Loading...
Meridian Settlers Change Ord 4 Meridian Parks & Recreation Memo RECEIVED , ' 1 Q ')Cf'() -' .- _ ,.I ........'1...:..;.. To: From: Date: Re: Mayor Corrie I City Council Tom Kuntz ~lL July 19, 2002 Consent Agenda Items for July 23, 2002 Meeting CITY OF MERIDIAN CITY CLERK OFFICF The Parks Staff is requesting three change orders for your approval under the consent agenda for your July 23, 2002 meeting. 1. Chateau Park Change Order #1- $7226.89 The original plans from our architects called for a water tap near the fire hydrant in Chateau Park. After final review the fire department infonn us that the tap would not be permitted. Item 1A on the attached change order covers the addition of 460 Lf of 4" water pipe and a deduction of 140 Lf of 2" water line for a net increase of $5290.00. Item 1 B reflects a decrease for the concrete curbing around the playground area and an increase in the concrete curb, gutter, and flat work for a net increase of $1936.89. This will be the only change order since the park is complete. ~ 2. Settler's Park Change Order #4 - $5802.00 When the water line was being installed in Meridian Road, ACHD inspectors found the native soils in the water line trench to be unsuitable for replacement. The change order covers the cost of replacing the soils with pit run. We plan on recouping one half of the total cost through the latecomer's agreement with Sundance Subdivision since this water line benefits their development. 3. Settler's Park Change Order #5 - $168,059.00 This change order covers the cost of building the second portion of the parking lot along Meridian Road. The original estimate of $125,000.00 was provided prior to design specifications. David Mae of the CM Company and Keith Bird our Council Liaison have reviewed the cost difference between the Page 1 original estimate and the new proposal and found the costs to be fair and acceptable. The largest increase is the result of additional pit run material necessary to be imported for the parking lot base. To date this change order brings the total construction of Settler's Park to $1,097,996.00. The architect's estimate for phase 1 was $1,300,000.00 and our total budgeted amount for the project was $1,500,000.00. With the attached change orders we are still under budget. . Page 2 2000 Edition - Electronic Format AlA Document G701- 2000 Change Order PROJECT: (Name and address)Meridian 58 Acre Park Phase One CHANGE ORDER NUMBER:04 DATE: June 19, 2002 ARCHITECT'S PROJECT NUMBER: 01028 CONTRACT DATE: March 28,2002 CONTRACT FOR: Site Development & Landscape TO CONTRACTOR: (Name and address)American Paving PO Box 395 Meridian, Idaho 83680 THE CONTRACT IS CHANGED AS FOLLOWS: (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives.) Additional cost due to removal and replacement of unsuitable soils in water line trench on Meridian Rd.. as required by ACHD See attached invoice from Cascade Pipe Corp and American Paving. The original (Contract Sum) (CuaraBteed Maxim\1ID Price) was $833.165.00 The net change by previously authorized Change Orders $90.970.00 The (Contract Sum) (Guaraateed Maximum Price) prior to this Change Order was $924.135.00 The (Contract Sum) (Cuaranteed Maximum Price) will be (increased) (decreased) (unchanged) by this Change Order in the amount of $5.802.00 The new (Contract Sum) (Cuaranteed MMa:m:I:1ID -Pfi€e1 including this Change Order will be $929.937,00 The Contract Time will be (increased) (decreased) (unchanged) by (Q) days, The date of Substantial Completion