Loading...
A002A002 OVERALL SECOND FLOOR PLAN JMV OVERALL SECOND FLOOR PLAN 1/16"=1'-0"50,104 S.F. TOTAL - PHASE 1 & 2 PROJECT No.191106 DRAWN BY: CHECKED:DSH 50% PROGRESS 12.13.19 90% PROGRESS 12.30.19COPYRIGHT 2019-ALL RIGHTS RESERVED. THIS DRAWING REMAINS THE PROPERTY OF HENRICKSON ARCHITECTURE AND PLANNING AND IS FOR USE ONLY AS AUTHORIZED BY HENRICKSON ARCHITECTURE AND PLANNING2325 Belmont Center Dr, Suite B Belmont, Michigan 49306 ph: 616.458.5554 NORTH BLACK CAT ROAD, MERIDIAN, IDAHO445 Pettis Ave., Suite 201Ada, Michigan 49301Ph: 616.682.6100NOT FOR CONSTRUCTIONPHASE 2OPEN TO EXISTING GYMNASIUM EXISTING MEZZANINE EXISTING MUSIC BG EXISTING HS-CR EXISTING HS-CR EXISTING HS-CR EXISTING CHEMISTRY EXISTING STOR. EXISTING SCIENCE EXISTING BROADCAST ROOM EXISTING ART ROOM EXIST. TEACHER'S WORKROOM EXISTING MATH EXISTING COMPUTER BG COMPUTER SCIENCE SCIENCE GIRL'S BOY'S 5TH 5TH 4TH 4TH SPED 4TH 4TH 5TH 5TH 6TH 6TH J.C.SCOTT'S OFFICE STO. EXISTING COMPUTER EXISTING CONTROL ROOM EXISTING DRAMA/MULTI-PURPOSE ROOM EXISTING OFFICE EXISTING OFFICE EXISTING OFFICE EXISTING OFFICE EXISTING ADMIN.EXISTING MATH EXISTING SOCIAL STUDIES EXISTING SOCIAL STUDIES EXISTING ENGLISH EXISTING ENGLISH 6TH PHASE 1 = 34,487 S.F.PHASE 2 = 15,617 S.F. 1 A300 1 A300 GIRL'S BOY'S RR 2 A300 2 A300 3 A300 3 A300 1 A200 2 A200 3 A200 4 A200 5 A200 4 A300 4 A300 5 A300 5 A300