.4041 • thelandgroupinc.com
SITE Post Office Box 190537 - Boise, Idaho 83719
«c site.consulting.idaho@gmail.com - 208-440-6276
.�
Mr. Tim Eck September 10, 2021
Cottonwood Development, LLC Page 1 of 23
2228 West Piazza Street Report 21831-A
Meridian, Idaho 83642
Re: Geotechnical Recommendation Report
Proposed Southridge South Subdivision
S. Ten Mile Road & W. Overland Road
Meridian, Idaho
Tim:
In May 2021, SITE was contacted about generating a geotechnical recommendation
report for your proposed Southridge South Subdivision. Our background with this
property is as follows:
• April 2010 — SITE Staff generated a ITD Gravel Source Approval Report for JLJ
Enterprises for the subject property.
• April 2013 — SITE Staff generated a report documenting the proper compaction
of structural fill placed by Idaho Sand and Gravel on a section of the property
located west of the Williams Petroleum Pipeline.
• April 2014 —This engineer was retained by this client to generate a Reclamation
Recommendation Report and then review reclamation activities by Idaho Sand &
Gravel.
Based upon our historical involvement with the property, field research & observations,
and laboratory test results, the site is acceptable for development as a residential
subdivision. Recommendations for construction are included herein. We appreciate this
opportunity to be of service. When appropriate, we would like to discuss continuing our
role as geotechnical consultant during construction. Please contact our office if
additional information or services are required.
Respectfully submitted,
SITE Consulting, LLC �� �
G%sTS q ��
Bob J. Arnold, PE �® >®
/I �Z_t
OF
a
Geotechnical Services/soil Testing&Inspection services
/ S SITE Post Office Box 190537 - Boise, Idaho 83719
site.consulting.idaho@gmail.com - 208-440-6276
O�v �. , LLC
Geotechnical Recommendation Report
Proposed Southridge South Subdivision
Overland Road, East of Ten Mile Road - Meridian, Idaho
GENERAL
This report presents our geotechnical research and resulting recommendations for a
proposed subdivision to be constructed east of Ten Mile Road on the south side of
Overland Road in Meridian, Idaho. Historical aerial photos, available on Google Earth,
indicate that the property was irrigated farmland prior to becoming a gravel pit. These
historical photos are included in the Appendix.
Research indicates the property includes two parcels as follows:
Number Parcel# Address Acres
1 S-1223234050 W Overland Road 26.5
2 S-1223131380 2347 W Overland Road 56.6
Total Acres 83+
In April 2010 this engineer generated a ITD Gravel Source Approval Report for the
subject property. That report included a reclamation plan that established maximum
depth of removal for the gravel pit operation. It also included the excavation of test pits
on a 150 x 150-foot grid pattern. That pattern is provided in the Appendix. Over 100 test
pits were excavated, eight were selected at random for inclusion in the Appendix of this
report. Note that the depth of allowed gravel extraction is indicated on each test pit log.
In April 2013 this engineer excavated test pits and then provided recommendation for
the recompaction of non-structural fill placed on the property west of the petroleum
pipeline. This effort was completed as designed.
In April 2014 this engineer designed and then oversaw the reclamation of the gravel pit
east of the pipeline. This effort structurally filled the site to the current elevation and was
completed by Idaho Sand and Gravel.
N
v
Geotechnica/Services/Soil Testing&Inspection Services
/ S T Post Office Box 190537 - Boise, Idaho 83719
site.consulting.idaho@gmail.com - 208-440-6276
LTING, LL
PURPOSE
The purpose of this evaluation is to document site history and provide recommendations
for building a residential subdivision and single-family residential structures. Additional
test pits may need to be excavated as development phases are submitted to ACHD for
review and approval in order to comply with ACHD rules concerning test pit proximity to
infiltration facilities.
AUTHORIZATION
E-mail authorization to proceed with this geotechnical investigation was received from
the project civil engineer (Land Group) and confirmed with the client in May 2021. At
that time the Preliminary Plat included in the Appendix was provided. Authorization to
proceed and the use of the recommendations provided herein indicate the client's
acceptance of the scope of work, warranty, limitations, and general conditions provided
herein and within any submitted and /or approved proposal.
