Verizon SEC Meridian and Carlton CZC A-2020-0139Conditions Document
1
Verizon SEC Meridian and Carlton - CZC - A-2020-0139
CERTIFICATE OF ZONING COMPLIANCE
REPORT
DATE:
July 10, 2020
TO:
Eric Shaw, Powder River Development Services/on behalf of Verizon
Wireless
FROM:
Cameron Scott, Current Assistant Planner
SUBJECT:
Verizon SEC Meridian and Carlton - CZC (A-2020-0139)
Ada County Highway District
OWNER:
DESCRIPTION OF APPLICANT'S REQUEST
The applicant, Eric Shaw, requests Certificate of Zoning Compliance (CZC) approval to install
wireless equipment on an existing traffic pole in the right-of-way in the O-T zoning district.
Scope of work includes:
Three panel antennas
Three junction boxes
One power disconnect stand with power disconnect switch
The site is located on the southeast corner of N Meridian Rd. and W Carlton Ave.
DECISION
The applicant's request for Certificate of Zoning Compliance is approved with the conditions
listed in this report.
Note: This is not a building permit. Please contact Building Services at (208) 887-2211 to
verify if you need a building permit and/or inspection. If you do need a building permit, you
must complete that process before you commence the use or construction. Please contact
Building Services for additional details about building permits and inspections.
Process Conditions of Approval
1. The applicant shall complete all improvements related to public life, safety, and health
as set forth in UDC 11-5C-3B. A surety agreement may be accepted for other
improvements in accord with UDC 11-5C-3C.
2. The site plan prepared by Powder River Development Services on July 2, 2020, labeled
C-1, is approved by the City of Meridian Planning Division as shown in Exhibit B.
3. The elevations prepared Powder River Development Services on July 2, 2020, labeled
C-2 and C-3, are approved by the City of Meridian Planning Division as shown in
Exhibit C.
4. The approved site plan and/or elevations may not be altered without prior written
approval of the City of Meridian Planning Division.
5. The applicant shall pay any applicable impact fees prior to the issuance of a building
permit.
6. If any changes must be made to the site plan to accommodate ACHD requirements, the
applicant shall submit a new site plan to the City of Meridian Planning Division for
approval prior to issuance of the building permit.
Conditions Document
2
Verizon SEC Meridian and Carlton - CZC - A-2020-0139
Ongoing Conditions of Approval
1. The project is subject to all current City of Meridian ordinances and previous conditions
of approval associated with this site.
2. The issuance of this CZC does not release the applicant from any previous requirements
of the other permits issued for the site.
3. The applicant and/or assigns shall have the continuing obligation to meet the specific
use standards for the proposed use as set forth in UDC 11-4-3-43.
CITY COUNCIL REVIEW
The applicant or a party of record may request City Council review of a decision of the
Director. All requests for review shall be filed in writing with the Planning Division on or
before July 27, 2020, within fifteen (15) days after the written decision is issued, and contain
the information listed in UDC 11-5A-6B.
If City Council review of the decision is not requested, the action of the Director represents a
final decision on a land use application. You have the right to request a regulatory taking
analysis under Idaho Code 67-8003.
EXPIRATION
The Certificate of Zoning Compliance shall expire if the construction, alteration or the use has
not commenced within one year of the date of issuance of the Certificate of Zoning
Compliance.
In accord with the above provisions, the subject Certificate of Zoning Compliance is valid until
July 10, 2021.
EXHIBITS
A: Vicinity Map
B: Site Plan (dated: July 2, 2020)
C: Elevations (dated: July 2, 2020)
Conditions Document
3
Verizon SEC Meridian and Carlton - CZC - A-2020-0139
Exhibit A: Vicinity Map
Conditions Document
4
Verizon SEC Meridian and Carlton - CZC - A-2020-0139
Exhibit B: Site Plan (dated: July 2, 2020)
Conditions Document
5
Verizon SEC Meridian and Carlton - CZC - A-2020-0139
Exhibit C: Elevations (dated: July 2, 2020)