Loading...
PZ - Pre-app Notes ETT Planning Division 1D1A `� ^'' PREAPPLICATION MEETING D A�i t3 Type of Review Requested Pre-Application Request File number: P REAP P-2021-0053 Assigned Planner: Sonya Allen Scheduled Date: 05/25/2021 Scheduled Time: 9:30 AM Applicant Information Name: JOHN WARDLE, BRIGHTON CORPORATION Address: 12601 W. EXPLORER DRIVE SUITE 200 83713 Phone: 208-287-0518 Email: jwardle@brightoncorp.com Additional Attendee(s) Name: Michael Wardle Business Name: Brighton Development Address: 2929 W Navigator Dr Meridian, Idaho 83642 Phone: 208-378-4000 Email: mwardle@brightoncorp.com Name: Josh Beach Business Name: Brighton Development Address: 2929 West Navigator Drive, Ste. 400 MERIDIAN, ID 83642 Phone. Email: jbeach@brightoncorp.com Subject Property Information Location/street address: Assessor's parcel number S1131417210 (s): Township, range, section: 3N1E31 Project Description Project/Application Name: APEX West Description of Work: Preliminary Plat 46.31 Acres Application Information APPLICATION TYPES Preliminary Plat - PP: CHECKED PLATS ONLY Number of Building Lots: 132 PROJECT INFORMATION Gross Density: 2.85 33 E Broadway Avenue, Suite 102 • Meridian, Idaho 83642 Phone: (208)884-5533 • Facsimile: (208)888-6854 • Website: www.meridaincity.org 1 I acknowledge a neighborhood meeting is required prior to CHECKED application submittal: I acknowledge pre-app notes are good for 4 months: CHECKED I acknowledge that a Site Plan will be uploaded in the attachment CHECKED section: In Reclaimed Water Buffer: No Irrigation District: Boise Kuna Number of Residential Units: 132 Percentage of Site Devoted to Landscaping: 16% Primary Irrigation Source: surface Secondary Irrigation Source: well Who will own and Maintain the Pressurized Irrigation System in this HOA Development: PROPERTY INFORMATION Prior Approvals (File Numbers): H-2015-0019 (South Meridian AZ); H-2020-0056 (PP) TYPE OF USE PROPOSED Residential: CHECKED Single-Family Detached: CHECKED ZONING DISTRICT(S) R-2: CHECKED R-8: CHECKED Review Type Reviewer Review Notes Addressing Plan Review Notes Terri Ricks No comments at this time. TLR Building Plan Review Notes Bret Caulder Proposed structures to comply with the 2018 Building Codes MFD Plan Review Notes Joe Bongiorno There will need to be secondary access provided after the first 30 building lots, or everything in this phase will have fire sprinklers installed. A detailed phasing plan will be required. Parks Plan Review Notes Kimberly Warren Multi-use pathways required: one north-south connection along the Watkins drain, or along the midmile collector. one pathway along the length of the Pipeline easement through the site. Connect the first pathway to the pipeline. Dedicate easements