WARRANTY AND LIMITATIONS
The evaluation of subsurface conditions documented herein is considered sufficient to
form a basis for the provided recommendations. The provided recommendations are
based on the available soil information and preliminary design details either assumed or
furnished by the client. It is warranted that these recommendations have been
promulgated after being prepared in accordance with locally accepted professional
engineering and geotechnicai engineering practice. No other warranties are implied or
expressed.
m
Geotechnica/Services/Soil Testing&Inspection Services
T Post Office Box 190537 - Boise, Idaho 83719
site.consulting.idaho@gmail.com - 208-440-6276
ZCONS:ULTING, LL
DESIGN & CONSTRUCTION RECOMMENDATIONS
General Earthwork
All native soils, which are free of organic matter and expansive clays, are acceptable for
use as fill on the building pads, in structural fill areas, and within planned ACHD right of
ways. Removal of the majority of the organic materials will require only minor grubbing
of 0-4 inches of surface soils. Removal of organics is required in all areas to receive
structural fill. The depth of grubbing is to be adjusted and inspected during construction
to ensure that organic materials are properly removed from beneath future pavements
and structural fills.
Structural fills less than three feet deep are to be compacted to 95% of the maximum
dry density by ASTM D698, Standard Proctor. Deeper fills are to be compacted to
100%. If structural fill is to be placed on residential lots, the fill is to extend laterally
outside foundations a distance equal to the depth of structural fill. Structural fill should
be placed in uniform, thin horizontal lifts, moisture conditioned as necessary, and
compacted to the above requirements. Compaction testing to confirm proper
compaction is strongly recommended.
Excavations
Shallow excavations and trenches that do not exceed four feet in depth may be
constructed with side slopes approaching vertical. Below this depth it is recommended
that slopes not exceed a vertical to horizontal ratio of one to one. The ability of soils on
site to maintain a vertical or near vertical excavation over any extended period can be
quite variable. This information is provided for planning purposes. It is our opinion that
maintaining safe working conditions is the responsibility of the contractor. Jobsite
conditions such as soil moisture content, weather condition, earth movements and
equipment type, and operation can all affect slope stability. All excavations should be
sloped or braced as required by applicable local, state, and federal requirements.
d-
Q)
Geotechnica/Services/soil Testing&Inspection services
T Post Office Box 190537 - Boise, Idaho 83719
Z
Tsite.consulting.idaho@gmail.com - 208-440-6276
SUL i I , LLC
Pavement Section
The entire property surface is structural fill consisting of pitrun type materials harvested
from the prior onsite gravel pit. R-Value test performed as a part of the ITD gravel pit
approval process resulted in R-Value results of much greater than R=20, the maximum
value SITE uses for street design. Based upon an R-Value of R=20 and a Traffic Index
of TI=6 the following pavement section is recommended for interior subdivision streets.
Material Layer TI=6
HMA Pavement 2.5"
Base Coarse (3/" minus) 4.0"
Subbase (Pitrun) 10.01,
It is noted that it is common for the local jurisdiction to require a standard design or to
match the existing pavement section when working on collectors or arterials such as
Overland Road. If improvements are required for Overland Road, ACHD should be
consulted concerning pavement design requirements. Materials meeting the
requirements of ISPWC &/ or ACHD are required for any work within this project.
Foundation System
The proposed single-family residential structures may be supported on conventional,
continuous, and isolated pad foundations founded upon the native soils or upon
structural fill extending to these soils. Based upon proper placement and compaction of
structural fill, bearing pressures of up to 1500 psf are allowed for foundations founded
on the native soils or upon properly placed and compacted structural fill. Either
crawlspaces or slab on grade floors are acceptable. Basements are not allowed without
a lot specific geotechnical /groundwater evaluation and recommendation report.
Slab on Grade Concrete
Care must be taken so that all excavations below both interior and exterior slab on
grade concrete are properly backfilled. Trenches and wall backfill areas are to be filled
in lifts and benched each lift so that fill is not placed against a vertical soil face greater
than three feet tall. Any fill used to increase the elevation of slab on grade concrete
should meet the requirement for structural fill. Slab on grade floors, sidewalks and
pavements should be placed atop a mat of at least V foot of granular structural fill
materials. Mat material should all pass a 3/4-inch sieve and should contain less than
seven percent passing the # 200 sieve. ISPWC W base or equivalent is recommended.
