CC - Engineer Statement TH E
LAND
GROUP
November 2, 2021
Mr. Warren Stewart, PE
City of Meridian
33 E. Broadway Ave.
Meridian, ID 83642
RE: Southridge South Subdivision Phase 1
Street Centerline Elevation Certification PN 121027
Dear Mr. Stewart:
As required by the City's final plat application requirements, please accept this statement certifying that
all street finish centerline elevations are set a minimum of three (3)feet above the highest established
normal groundwater elevation.
According to the initial test pit investigations and recent construction activities,the groundwater within
this project was not encountered within a depth of three (3)feet of the existing ground.
Based on the above information, I certify that groundwater would be greater than three (3)feet below
the designed finished street centerline elevations throughout the project.
Sincerely,
SAE
Jason Densmer, PE, Principal 09
The Land Group, Inc.
�9TEOF ��P
�sON DEN
11/02/2021
462 East Shore Drive, Suite 100, Eagle, Idaho 83616 208.939.4041 thelandgroupinc.com