for both. 33 E Broadway Avenue, Suite 102 • Meridian, Idaho 83642 Phone: (208)884-5533 • Facsimile: (208)888-6854 • Website: www.meridaincity.org 2 Planning Review Notes Sonya Allen *Annexation of Parcel #R7824220042 will need to be finalized before submittal of preliminary plat application (Shafer View AZ). * Comply with the terms of the existing Development Agreement(s); or apply for a modification. * Preliminary plat to subdivide property-comply with subdivision design & improvement standards in UDC 11- 6C-3 &dimensional standards in UDC Table 11-2A-6 for the R-8 district-ALL of the parcels need to be included in the boundary of the plat, remnant portions can't be left out. * Submit phasing plan * Construct collector street consistent with Master Street Map. * Extend stub streets & provide stub streets to adjacent properties. * Extend collector street along west boundary to connect to Quartz Creek. * Provide qualified open space &site amenities per the standards in UDC 11-3G-3. *The McBirney Lateral crosses this site; comply with the standards in UDC 11-3A-6. * Comply with Williams Pipeline development standards. see comments Wastewater Plan Review Notes Tyson Glock • Why are they not bring the sewer to the east through one of the roads? • Flow is committed •Ensure no sewer services cross infiltration trenches • Ensure no permanent structures (trees, bushes, buildings, carports, trash receptacle walls, fences, infiltration trenches, light poles, etc.) are built within the utility easement. Water Plan Review Notes Kyle Radek Offsite water main will be required to make second water connection to E Quartz Creek St to NW. Some water mains will need to be upsized to 12 inch to build 1/2 mile grid. 33 E Broadway Avenue, Suite 102 • Meridian, Idaho 83642 Phone: (208)884-5533 • Facsimile: (208)888-6854 • Website:www.meridaincity.org 3 �DIY ■Y i .Y - - � 44 Wawa FVIURE \vA 'r cl FUrJURE VVELCIRMINT E.LAKENAZELROL ! 53 tm je APEX r Southeas ire , i . S 0 50 100 150 15.07' v \ - APEX WEST SUBDIVISION Plan Scale: 1" = 50' -77 16.88' ° \\ 5/13/21 -12"GI 12"GI 12"GI 12"GI 12"GI 12"GIPLAT LAYOUT - - ,27 8,885 SF \ \ 0 20.00' 10 \ I \ \ 52.50' / ° \ \ 3,948 SF 01 2732 \ O °`9' \\ pp, 2,500 SF h� 26.36' \ \ Oo \ 1 1 8,250 SF \ \ BLt7�lE 7 ,�SpO 20.00' ��0 5.05' \\ 34 h �2 \ 27 1-161 8,250 SF 0 7,499 SF moo°o \ I � \ 0 3,656 SF \\ \\ \ ,o I -2736 \ oo. o\Fc+\ 8,250 SF O 7 00 \ 7,500 SF 6 \\ \ o S /7 8.85' O \\ \ \ 1c\mac\ Op \ \ \ 6O p \ � co \\ \\'-°A°o 10 \\ �� 7,500 SF _ _ 10.21' 8.85' 7 \ 5 F S \ \ 8.50' \ \ � 13.39' 00 \ � ` O O0o 10.21' 2734- 7,500 SF 8.50' 7 8,162 SF coo' \ 7,500 SF 1 \ 0� Op 2736\ \ rn n� \ Op O' o \ \ 32.78' \ O 00 SF 2,795 SF 00' 7,500 SF 40.82' O• \\ 22.44' 17.63' o� \ o 2738_ \ 30 \ \\ 13 0 00 \ 7 71500 SF 3 0\ \ \ 7,500 SF \ Sp 0 \ 7,500 SF S� \ O 3,732 SF \c \ \ 2 46.23 -2740- 21.97' 6.00' 54. \ 7,052090 SF 41.90' 00 \ \ oO00 � 4 �SF / \\ \ I \o / I / N 8,380 SF 8,250 SF 6O 0 32 \ \ ' 1 \ v \ �0 00 2742 coo 7,500 SF ��s 71500 SF 0.2- \\ \ 12.00' 0 \ �' \ \ 9,872 SF 7 8,250 SF OI V A I 8.50' I 5.61' „ � \ AS �S O' � \ OO 10.21 I 29 3 S p Top 1 Op, 27 00. 