The mat shall be compacted to the requirement for structural fill. Ln
a
Geotechnical Services/Soil Testing&Inspection Services
S SITE Post Office Box 190537 - Boise, Idaho 83719
site.consulting.idaho@gmail.com - 208-440-6276
CONSULTING, LL
Storm Water
Two well logs, one south and one northeast of the subject property, were located on the
IDWR website and are included in the Appendix. The well logs indicate the static
groundwater is greater than 50 feet deep to the south and less than 10 feet deep to the
northeast. Preliminary plans indicate that stormwater will be directed to surface
detention ponds with subsurface infiltration or seepage pits. Based upon observed
subsurface conditions, SITE recommended a design perc rate of P=6 in./hr. with a drain
time not to exceed 24 hours. Monitoring wells and perc tests at injection locations are
recommended prior to design of each phase of this development. It is recommended
that storm runoff be directed away from all open excavations and not be allowed to
puddle on subgrade soils.
Inspection & Testing
A qualified engineer or his representative should monitor fill placement to ensure the
work is performed in accordance with these recommendations. Testing should be
performed in accordance with ASTM Test Methods D3017-88 and D2922-91 (nuclear
densometer). For mass filling, field nuclear moisture - density testing shall be performed
on each lift of compacted fill for each lot. Trench backfill and right of ways are to be
tested to ACHD / ISPWC requirements. It is noted that structural fill can pass
compaction tests and still be unacceptable if pumping, rutting, or deflecting under
vehicle or foot traffic.
General Comments
Testing and inspection services are recommended herein. Proper quality control during
construction is required to confirm materials and methods and thereby obtain a
desirable finished product. Monitoring and testing should also be performed to verify
suitability of materials used for structural fills and to confirm proper demolition, subgrade
grubbing, subgrade stability, and proper placement and compaction of fills. Any
deviations from the herein described subsurface conditions must be brought to the
attention of this consultant.
This report has been prepared for the exclusive use of the client and their retained
design consultants. Findings and recommendations within this report are for specific
application to the proposed construction described herein and apply only to the property
identified. Client may duplicate this report as needed or additional copies will be
provided upon proper client authorization.
Appendix Follows Q0
v
op
Geotechnica/Services/soil Testing&Inspection services
Z
TE Post Office Box 190537 - Boise, Idaho 83719
site.consulting.idaho@gmail.com - 208-440-6276
�.TINGp LLc
APPENDIX
Vicinity Map
Historical Aerial Photos (2)
Preliminary Plat
Geologic Map
Test Pit Locations
Test Pit Logs (8)
Soil Log Legend I Abbreviations & Acronyms
IDWR Well Logs (2)
Geotechnica/Services/Soil Testing&Inspection Services
1"�E Post Office Box 190537 - Boise, Idaho 83719
00'"� ^+ �(�*1 # �^ i site.consulting.idahotcigmail.com - 208-440-6276
ULTIt
Vicinity Map
Is e Ind P
€ae! ,
P axis N
x
U I,
PH"13
) g
Yahoo Maps 2008 0CD
Geotechnical Services/Soil Testing&Inspection Services
ITT Post Office Box 190537 - Boise, Idaho 83719
site.consulting.idaho@gmail.com - 208-440-6276
ULTIP
CONSULTING, LLC
Historical Aerial Photos
z
July 2010
Gravel Pit
Visible and
former test
N pits visible
I
?I
June 2007
Farmland
visible
prior to
gravel pit
bD
n
Geotechnical Services/Soil Testing&Inspection Services
SSITE Post Office Box 190537 - Boise, Idaho 83719
IT
J site.consulting.idaho@gmaii.com 208-440-6276
CONSULTLTING.. LLC
Preliminary Plat
0089
uojsfA!pqnS qjnaS a uquo
E�-
31♦la,.V, w rip, S�����I—
z
low 4R
it
I't
if
"it
fill,
1 77 Al IF
g
It
flij
M IN, M
v i WE
filll l
CD
Supplied by the Land Group (511012021)
Geotechnical Services/Soil Testing&Inspection Services
ITE Post Office Box 190537 - Boise, Idaho 83719
## site.consulting.idaho@gmail.com - 208-440-6276
,//CO' LTid � 4
Regional Aerial Photo from Google Earth Website
k
G & B Tdy F isk Pit Thuesen Pit Busy Bee-Blackcat Subject Property
oil
N,�
Geologic Map of Boise Valley
Idaho Geologic Survey Website
Geotechnica/Services/Soil Testing&Inspection Services
Z/SITE Post Office Box 190537 - Boise, Idaho 83719
p� site.consulting.idaho@gmail.com - 208-440-6276
CONSULTING, LL
TEST PIT LOCATIONSJTSII
4
.. `q S.
a"
c
4F } y
eta a S.
