Loading...
Bainbridge North DES (A-2020-0240) Page 1 DATE: 12/31/2020 TO: Jon Wardle Brighton Development, Inc. FROM: Stacy Hersh, Assistant Planner 208-884-5533 SUBJECT: A-2020-0240 Bainbridge North LOCATION: SEC of W. Chinden Blvd./SH 202-26 and N.Tree Farm Way (NE ¼ of Section 27, T.4N., R.1W.) I. PROJECT DESCRIPTION The applicant, Jon Wardle, requests Administrative Design Review (DES) approval for the single family attached dwellings proposed for construction within the Bainbridge North Development (Bainbridge Subdivision 11 and Bainbridge Subdivision 12) on 23.45 acres of land in the R-15 zoning district. II. DECISION The applicant's request for Administrative Design Review is approved with the conditions listed in this report. Note: This is not a building permit. Please contact Building Services at (208) 887-2211 to verify if you need a building permit and/or inspection. If you do need a building permit, you must complete that process before you commence the use or construction. Please contact Building Services for additional details about building permits and inspections. Site Specific Conditions of Approval 1. The applicant shall construct all proposed fencing and/or any fencing required by the UDC, consistent with the standards as set forth in UDC 11-3A-7 and 11-3A-6B. 2. No signs are approved with this application. Prior to installing any signs on the property, the applicant shall submit a sign permit application consistent with the standards in UDC Chapter 3 Article D and receive approval for such signs. 3. The applicant shall complete all improvements related to public life, safety, and health as set forth in UDC 11-5C-3B. A surety agreement may be accepted for other improvements in accord with UDC 11-5C-3C. CERTIFICATE OF ZONING COMPLIANCE REPORT COMMUNITY DEVELOPMENT DEPARTMENT Page 2 4. Upon installation of the landscaping and prior to inspection by Planning Division staff, the applicant shall provide a written certificate of completion as set forth in UDC 11-3B-14A. 5. The elevations prepared by Brighton Homes on October 11, 2020, labeled “Cadence at Bainbridge” – Radiance Plan 1 & Plan 2, Moonlight Plan 1& Plan 2, and Dublin Bay Plan 1 & Plan 2, are approved by the City of Meridian Planning Division as shown in Exhibit D. 6. The approved elevations may not be altered without prior written approval of the City of Meridian Planning Division. 7. The applicant shall pay any applicable impact fees prior to the issuance of a building permit. 8. If any changes must be made to the site plan to accommodate ACHD requirements, the applicant shall submit a new site plan to the City of Meridian Planning Division for approval prior to issuance of the building permit. 9. The applicant shall complete all required improvements prior to issuance of a Certificate of Occupancy. It is unlawful to use or occupy any building or structure until the Building Official has issued a Certificate of Occupancy. General Conditions of Approval 1. The applicant and/or assigns shall have the continuing obligation to provide irrigation that meets the standards as set forth in UDC 11-3B-6 and to install and maintain all landscaping as set forth in UDC 11-3B-5, UDC 11-3B-13 and UDC 11-3B-14. 2. The project is subject to all current City of Meridian ordinances and previous conditions of approval associated with this site (H-2018-0004, DA #2018-047368; MDA #2019-127583; H- 2019-0074 PP; H-2019-0125 FP). 3. The issuance of this DES does not release the applicant from any previous requirements of the other permits issued for the site. 4. The applicant and/or property owner shall have an ongoing obligation to prune all trees to a minimum height of six feet above the ground or sidewalk surface to afford greater visibility of the area. 5. The applicant shall have an ongoing obligation to maintain all pathways. 6. The applicant has a continuing obligation to comply with the outdoor lighting provisions as set forth in UDC 11-3A-11. 7. The applicant and/or property owner shall have an ongoing obligation to maintain all landscaping and constructed features within the clear vision triangle consistent with the standards in UDC 11- 3A-3. III. CITY COUNCIL REVIEW The applicant or a party of record may request City Council review of a decision of the Director. All requests for review shall be filed in writing with the Planning Division on or before January 15, 2021, within fifteen (15) days after the written decision is issued, and contain the information listed in UDC 11-5A-6B. If City Council review of the decision is not requested, the action of the Director represents a final decision on a land use application. You have the right to request a regulatory taking analysis under Idaho Code 67-8003. Page 3 IV. EXHIBITS A. Building Elevations (date: 10/11/2020) Page 4 Page 5 Page 6 Page 7 Page 8 Page 9 Page 10