33 8.50' \° \ \ G T � \ \ � o �� 12.00' Q 00 O � 7,500 SF \ O \ w „�� 00 00' 7,500SF 2S\ I o \ 30 w \ 17 v �y• \` o 8,250 SF 00 \ 0 c \ �\ 30"c I g6.73 \ S'_ T\ �� 0 26 co co \ 2 _ � �� \ °' �jD� 0 > 7,500 SF 300 \ 7 \ n \ 2 30 30 = \ \ OF r o o• 7 7,500 SF 1 7• ��� co p A \ 7 y� co G w p A �� l' O �3 2740 A \ o�► \ � 114.60' �2744 v\-S o \ \ o op 00 35 0 \ \ 00 8�250SF V 05 \ \ \ a�� 3et T � 71500 SF 0 \ ��Sp \ 3,656 SF 8,318 SF \\ 10,415 SF 37,507 SF 0 ' Op 0 \ ro W \ \ 0 1 / 45.47 ��0i T O \ x. y 46.34' � O' 6 3 \ \ \ oo 0 146.37' 37.99' 3p[ o� �QQ 00 36 8,250 SF \ ��st \ 56.29' 12,657SF \ I \ 26.36' TO \ \ \\ u') \ \ �,ao 52.90' O o \ w \ m -�0 84 0 3c134 8 \8,249 SF `°0 5.05' 256 � 4 ��0 w � `34.8g• '1c`� 8,250 SF I/ 13,558 SF cl� ,�' .p p � \ `^ 1 \ �0 o O �� 69.37' Oo a , \ ��� \off o° 7 ��� �s 4 10,660 SF oco' �\ 44 To 01 oco'� 8,250 SF \ 0,798 SF 54.06' �S 17,378 S \ 8,552 SF BLO K 8 23.40' °O• �� �01 Sp 5.00' U) N� �r0 tsp A 9 \ c \V w o 0 -o O 6' S2.59' �%� D� 0 \ \ \\ \\\ ern m o \ / 5.30' 8 776SF o' 0 , 31,102F \ ��, 37 W o �o. \ �S� 8 \ \ 0 00S W \\ \ oA 8,250 SF o up� 0 p� \c \ \\\ w ^j �� 10,729 SF '--1 p \ \ \ \ \ \BLOCK 6 \ N � 11,084SF ���` •Op, � i\3� � rap-1 1T o w 00 �� \o B 4 �4>> 55.41' ��- w d 0 Op, 2 0 � To 8,253 SF \ \ �v\� o \ 20,121 SF 13,197 SF co' O \_ \ S A c o �oW rn rn I \ 0 8,250 SF \ Top -OI ul1 21,063 SF O \� Sj Cps 8 266 SF - - g� O 14 6 w 37.65 - \ i(o °° 15.86' °' �° v � °" v - / '?6 �27 \ 4D \ \x � \ o \ 9,351 SF w w op� _ >8 95' 8,047 SF \ oo0 I I 66.03' 66.00' 66. 0' 66.00' 39 \ 10.21' o� 58.26' 66.00' 73.55't \TOe \ 24.46' Top �� ° \ \ \ \� 8,871SF O. p� 39' 6 O• A \ I \ I \ 1� 48. \22.30' Top w 2� c� \ d• S 30 - � � 0 � ' 28,357 SF \ 1 \ \ �� sp \ \ 1\ ��T �\ w 10,692 SF \ D \ \ \ �° W o O• (J� 2 4 6 I 1 \ \ 15.74' 10.21' \ 60, \\\��d \ \ 0 ✓ N \ \ A co' 14.99' v 13 p� 0 0 0 00 11,544 SF O Ln ✓ of ✓ ✓ w _� ✓ `383, .v \ ✓ w V A \ �� 0 44 \ 0 43 0 42 00 � �✓ O N N N 12 M M �✓ 126.00 Y ✓ ✓ w ✓ ✓ ✓ �� .v .v .v A 7,922 SF \ 7,920 SF 7,920 SF 7,918 SF 11,457 SF 6 8,580 SF 9,286 SF _ �� N 200.53 � 70.64' 10,620 SF �j ?p.,3 \ - W V 1a 44' �p0 A\ COI \ 39.69� V �M w w w ✓ ✓ ✓ A \ O N C 23.22' NU% 7.81' \ 31.42' 25.43' 8,668 SF ��� \ '�V x 66.00' 66.00' 66.00' 53.1 1' 25.89' 105.13' 66.00' 52.00' cp � cA of \ 21.97' - 10.98' �'.