a d 1
ti £
T
n
.y
i U ,,A
C� l� <
bD
From Prior SITE report
Geotechnica/Services/Soil Testing&Inspection Services
SITE Post Office Box 190537 - Boise, Idaho 83719
site.consulting.idaho@gmail.com - 208-440-6276
ZC0142SULTINGILLB
RANDOM TEST PIT LOGS
Test Pit: TP-212 Existing Grade: 2684.5
Logged by: Bob J. Arnold, PE Finished Grade: 2684.7
Date Excavated: 02/22/10 Available / Excavated: NEEDS
FILL
Test Pit Lo
..__ 0
1 Sandy Silt with Gravel
2
3
4 HARDPAN
5 Cemented Silt with
Sand and Gravel
6
1
s
90 Sand,Gravel and
Cobble To 8" �
s { y 5
{ a i
BOH/NGE
Abbreviations
BAH Bottom of Hole
NGE No Groundwater
Encountered
Comments
bA �
r r s sy9�
M
? IT, W
Geotechnical Services/Soil Testing&Inspection Services
1T Post Office Box 190537 - Boise, Idaho 83719
site.consulting.idaho@gmail.com - 208-440-6276
ZLTING, LLC
Test Pit: TP-217 Existing Grade: 2672.0
Logged by: Bob J. Arnold, PE Finished Grade: 2668.4
Date Excavated: 02/22/10 Available / Excavated: 3.6 / 15.0
Test Pit Log
17Sandyilt with Gravel
d Cobble
,^ 2
3
-=tip
4 Cemented at top of
,. Gravel Stratum
e: 5
BOH/NGE
Abbreviations
ti BOH Bottom of Hole
NGE No Groundwater
Encountered
p( a
Comments
d
Geotechnical Services/Soil Testing&Inspection Services
ZU T Post Office Box 190537 - Boise, Idaho 83719
site.consulting.idaho@gmaii.com - 208-440-6276
LTING, LL+C
Test Pit: TP-240 Existing Grade: 2665.5
Logged by: Bob J. Arnold, PE Finished Grade: 2656.5
Date Excavated: 02/23/10 Available / Excavated: 9.0 / 15.0
Test Pit Log
^ t4; Previously Stripped
"gam
rya -
sayk r 2
3 _
a- 4 Sandy,Gravel&Gobble
tr
x
5 To 8"Maximum
6
8 Sand Layer from 8-10'
9
i }m 10
} 11
,.. 12
k 3
.a 14
AN
15 BOHINGE
Abbreviations
BOFI Bottom of Hole
NGE No Groundwater
Encountered
P
Comments
.F . Previously Grubbed
Geotechnica/Services/Soil Testing&Inspection Services
ITE Post Office Box 190537 - Boise, Idaho 83719
site.consulting.idaho@gmail.com - 208-440-6276
ULTIr , L .
Test Pit: TP-249 Existing Grade: 2690.1
Logged by: Bob J. Arnold, PE Finished Grade: 2675.8
Date Excavated: 02/26/10 Available / Excavated: 14.3 / 16.0
Test Pit Log
0 Silt&Clay topsoil
,a 1 with organics
2
3
4
6 '
Sandy,, I t
s
?.
'�v d
'4s'ViF'>
16 BOHlNGE "
�4 _ Abbreviations
AI,
.Lr
V. Bottom of Hole
=� r
BOH
.< = ,' , No Groundwater
+ '. "' 4s NGE Encountered
Comments
QD
Geotechnica/Services/Soil Testing&Inspection Services
ZI
TE Post Office Box 190537 - Boise, Idaho 83719
site.consulting.idaho@gmail.com - 208-440-6276
CONSULTING., LLC
Test Pit: TP-268 Existing Grade. 2678.8
Logged by: Bob J. Arnold, PE Finished Grade: 2664.2
Date Excavated: 02/25/10 Available / Excavated: 14.6 / 16.0
Test Pit Log
" FILL IN BANK
l£ '.4k
Original topsoil 156
l
7 Cements Silt and Sand
w Sand,Caravel Cobble
K TO 8"Maximum
}
16 _.BOH/NGE
Abbreviations
#m 1* BOH Bottom of Hole
NGE No Groundwater
Encountered
�5
_ y
r
Comments
Excavated against
an
Existin 5' fill
�I
Geotechnical Services/Soil Testing&Inspection Services
ITE Post Office Box 190537 - Boise, Idaho 83719
ii site.consulting.idaho@gmail.com - 208-440-6276
Z/CO LL
Test Pit: TP-289 Existing Grade: 2692.3
Logged by: Bob J. Arnold, PE Finished Grade: 2670.3
Date Excavated: 04/17/10 Available / Excavated: 22.0 / 22.0
_r
Test Pit Log
ill 0
y.
