Loading...
CC - Engineer Statement TH E LAND GROUP November 2, 2021 Mr. Warren Stewart, PE City of Meridian 33 E. Broadway Ave. Meridian, ID 83642 RE: Southridge South Subdivision Phase 1 Street Centerline Elevation Certification PN 121027 Dear Mr. Stewart: As required by the City's final plat application requirements, please accept this statement certifying that all street finish centerline elevations are set a minimum of three (3)feet above the highest established normal groundwater elevation. According to the initial test pit investigations and recent construction activities,the groundwater within this project was not encountered within a depth of three (3)feet of the existing ground. Based on the above information, I certify that groundwater would be greater than three (3)feet below the designed finished street centerline elevations throughout the project. Sincerely, SAE Jason Densmer, PE, Principal 09 The Land Group, Inc. �9TEOF ��P �sON DEN 11/02/2021 462 East Shore Drive, Suite 100, Eagle, Idaho 83616 208.939.4041 thelandgroupinc.com