� k29.05' 120.00'o 52A4' 75.63' \ V�76P 10,746 SF 39.96' 1 19.99' VA �8\� o x t \VATop �� \ 1 0 R \ o w �� s F� O O O O \ �� .. .. \C A O I 13.10' 30 O 8 p \\ TOp v \ \ \ \ \ 27,458 SF 26.87' 2.99' cfl 7,200 SF CO 7,200 SF (o \ a 1,867 SF 10.21' \ 27 0 1 15.97' 13.50' \ �O 4,077 SF V�A�op \ \ \ �•- x 24.07' •6�\ I . I � ��- + \ 0 A _ s \ � 66.00' 66.00' 60.00' 5607 9 120.00' 120.00' „may Top 60.66' 23.29 60.00' 60.00' 60.00' 4.9 5.13' 45.14' � r \\ O , 62.52' \ \o \ o \ \ 23.14' 0 o \ \ f \ o O\ O w 3Q \ �t� \_ Top V 0 0 0 w ✓ w V� \ 8,974SF \ � � 0 29 \ o0 09 0 I � _� TQ'�c �, \O O w \ \ \ o o ao \ \ 7,200 SF 7,200 SF \ \oA � '�, 109.3 0 o \ 0 0 0 20 °'• 21 � 135.97' �2740- o- o o 0 r7 26 w `-�O! � �Top J �y S tlj 16 ui 7 ,ri 18 19 \ N N 22 O O \ O O 0 120.00' \ 120.01' X T T° O �\ \ \ I N N I CIE N 0 N 0 N 7,669 SF 0 0 0 0 8,084 SF ` T ` � s,8zz SF 0 �; 22 �; 23 �; 24 25 Q p \ \ 8,250 SF 8,250 F 7,500 SF 7,500 SF \ 8,259 SF 60' N \ V 7,500 SF 7,5 SF 7,500 SF 7,507 SF 30.00' BLOCK 1 \� + `�' 9p�� 0 0 BLOCK 3 Q CO y w w w w w w w w 4L� TTg� �OP w \� V ✓ w .v w \ O O O 0 0 ✓ w w w w ✓ ✓ ✓ w / q A ✓ ✓\ .v .v .v ✓ ✓ ✓ w .v G G' ��� \ \ \ BLOCK 5 8,974 SF \ \ 0 0 10 0 \ \ \ VA\� b`� + + _06 00 9,000 SF 7,201 SF\ + + + + G G \ \ 0 60.00 66.00' 66.00' 6b 00' 60.00' ' 66.00' 60. 54.00' 60.00' 21.97' 0 60.00, 60.00' \ 60.00' 60.00' 60.00' 60.00' 60.00' 30.00' 30.00' 60.00' 30.03' \ V \\ \ o •s �0. V X �, �, �. �. �. �. �, �, �, �. �. �. � \ O \ O \ �� 06,719 SF \ s�\ \ 0 0 c 744. \ A o \0 \ 4,079 SF \ 4,982 SF \ \ � + \\ \ + \ �� ° \ \ \ \ w \\� �' N 0 O O O 0 O O \ O O O O O \ O O O O O o ` ` w ✓ ✓ ✓\w w w w ✓ ✓ ✓ ✓ ✓ ✓ w ✓ ✓ ✓ w w O O O O q Ki 14 13 ,ri 12 1 10 9 8 7 o 0 0 0 0 0 o W W w w w w \ W W W W W w w w w W W W w w w w W W w w F F \ N O N O N O N \ N O N O '�C14 O �i O �' O L L 20 q 19 0 18 �; 17 Lri 16 �i 15 �i 14 I 13 Lri 12 Lr) 11 0 \ N N N N N N \ \ \\ \ qo 8,245 SF 8,250 SF 7,500 SF 7,500 SF 7,500 SF 8,250 SF 7,500 SF N 7,500 SF 7,500 SF 5 N 7,500 SF N 7,500 SF 7,500 SF 7,500 SF 7,500 SF 7,500 SF 7,500 SF 7,500 SF 7,500 SF 3,635 W W w w w w W W W\ W W W w w w W W W w w w w W W W w\w w + 1 33 3' \ 2,737 SF y + + +x -/1\ I 1 9. 540.53' Fc 20.85' 66.00' 60.00' 60.00' 60.0 66.00' 60.00' 60.00' 60.00' 2j38 60.00' 60.00' 60.00' 60.00' 60.00' 60.00' 60.00' 60.00' 60.00' \ 32.67' \ s \ \ 10.21' -f3 50'- oD " �3 _ 15.47 10.21 �j 14. �7' s"w a°w s"w s'V e"w R u : s 1y s °w a° a°w s"w s"w \ 0� L 72.52'i i i A . 