�r
1 Silt&Clay w/Organics
2
3
Mv
4 Cemented Gravel
k' 4
x �r
a.
i�
i
M
P
14
15
s.
20
21
y 22 BOH/NGE
Abbreviations
? BOH Bottom of Hole
NGE No Groundwater
Encountered
f ,kComments
00
b
M
—
Geotechnica/Services/Soil Testing&Inspection Services
SITE Post Office Box 190537 - Boise, Idaho 83719
site.consulting.idaho@gmail.com - 208-440-6276
CONSULTING, LL
Test Pit: TP-294 Existing Grade: 2672.5
Logged,by: Bob J. Arnold, PE Finished Grade: 2661.0
Date Excavated: 02/25/10 Available / Excavated: 11.5 / 14.0
Test Pit Log
0 Silt&Clay w/Organics
1
2 Cemented Silt
3
4 HARDPAN
5
6
' ,d,Gravel&Cobbl
Maximum
14 BOH/NGE
Abbreviations
BOH Bottom of Hole
No Groundwater
NGE Encountered
Comments
ro
" w
t
N
hA
2
Geotechnicalservices/soil Testing&Inspection Services
S SITE IT
Post Office Box 190537 - Boise, Idaho 83719
site.consulting.idaho@gmail.com - 208-440-6276
/COLT , LL
Test Pit: TP-307 Existing Grade: 2670.1
Logged by: Bob J. Arnold, PE Finished Grade: 2660.3
Date Excavated: 04/17/10 Available / Excavated: 9.8 / 10.0
Test Pit Log
a 0 Silt&Clay w/Organics
r
2 HARDPAN
4
5 Gravel in Cemented Silt
( 8 , , ravel&Cobble
9 To 8"Maximum
=x; 10 BOH/NGE
r;
n. Abbreviations
W� `
Bottom of Hole
BOHli NGE No Groundwater
Encountered
R Comments
F
A.., ..
d
y �7
Ql
l�0
2
Geotechnica/Services/Soil Testing&inspection Services
IT Post Office Box 190537 - Boise, Idaho 83719
UI site.consulting.idaho@gmaii.com - 208-440-6276
ONLTN , LL
SOIL LOG LEGEND
UNIFIED SOIL CLASSIFICATION SYSTEM
(ASTM STANDARD TEST METHOD D 2487 FOR CLASSIFICATION OF SOIL FOR ENGINEERING PURPOSES
MAJOR DIVISIONS TYPICAL DESCRIPTIONS
GW Well-graded gravel, ravel-sand mixture,little or no fines.
GRAVEL& <6%-#200 GP Poorly graded gravel,gravel sand mixture,little or no fines
GRAVELLY
COARSE <SOIL#4 5-12%-#200 GM Silty gravel,gravel-sand-silt mixtures
GRAINED >12%-#200 GC Clayey gravel,gravel-sand-clay mixtures
SOILS I
SW ell-graded sand,gravelly sand,little or no fines.
<50%-#200 SAND& <5%-#200
SANDY SP Poorly graded sand,gravelly sand,little or no fines
SOILS SM Silty sand,sand-silt mixtures
>50%-#4 >12%-#200
SC Clayey sand,sand-clay mixtures
ML Inorganic silt and very fine sand,rock flour,silty or clayey fine
SILTS AND INORGANIC and or clayey silt with slight plasticity
CLAYS CL Lean clay-low to medium plasticity,gravelly clay,sandy clay,
FINE LL<50% sitty clay
GRAINED ORGANIC OL Organic silt and organic silty clay of low plasticity
SOILS
>50%-#200 SILTS AND INORGANIC MH Elastic silt,micaceous or diatomaceous fine sand or silty soil.
