4- Building Summary-C2 100 Grandville, Suite 030, Grand Rapids, MI 49503 616.458.5554 henricksonap.com 1/8/2020 Re: Compass Charter School Building Summary • Project will be (5B) construction type consisting of wood framed roof joists, floor joists, and other support structures including exterior walls. • Non-load bearing interior walls will be metal stud. • This will be using an unprotected wood frame -thus not built to have a fire rating. • Building will be fully sprinklered. • This project will be submitted under the 2015 IBC effective 1 January 2018. • This location due to current wind speed maps WILL NOT require a mandatory storm shelter per section 423.4 2015 IBC. • Maximum building height allowed is 60ft (if sprinklered) above grade. • Maximum stories above grade is (2) two if sprinklered. • No separation is required between the main and accessory occupancies. Building Phase SF. Summary Building A (Existing) First Floor 32,981 sf. Building A (Existing) Second Floor 18,619 sf. Building B (Existing and Phase 2) First Floor 25,444 sf. Building B (Existing and Phase 2) Second Floor 23,462 sf. Existing Building 67,262 sf. Phase 2 New Construction 33,244 sf. Project Total Construction 100,506 sf.