0 E. CRESCENDO ST. r'� Ap\ N r \ `cP \ 2742- \~ \ �I 3.506 `� I 25.92' \ \ \ 17.50' O I 3I\ i 6 I 50.07' 50.0 50.00 50.00' 50.00 50.00, 50.00' 50.00' 50.00' 50.00' 50.00' 80.43' 50.00' 50.00' 50.00' 50.00' 50.00' 50.00' 50.00' 50.00' 50.00' 50.00' 50.00' - ®PI _ -P774"PI4 3 \ a y- P-\- - ---�- 4„ 4 417 - -7400 W N 0)0 APEX NORTHWEST 06 co 3 j \ \ I-s- SUBDIVISION NO. 2 a I S \ a W x I � O ON O o O o 4 O O o O o O O O o 9 0 10 \ o0 11 0 12 00 13 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 o Ico o , I N N N N N N O N O N O O O 0 14 0 15 0 16 0 \ 17 0 18 o 19 0 20 0 21 0 22 0 23 0 2 0 25 0 \ I w� o O� N N N N N O N O N O N O N O N O N O N O N N O w oI 19.00 III I �I �� 2,342 SF 6,007 SF 6,000 SF 6,000 6,000 SF 6,000 SF 6,000 SF 6,000 SF 6,000 SF 6,000 SF 6,000 SF 6,000 SF 9,651 SF 6,000 SF 6,000 SF 6,000 SF 6, 0 SF 6,000 SF 6,000 SF 6,000 SF 6,000 SF 6,000 SF 6,000 SF 6,002 SF 2,961 SF 14 IW I � s O I I I CO 04' 50 \ \ \ ao \ I S I \ 50. . . \0 . .00 50.00 50.00 50.00 50.00s0. 0 80.43 50.00 5 \ a_ I DEVELOPER I I I 00' 5000' 0' 5000' 50 ' ' ' ' ' ' ' ' ' 0.00 50.00 50.00' S0.00' 50.00' 50.00' 50.00' 50.00' 50.00' 50.03' 5.00' \ I �, I o I I I S BRIGHTON I mom -� 0 o I i N �I V20.00' \ \ \ of C- I \ 3 I o I m \ \ I~ 109 o I I I o S 0 \ \ \ w III I � I I I ��II ► \ - E N G I N E E R I N G 9233 WEST STATE STREET BOISE, IDAHO 83714 PHONE(208)639-6939 kmengllp.com PROJECT: 2 -C28EET NO. 1 F 2 I I I APEX WEST SUBDIVISION SEWER EXHIBIT I 0 200 400 600 Plan Scale: 1" = 200' 5/13/21 EXISTING SSMH #A1 RIM:2729.10 DEPTH:29.5' INV IN:2699.60 24" PVC I I I EXISTING SSMH #A2 RIM:2718.90 DEPTH:19.0' INV IN:2700.02 24" PVC INV OUT:2699.92 24" PVC I • I - • ��� s �\\~SSMH #A3 I RIM. 2716.98 / \ \DEPTH:16.7' \ \INV IN:2700.39 24" PVC \\\ �� \\\ \INV\UT:2700.29 24\ \VC� \�\ s \\SSMH #A6 \ \ / s \ - \�\ \\ `RIM:2718.37 \� - - - - - - - - - - - - + - - - - - - - - - - \ DEPTH:17.1' \ \ INV IN:2701.37 21" PVC \\ \\ INV OUT:2701.27 21" PVC` \\ \\ '\SSMH #A7 2"s s = s ��co \ \ 'RIM:2719.55 / DEPTH:18.1' INV IN:2701.55 21" PVC \ \ SSMH #62 - s - - - s s \ INV OUT:2701.45 21" PVC, \\ \ RIM:2717.18 \ SSMH #A8 DEPTH:12.4' \ \RIM:2719.42 INV IN:2704.86 12" PVC DEPTH:17.7' INV OUT:2704.76 12" PVC s INV IN:2701.83 21" PVC SSMH A4 .INV OUT:2701.73 21" PVC\ \ \\ \\ RIM:271.49 SSMH #A9 DEPTH:16.9' 2>>8 RIM:2718.51 INV IN:2700.80 21" PVC \ s DEPTH:16.5' INV IN:2701.55 12" PVC ( INV IN:2702.08 21" PVC INV OUT:2700.55 24" PVC 11 INV OUT:2701.98 21" PVC \\ \ \ \ \ I SSMH #A5 SSMH #A10 RIM:2716.77 \ RIM:2718.33DEPTH:15.9' DEPTH:16" PVC.1' I s INSTALL STALL STUB TO THE \ \ \ \ INV IN:2700.98 21" PVC INV IN:2702.37 21 INV IN:2702.06 8" PVC INV IN:2703.45 8" PVC i \\ \ INV OUT:2700.88 21" PVC INV OUT:2702.27 21" PVC 22 \ EAST ACROSS WILLIAMS \ \\ \ PIPELINE AT ONE OF \ \\ \ I \ THESE LOCATIONS \ \ \ \ \ \ \ \ SSMH #A11 I I `L�2 \ \ \ RIM:2723.05 DEPTH:20.2' I INV IN:2702.92 21" PVC I \\ \ I INV IN:2704.00 8" PVC I s 1 INV OUT:2702.82 21" PVC I -2722- ry 1 \ \ \\\\ J � � --2724- s \\ \ SSMH 12� -\ RIM:2727.88 \ \ \ � 2732 \ s s INV IN:2703.38 18" PVC \ \ \ r' z INV IN:2704.21 8" PVC s\ \ \ \ iv 34� \ s 