-
CLAYS CH Fat clay-high plasticity
LL>50%
ORGANIC OH Organic clay-med.or high plasticity:organic silt
HIGHLY ORGANIC SOILS PT IPeat,_humus,swamp soil with high organic content
ABBREVIATIONS AND ACRONYMS
AASHTO American Association of State Highway & Transportation
Officials
ACP Asphaltic Concrete Pavement
ASTM American Society for Testing and Materials
BH Bore Hole
IBC International Building Code
ISPWC Idaho Standard for Public Works Construction
ITD Idaho Transportation Department
NP Non-Plastic
PCC Portland Cement Concrete
PCF Pounds per Cubic Foot
PSF Pounds per Square Foot
TP Test Pit
USCS Unified Soil Classification System
fV
Geotechnical Services/Soil Testing&Inspection Services
S SITE IT
Post Office Box 190537 - Boise, Idaho 83719
LTIr site.consulting.idahoa@Agmail.com - 208-440-6276
Z/CONSULTING, LLC
IDWR WELL LOG
South of Site
OF WATER _
WELL DRILLER'S REPORT 13a#Point Per
0
1,DRILLING PERMIT NO. -� ��. lo.WELL TESTS*
- _T Pump 42 :—
Name__.n # ° � w_a N at wiftf—W." w4w anvwx'10-1 Y-0 KK
. w[nte�,pgrwtacu- wow teit3tV tar, .k- _
sormin We
11 =WATER�. :
orh _�'q�Ff. kwt E)epth att sian'fit found
t ,. i� Alstdt€grt3$uCt "' ItE.E' rlt�e aeRB ,.,. ,�."
q14Gon La
—
sa TYPZ OF WORD .
W }.3 tify t.#x f9m3t zR �:.1 OtfRi,"rk '�-� -
0,o`er L METHOD -
kk1kY�r AR TX f Cat9a tit 0V1*r _
-t SEALING PROCEDURES
%'lam. *tom !wwov yp NJ
pedorawm
meow 1 l ER"s r E i[1 1 Tt[ t
tm*as Ham€ �a Gc? aai a F t
too U"w Vw iv M41%*V"
it F14m No
ar4
tsiv, t, Co nw
F-t>A ARD u4rerE-COPY 10 user RESDI MS N
a
Geotechnical Services/Soil Testing&Inspection Services
Z
Post Office Box 190537 - Boise, Idaho 83719
site.consulting.idaho aegmail.com - 208-440-6276
CONSULTING, LL
IDWR WELL LOG
Northeast of Site
!DAHO DEPARTMENT OF WATER RESOURCES ukeuseonly
WELL DRILLF-Ri$REPORT
t.WELL TAG NOp D .��Y _ T
i7 f€#fr CR I t1Q.� r tt. WELL TESTS;
R'.,.Pvtrp vier C.tr&r f Raw,99 Aftske",'
ens
2. OWNM py x Y'"Sa 4 -�n Craze€,?.� $snP+r4+N�4f t?r,a
44 _.-._-�-.� �^ Wiz.,.. P�i r.; .>f-.t� --
t c1
v
" $W..,... - T WOW dam, �`_,�_.�S. LOCATION 0f WELL 6Y legal deaetigt(on: *AM to or L- a
'a'fvkf'map fwA#mrt",t=l a$k"ffQ2*it%wri.-tarp i+A:at 1, � �^frAVeaer }f ft
� . 6-T`HOLOGI LOB` i sarrto repair$or abandoom"tj wars
y SAD rrafi 14ava�erRs-EMka#a9'd,#Whirr�ldanky F##'aaepare a a ar'Csa�. CrOr4fs ` cs ���in� ,
Rgs,s i� Exit _ or Waif r {
Coratltr. C-'Wruation
fhxtmaf
S. TYPE OF WORD � a�tf�f amity Ri amaas ��? ^
V4Wt k� tk¢drly L a?ys;:R}4n � t? :.-.--�.. �" �#�d
7, SEALING PROCEDURES
n fi
g'ftxs st" 39}3`lffi�fpi}s�&gifl�� �t�$_,<..—..:.s. _.�®,_�_.
��.�.
tit" of
- rERFORA'IONSISEREEN
1i8?rts NOW.
caovIeted aepih Ei+iz [e€af
Frstt , :.#et Rx� A.a�rt.r s"iFsr %sra-zs n Y :.i..• _
-_ hta the rig raa8�men�f
S¢' STATIC1kTE€I LEVEE ARTESIAN PRESSURE: fdrma vyz 2 g titssb r
rf406,Ifund 4sfesl;tn Pressure -Idt.
'liow Q *rQd __ [„ vu rite �,€'� a gor or ark : ..
C+lfl0#If9"dlfr4S:
FORWARD WOttE COPY €fr WATER PE".6CifiCE5
N
W
Nothing follows.