Loading...
TM Crossing Building (No. 4) CZC, DES A-2020-0126CERTIFICATE OF ZONING COMPLIANCE E IDIAN �' C� REPORT DATE: June 19, 2020 TO: Kindi Moosman, Horrocks Engineers, Inc. FROM: Stacy Hersh, Assistant City Planner SUBJECT: Ten Mile Crossing Office Building No. 4 - DES, CZC (A-2020-0126) OWNER: DWT Investments, LLC DESCRIPTION OF APPLICANT'S REQUEST The applicant, Kindi Moosman, requests Certificate of Zoning Compliance (CZC) and Administrative Design Review (DES) approval to construct a 45,000 square foot Women's Health Care Center office building on 3.897 acres of land in the C-G zoning district. The site is located at 3089 W. Navigator Drive. DECISION The applicant's request for Certificate of Zoning Compliance and Administrative Design Review are approved with the conditions listed in this report. Note: This is not a building permit. Please contact Building Services at (208) 887-2211 to verify if you need a building permit and/or inspection. If you do need a building permit, you must complete that process before you commence the use or construction. Please contact Building Services for additional details about building permits and inspections. General Conditions of Approval 100 Watt and 250 Watt, high-pressure sodium street lights shall be required on all public roadways per the City of Meridian Improvement Standards for Street Lighting. All street lights shall be installed at developer's expense. Final design shall be submitted as part of the development plan set for approval. Applicant shall also include the location of any existing street lights in the development plan set. Street lighting is required at intersections, corners, cul-de-sacs, and at a spacing that does not exceed that outlined in the Standards. The contractor's work and materials shall conform to the ISPWC and the City of Meridian Supplemental Specifications to the ISPWC. ➢ Streetlights shall be installed with the any public road improvements. Streetlights will need to be installed with the road or subdivision improvements. Streetlight plan requirements are listed in section 6-7 of the City's Design Standards. A copy of the standards can be found at, https://meridiancity.or2/land/Design%2OStandards%20- %2000M%20Adopted%20Final 5-19-16%20-%20CM.pdf Site Conditions of Approval 1. The applicant shall construct all proposed fencing and/or any fencing required by the UDC, consistent with the standards as set forth in UDC 11-3A-7 and 11-3A-6B. 2. All ground -level mechanical equipment must be screened to the height of the unit as viewed from the property line; all rooftop mechanical equipment must be screened as viewed from the farthest edge of the adjoining right-of-way Conditions Document 1 Ten Mile Crossing Office Building No. 4 — CZC, DES - A-2020-0126 Process Conditions of Approval 1. No signs are approved with this application. Prior to installing any signs on the property, the applicant shall submit a sign permit application consistent with the standards in UDC Chapter 3 Article D and receive approval for such signs. 2. The applicant shall complete all improvements related to public life, safety, and health as set forth in UDC 11-5C-3B. A surety agreement may be accepted for other improvements in accord with UDC 11-5C-3C. 3. Upon installation of the landscaping and prior to inspection by Planning Division staff, the applicant shall provide a written certificate of completion as set forth in UDC 11- 3B-14A. 4. The site plan prepared by Horrocks Engineer on June 15, 2020, labeled 1, is approved by the City of Meridian Planning Division as shown in Exhibit B with the following conditions: ➢ Per UDC 11-3a-19B.4, an unobstructed walkway at least 5' in width shall be provided for any aisle that is greater than two hundred (200') away from the primary building entrances; include the changes on the plans submitted with the building permit application. 5. The landscape plan prepared by Baer Design Group, LLC on June 12, 2020, labeled L 1.0 and L 1. 1, is approved by the City of Meridian Planning Division as shown in Exhibit C with the following conditions: ➢ Per H-2018-0114, Brighton Corporation will be responsible for completing the landscape improvements along W. Navigator Drive with the TM Crossing Subdivision No. 3 final plat improvements. ➢ Per UDC 11-3B-8C, the landscape buffer along the drive aisle on the southwest of this site requires one (1) tree every thirty-five linear feet and shrubs, lawn, or other vegetative cover (three (3) trees required); include the changes on the plans submitted with the building permit application. ➢ Per UDC 11-3B-8C, the parking lot landscape perimeter on the east side of this site (marked in red) requires one (1) tree every thirty-five linear feet mixed with the scrubs currently depicted on the landscape plan; include the changes on the plans submitted with the building permit application. 6. The elevations prepared by Cushing Terrell on April 3, 2020, labeled A-1, are approved by the City of Meridian Planning Division as shown in Exhibit D with the following notations: ➢ The applicant requests a design standard exception to the following Goal contained in the Architectural Standards Manual: Goal 2.1A "Buildings with rooflines 50-feet in length or greater must incorporate roofline and parapet variations. Variations may include step-downs, step -backs, other modulation, or architectural features such as cornices, ledges, or columns, and must occur in total combination for at least 20% of the facade length. May be averaged over entire facade, but may not exceed 75-feet without a break." The building parapets along some of the elevations occurs beyond the 75' to preserve harmony with a sleek modern building design. Staff finds that the courtyard on the north side of the site adds a pleasant pedestrian scale element to the building along with the modern design elements that include a mix of materials, fenestration, and landscaping next to the building that help to visually break up the facades that justifies an exemption from the Architectural Standards Manual. 