as of the date of this Change Order therefore is 10/14/02 NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive for which the cost or time are in dispute as described in Subparagraph 7,3.8 of AlA Document A.2Ol. Not valid until sismed by the Architect, Contractor and Owner. The Land Group, Inc. American Paving Co. City of Meridian NER(7)pedname) (Signature) Lvcr Z--- 'Oflu tl? p.e . BY TJ1K. ~ 4/lit/.1? , I ~ ..9 Ite:r 1Jt- DAT{ BY ~~ /I{-;P~ DME DME @ 2000 The AmeTlcan InstItute ot Architects. Reproduction ot the material herern or substantial quotation of its provisions without written permission of the AlA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution, This document was electronically produced with permission of the AlA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. User Document: changeorder3.aia -- 6/19/2002. AlA License Number 1116865, which expires on 5/31/2003. OWNER D ARCHITECT 0 CONTRACTOR 0 FIELD 0 OTHER D AUTHENTICATION OF THIS ELECTRONICALL Y DRAFTED AlA DOCUMENT MAYBE MADE BY USING AlA DOCUMENT 0401. ~.~,. .... ... .....-. . - ..... .~~ - @ 2000 AIA@ AlA DOCUMENT G70l-2000 CHANGE ORDER The American Institute of Architects 1735 New York Avenue, N.W. Washington, D.C. 20006-5292 * * American Paving Co. Telephone: 888-7988 Fax: 888-5020 PO. Box 395, Meridian, Idaho 83680 Idaho PW #12145-AAA-2-4( 43) Oregon eeB # 137240 June 7, 2002 The Land Group Attn: Dave Koga 128 SEagle Rd Eagle, Idaho 83616 Re: Meridian 58-Acre Park Phase I American Paving Co. lob1/. 1248 The following is request for change oIder as per our letter dated May 23, 2002, concerning removal and replacement of unsuitable soils in water line 1Iencb.. as required by ACHD. The agreed upon unit price was $10.90 per cy, actual quantity required to be removed and replaced was 532.33 cy for a total of $5,802.00. Enclosed is a copy of Cascade Pipeline's original request for change order. Total request for c:hange Older (add)................................................................$5~802.00 If you should require any further informa1ion, please don't hesitate to caU our office. Sincerely. American Paving Co. ~ Vice President TUtk 1248-RCO-c0#2 cascade ASeADE IPEUNE ORPORATION G_~c~ p.o. Box 1135 · Meridian, Idaho 83680 · Bus: (208) 855-0201 · Fax: (208) 855-0258 .sgQyEST FOR CHANGE ORDER TO: AMERICAN PAVING DATE: 6/3/2002 ATTN: TERRY LUTZ CHANGE ORDER: # 2 Revised per completed work. PROJECT: MERIDIAN 58 ACRE PARK We hereby request approval of this Change Order for the abo~e-mentioned project due to changes and/or extras as outlineclln the followtn9: MESSAGE: EXPORT UNSUITABLE SOILS AND IMPORT GRANULAR STRUCTURAl FlU (PIT RUN) ED MERRill WITH ACHD REQUESTED IMPORTIEXPORT ON THE WATER LINE TRENCH DUE TO UNSUITABLE SOILS. COST: PIT RUN DELIVERED (SUMMIT STONE) $ 7.89 CY EXPORT OF TRENCH MATERIAL (SUMMIT STONE) $ 1.25 CY LOADER 44.50 HR @ 2.5 HRS $ 0.23 CY OPERATOR 15.00 HR @ 2.5 HRS $ 0.08 CY TOTAL CY COST; $ 9.45 CY 10%MU $O.95CY TOTAL CY PRICE: $10.40 CY TOTAL YARDAGE OF PIT RUN NEEDED TO STAflLIZE THE WATER TRENCH PER ACHD DIRECTION IS 532.33 CUBIC Y ARCS. (532.33 CY J( $10.40) TOTAL REQUEST: $ 5,636.23 TERMS OF PAYMENT: , Subject of Terms and Conditions are attached hereto, which are reffered to and hereby made part of this Proposal and Contract. All tenns of this proposal are fD be intergrated with any other contract pertaining to the same work.' , ACCEPTED: Authorized Signature (Contractor) BY: BUYER ~~ BY: SELLER DATE: DATE: ~ III 'd 19l0'ON ~dll:l lOOl '8 'unr