2021-11-10 Meridian Parks and Pathways
Reviewer: Kim Warren / Pathways Project Manager
Planner Assigned: Joseph Dodson
Project Name: Lennon Pointe File No: H-2021- 0071 AZ, CUP, PP Date: 11/10/2021
The following will be required for development of the proposed project:
CONDITIONS OF APPROVAL - PATHWAYS
1. The project developer shall design and construct multi-use pathways consistent with the location
and specifications set forth in the Meridian Pathways Master Plan Map and Master Pathways
Plan Document Chapter 3). Any proposed adjustments to pathway alignment shall be
coordinated through the Pathways Project Manager.
2. Prior to submittal of the final plat for City Engineer signature, the applicant shall submit a public
access easement for a multi-use pathway running roughly parallel to the Creason Lateral that
connects the existing sidewalk at Linder Road to pathway on the neighboring property to the
south. Submit all paperwork to the Planning Division for Council approval and subsequent
recordation. The easement shall be a minimum of 14’ wide (10’ pathway + 2’ shoulder each
side). Use standard City template for public access easement. Submit all easement documents
online through Citizen’s Access Portal.
3. Construct multi-use pathways per typical paving section(s) shown in the Meridian Pathways
Master Plan Chapter 3.
4. The owner (or representative association) of the property affected by each public access
easement shall have an ongoing obligation to maintain the multi-use pathway.
5. 6’ high open vision fencing shall be installed between pathways and (live) water irrigation canals
and laterals as detailed in the Meridian Pathways Master Plan, Chapter 3, page 3-5. All other
fence details per UDC 11-3A-7.
6. Project developer shall be responsible for obtaining license agreement and other permission(s)
as required for constructing within irrigation district easements.
7. Should any discrepancy exist between these conditions of approval and the requirements of the
irrigation district, the developer shall work with Pathways Project Manager to achieve a pathway
design that meets both City and irrigation district objectives. City requirements as stated shall
not (nor are they intended to) override those of the irrigation district having jurisdiction over the
project area.