2732 -2732 INV OUT:2703.3 21" PVC, \ \ \\ w I \ -\ -jf-, \ \ \ \ o JI2738 \ \ 2734_ s \ 2736 -�- 2734 \ \ \I \\ SSMH #A13\ r6; � \�\ RIM:2727.64 2738 DEPTH:23.7' i INV IN:2704.01 18" PVC1\\ \� \ 1 I 2��Z 2740� \ / \ � INV OUT:2703.91 18 PVC \✓ 1 \ ) / � 2j42- 1\ I \ \ I r \ \ \ \ \\\ \ 4p \ \ \ l/�U \ \� S 2744 �2�42 � \ \ - - SSMH #A14 \ (�e \\\ - \ - - RIM:2731.96 1 / DEPTH:27.5' \� \ \ \ \ \� '\ \ ✓ / �\ \ INV IN:2704.57 18" PVC/ \\ 2j46 \ { \ \ \ \ .INV OUT:2704.47 18" PVC ` \ I \ \ \\ s 2,42 \ I \ \ \ \\ I \ \ SSMH #A15 \ \ Ao\ \ 2>g� I \���� c \' \ / \ 1 / / �I RIM:2731.12 DEPTH:26.1' INV IN:2705.13 18" PVC INV OUT:2705.03 18" PVC SSMH #A16<`\\� s s RIM:2733.74 DEPTH:28.2' INV IN:2705.67 18" PVC INV IN:2706.50 8" PVC INV IN:2706.51 8" PVC I INV OUT:2705.57 18" PVC I I SSMH #A23 \ II \ \ \ \D PTH 29 8' \ \ \ I I \ \ ¢ \ s INV IN:2709.08 18" PVC \ \ I1 \ \ ( INV IN:2709.91 8" PVC \ \ \ II I \ SSMH A22 ( INV OUT:2708.98 18 PVC \ \ 1 III SSMH #A17 I s \ RIM:2737.44 I I \ \ \ \ 1 I I RIM:2732.45 SSMH #A24 DEPTH:26.4' DEPTH:28.9' RIM:2739.77 �� \ INV IN:2706.17 18" PVC INV IN:2708.62 18" PVC I s \ DEPTH:30.3' I \ \ INV IN:2709.46 8" PVC INV IN:2709.54 18" PVC \c I I INV IN:2707.00 8" PVC � � INV OUT:2706.07 18" PVC \ \ INV IN:2709.46 8" PVC I I INV IN:2710.37 8" PVC \c 11 i1 \\ \ \ INV OUT:2708.52 18" PVC I INV IN:2710.37 8" PVC \ \ \ \\\\ INV OUT:2709.44 18" PVC \\ \ \ \\ SSH 18 RIMM2732A44 s s s s s s s s \ c \ DEPTH:25.9' \ INV IN:2707.15 12" PVC INV IN:2706.65 18" PVC INV OUT:2706.55 18" PVC `- s SS H #A20 \\\\ SSMH #A19 SSMH A21' \ \\\\\ RIM:2733.80 # RIM:2732.51 RIM:2735.47 I I \\ \ \ \\ \\ \ DEPTH:26.3' ( \ \ I \ \�\ \\�\\� •l\ DEPTH:25.5' � DEPTH:27.4' INV IN:2707.64 18' PVC INV IN:2707.14 18" PVC INV IN:2708.13 18" PVC \ INV IN:2708.48 8" PVC SSMH #A25 I I INV OUT:2707.04 18" PVC \ INV OUT:2708.03 18" PVC RIM:2738.11 INV OUT:2707.54 18" PVC I I \ c \ \ l \ \ DEPTH:28.0' M v \ \ \ - \ IN:2710.20 18" PVC \� \ INV IN:2711.03 8" PVC s q�7 t k I I I hil A, 11 \ \ \ s s s INV OUT:2710.10 18" PVC I SSMH #A28 s s s I RIM:2739.77 \\ \ \ I DEPTH:28.3' \\ \\ \ \ INV IN:2711.52 18" PVC INV OUT:271 1.42 18" PVC EP _ _ - _ �_ Fa s= • EP- R/W R/W R/W R/W \�/ �=z- -EP EP EP EP S - - S g - - SSMH A29 ' - - - \ \ - - - - - ---_ - RIM:2739.41 SSMH A26 1I DEPTH:27.6' \ # 1 \ c \ I I \\\ RIM:2735.98 SSMH #A27 I I INV IN:2711.88 18" PVC \ \ c \ DEPTH:25.5' INV IN:2712.71 8" PVC \ \\ \ INV IN:2710.55 18" PVC RIM:2737.50 \ DEPTH:26.6' s INV OUT:2711.78 18" PVC \ \ \ \ I \\ I I INV IN:271 1.38 8" PVC INV IN:271 1.03 18" PVC \ \� INV OUT:12710.45 18" PVC INV OUT:2710.93 18" PVC LEGEND ----------------- 8" SEWER MAIN 10 SEWER MAIN 12 SEWER MAIN 15 SEWER MAIN DEVELOPER BRIGHTON 18 SEWER MAIN 21 " SEWER MAIN 24" SEWER