7. The approved site plan, landscape plan and/or elevations may not be altered without prior written approval of the City of Meridian Planning Division. 8. The applicant shall pay any applicable impact fees prior to the issuance of a building permit. Conditions Document 2 Ten Mile Crossing Office Building No. 4 — CZC, DES - A-2020-0126 9. If any changes must be made to the site plan to accommodate ACHD requirements, the applicant shall submit a new site plan to the City of Meridian Planning Division for approval prior to issuance of the building permit. 10. The applicant shall complete all required improvements prior to issuance of a Certificate of Occupancy. It is unlawful to use or occupy any building or structure until the Building Official has issued a Certificate of Occupancy. 11. If the subject property is part of a final plat that has not yet recorded, the applicant shall be responsible for all plat improvements prior to release of Certificate of Occupancy for the first structure within such plat. 12. Prior to Certificate of Occupancy, the applicant shall submit a public access easement for the multi -use pathway(s) to the Park's Department for approval by City Council and subsequent recordation. 13. The City of Meridian requires that the owner enter into a Warranty Surety Agreement and post a Warranty Surety in the amount of 20% of the total construction cost for all completed public sewer and water infrastructure for a duration of two years. This surety amount will be verified by a line item final cost invoicing provided by the owner to the City. The surety can be posted in the form of an irrevocable letter of credit, cash deposit or bond, and must be in place prior to Certificate of Occupancy. Applicant must file an application for surety, which can be found on the Community Development Department website. Please contact Land Development Services for more information at 208-887- 2211. Ongoing Conditions of Approval 1. The applicant and/or assigns shall have the continuing obligation to provide irrigation that meets the standards as set forth in UDC 11-3B-6 and to install and maintain all landscaping as set forth in UDC 11-3B-5, UDC 11-313-13 and UDC 11-3B-14. 2. The project is subject to all current City of Meridian ordinances and previous conditions of approval associated with this site (CPAM- 12-00 1; AZ-12-005, DA #114002254; PP- 12-003; TED-14-001; MDA #2016-062220; MDA #2017-051907; FP H-2018-0114). 3. The issuance of this CZC does not release the applicant from any previous requirements of the other permits issued for the site. 4. The applicant and/or property owner shall have an ongoing obligation to prune all trees to a minimum height of six feet above the ground or sidewalk surface to afford greater visibility of the area. 5. The applicant shall have an ongoing obligation to maintain all pathways. 6. The applicant has a continuing obligation to comply with the outdoor lighting provisions asset forth in UDC 11-3A-11. 7. The applicant and/or property owner shall have an ongoing obligation to maintain all landscaping and constructed features within the clear vision triangle consistent with the standards in UDC 11-3A-3. CITY COUNCIL REVIEW The applicant or a party of record may request City Council review of a decision of the Director. All requests for review shall be filed in writing with the Planning Division on or before July 4, 2020, within fifteen (15) days after the written decision is issued, and contain the information listed in UDC 11-5A-6B. If City Council review of the decision is not requested, the action of the Director represents a final decision on a land use application. You have the right to request a regulatory taking analysis under Idaho Code 67-8003. Conditions Document 3 Ten Mile Crossing Office Building No. 4 — CZC, DES - A-2020-0126 EXPIRATION The Certificate of Zoning Compliance shall expire if the construction, alteration or the use has not commenced within one year of the date of issuance of the Certificate of Zoning Compliance. In accord with the above provisions, the subject Certificate of Zoning Compliance is valid until June 19, 2021. EXHIBITS A: Vicinity Map B: Site Plan (dated: June 15, 2020) C: Landscape Plan (dated: June 12, 2020) D: Elevations (dated: April 3, 2020) Conditions Document 4 Ten Mile Crossing Office Building No. 4 — CZC, DES - A-2020-0126 Exhibit A: Vicinity Map TMX Office 4 VICINITY MAP ¢ Parrak R1 i suuu;vu T � � w n,unruensn MaaoM io eaeax 000c smaysm ? •• sear rn�Fr w,a�owk ioeasrr0000 Nvx n ac ersnmr rnrn crr.>da nsmn Conditions Document 5 Ten Mile Crossing Office Building No. 4 — CZC, DES - A-2020-0126 Exhibit B: Site Plan (dated: June 15, 2020) LTJ PAVE MEW In Maw O�.Ti�O�w�F.i®oln=� YYiliWfiilYil�YLiP1f��Y Conditions Document 6 Ten Mile Crossing Office Building No. 4 — CZC, DES - A-2020-0126 In Maw O�.Ti�O�w�F.i®oln=� YYiliWfiilYil�YLiP1f��Y Conditions Document 6 Ten Mile Crossing Office Building No. 4 — CZC, DES - A-2020-0126 Exhibit C: Landscape Plan (dated: June 12, 2020) 4)" - —j o A.- em 00 U-0 UE C4\'PREH M D-39HRu' I DETAIL WATER FE M CGW� Conditions Document 7 Ten Mile Crossing Office Building No. 4 — CZC, DES - A-2020-0126 Exhibit D: Elevations (dated: April 3, 2020) Conditions Document 8 Ten Mile Crossing Office Building No. 4 — CZC, DES - A-2020-0126