CERTIFICATE OF ZONING COMPLIANCE
REPORT
DATE:
March 5, 2020
TO:
Daniel Jameson, TDS Broadband UT/NV
FROM:
Joseph Dodson, Current Associate Planner
SUBJECT:
TDS Metrocom - DES, CZC (A-2020-0043)
TDS Broadband UT/NV
OWNER:
DESCRIPTION OF APPLICANT'S REQUEST
The applicant, Daniel Jameson, requests Certificate of Zoning Compliance (CZC) and
Administrative Design Review (DES) approval of a new telecommunications utility building
and a 50’ monopole receiver tower on .662 acres of land in the I-L zoning district.
The site is located at 1050 N. Hickory Avenue.
DECISION
The applicant's request for Certificate of Zoning Compliance and Administrative Design
Review is approved with the conditions listed in this report.
Note: This is not a building permit. Please contact Building Services at (208) 887-2211 to
verify if you need a building permit and/or inspection. If you do need a building permit, you
must complete that process before you commence the use or construction. Please contact
Building Services for additional details about building permits and inspections.
ANALYSIS
The applicant has chosen to heavily screen the site due to the nature of the proposed telecom
utility building being a precast concrete building. Without the screening, this building would
not meet our design review standards. Staff has reviewed the fencing detail as well as the
landscape plans and approve this method of screening and design.
Site Conditions of Approval
1. The applicant shall construct all proposed fencing and/or any fencing required by the
UDC, consistent with the standards as set forth in UDC 11-3A-7 and 11-3A-6B.
2. The proposed driveway to N. Hickory Avenue does not meet ACHD policy on curb-cut
separations on collector roadways. However, ACHD staff recommends a modification
to the policy due to the low number of vehicle trip generations that will occur at this
site. The applicant shall construct the driveway as a curb return type driveway with a
20-foot wide curb cut located 30-feet north of the southern property line, per the ACHD
comment letter.
Process Conditions of Approval
1. No signs are approved with this application. Prior to installing any signs on the property,
the applicant shall submit a sign permit application consistent with the standards in
UDC Chapter 3 Article D and receive approval for such signs.
Conditions Document
2
TDS Metrocom - DES, CZC - A-2020-0043
2. The applicant shall complete all improvements related to public life, safety, and health
as set forth in UDC 11-5C-3B. A surety agreement may be accepted for other
improvements in accord with UDC 11-5C-3C.
3. Upon installation of the landscaping and prior to inspection by Planning Division staff,
the applicant shall provide a written certificate of completion as set forth in UDC 11-
3B-14A.
4. The site plan prepared by Power Engineers on 2/07/2020, labeled Grading and Drainage
Plan, is approved by the City of Meridian Planning Division as shown in Exhibit B.
5. The landscape plan prepared by Terry King Landscape Architecture on 2/07/2020,
labeled Site Landscape Plan, is approved by the City of Meridian Planning Division
with the following changes: At the time of building permit submittal, the landscape
plan shall be corrected to show additional vegetation within the retention basin in
accord with the provisions of UDC 11-3B-11.
6. The elevations prepared by Power Engineers on 2/07/2020, labeled Exterior Elevations
and Finish, are approved by the City of Meridian Planning Division as shown in Exhibit
D.
7. The approved site plan, landscape plan and/or elevations may not be altered without
prior written approval of the City of Meridian Planning Division.
8. The applicant shall pay any applicable impact fees prior to the issuance of a building
permit.
9. If any changes must be made to the site plan to accommodate ACHD requirements, the
applicant shall submit a new site plan to the City of Meridian Planning Division for
approval prior to issuance of the building permit.
10. The applicant shall complete all required improvements prior to issuance of a Certificate
of Occupancy. It is unlawful to use or occupy any building or structure until the
Building Official has issued a Certificate of Occupancy.
11. Prior to Certificate of Occupancy, the applicant shall record a reciprocating cross-
access/ingress-egress easement to the adjoining property to the north (Real Life
Ministries Church) and submit copy of said easement to the Planning Division in
accord with the provisions of UDC 11-3A-3A2.
Ongoing Conditions of Approval
1. The applicant and/or assigns shall have the continuing obligation to provide irrigation
that meets the standards as set forth in UDC 11-3B-6 and to install and maintain all
landscaping as set forth in UDC 11-3B-5, UDC 11-3B-13 and UDC 11-3B-14.
2. The applicant shall comply with the outdoor storage as an accessory use standards as set
forth in UDC 11-3A-14, if any were to occur.
3. The project is subject to all current City of Meridian ordinances and previous conditions
of approval associated with this site.
4. The issuance of this CZC does not release the applicant from any previous requirements
of the other permits issued for the site.
5. The applicant and/or property owner shall have an ongoing obligation to prune all trees
to a minimum height of six feet above the ground or sidewalk surface to afford greater
visibility of the area.
6. The applicant has a continuing obligation to comply with the outdoor lighting provisions
as set forth in UDC 11-3A-11.
Conditions Document
3
TDS Metrocom - DES, CZC - A-2020-0043
7. The applicant and/or property owner shall have an ongoing obligation to maintain all
landscaping and constructed features within the clear vision triangle consistent with the
standards in UDC 11-3A-3.
CITY COUNCIL REVIEW
The applicant or a party of record may request City Council review of a decision of the
Director. All requests for review shall be filed in writing with the Planning Division on or
before March 13, 2020, within fifteen (15) days after the written decision is issued, and contain
the information listed in UDC 11-5A-6B.
If City Council review of the decision is not requested, the action of the Director represents a
final decision on a land use application. You have the right to request a regulatory taking
analysis under Idaho Code 67-8003.
EXPIRATION
The Certificate of Zoning Compliance shall expire if the construction, alteration or the use has
not commenced within one year of the date of issuance of the Certificate of Zoning
Compliance.
In accord with the above provisions, the subject Certificate of Zoning Compliance is valid until
March 5, 2021.
EXHIBITS
A: Vicinity Map
B: Site Plan (dated: 2/07/2020)
C: Landscape Plan (dated: 2/07/2020)
D: Elevations (dated: 2/07/2020)
Conditions Document
4
TDS Metrocom - DES, CZC - A-2020-0043
Exhibit A: Vicinity Map
Conditions Document
5
TDS Metrocom - DES, CZC - A-2020-0043
Exhibit B: Site Plan (dated: 2/07/2020)
Conditions Document
6
TDS Metrocom - DES, CZC - A-2020-0043
Exhibit C: Landscape Plan (dated: 2/07/2020)
Conditions Document
7
TDS Metrocom - DES, CZC - A-2020-0043
Conditions Document
8
TDS Metrocom - DES, CZC - A-2020-0043
Exhibit D: Elevations (dated: 2/07/2020)