MAIN E N G I N E E R I N G 9233 WEST STATE STREET 83714 SEWER MANHOLE BOISE, 208)6DAHO 9-693 PHONE(208)639-6939 kmengllp.com PROJECT: 21-028 1 SHEET NO. 1 OF 2 Joshua Beach From: Bill Parsons <bparsons@meridiancity.org> Sent: Friday, October 8, 2021 1:19 PM To: Joshua Beach Subject: RE: pre-app notes System has been updated. Bill Parsons,AICP I Planning Supervisor City of Meridian I Community Development Dept. 33 E. Broadway Ave., Ste. 102, Meridian, Idaho 83642 Phone: 208-884-5533 1 Direct: 208-489-0571 �fE ID Built for Business, Designed for Living All e-mail messages sent to or received by City of Meridian e-mail accounts are subject to the Idaho law, in regards to both release and retention,and may be released upon request unless exempt from disclosure by law. From:Joshua Beach <JBeach@brightoncorp.com> Sent: Friday, October 8, 2021 1:15 PM To: Bill Parsons<bparsons@meridiancity.org> Subject: Re: pre-app notes External Sender-Please use caution with links or attachments. Will do. Thank, Bill. Josh Beach On Oct 8, 2021, at 1:14 PM, Bill Parsons<bparsons@meridiancity.org>wrote: Good Afternoon Josh, If nothing has changed I don't see a need to meet again. With our new process, pre-application meeting notes are no longer required to be submitted with your application. Once you are ready to submit your application, please insert today's date as the date that you held your pre-application meeting and I will change the date in our system. Take Care, Bill Parsons,AICP I Planning Supervisor City of Meridian I Community Development Dept. 33 E. Broadway Ave., Ste. 102, Meridian, Idaho 83642 Phone: 208-884-5533 1 Direct: 208-489-0571 <image001.gif> 1 Built for Business, Designed for Living All e-mail messages sent to or received by City of Meridian e-mail accounts are subject to the Idaho law, in regards to both release and retention,and may be released upon request unless exempt from disclosure by law. From:Joshua Beach <JBeach@briBhtoncorp.com> Sent: Friday, October 8, 20219:30 AM To: Bill Parsons<bparsons@meridiancity.org> Cc:Alan Tiefenbach <atiefenbach@meridiancity.org>; Sonya Allen <sallen@meridiancity.orB>;Joseph Dodson <jdodson@meridiancity.org> Subject: pre-app notes External Sender-Please use caution with links or attachments. Bill, I'm prepping to submit two applications and it appears that the pre-app notes for both projects (Apex West and Quartet South) are over the 4 month limit. Nothing about the projects has changed since the pre-app meetings. Can I still use the attached pre-app notes for my submittal? Josh Beach I Assistant Project Manager-Entitlement BRIGHTON CORPORATION Brighton—Creating Great Places 2929 W. Navigator Dr., Suite 400, Meridian, ID 83642 Mobile 208.871.3812 brig htoncorp.com 2