Loading...
A-2.0_Campania_AFINISH FLOOR 100' -0" PEAK 119' -0 1/2" TOP PLATE 110' -0" UPPER PLATE 111' -0" T.O. STONE 114' -0" FINISH FLOOR 100' -0" PEAK 119' -0 1/2" TOP PLATE 110' -0" UPPER PLATE 111' -0" T.O. STONE 114' -0" FINISH FLOOR 100' -0" PEAK 119' -0 1/2" TOP PLATE 110' -0" UPPER PLATE 111' -0" T.O. STONE 114' -0" FINISH FLOOR 100' -0" PEAK 119' -0 1/2" TOP PLATE 110' -0" UPPER PLATE 111' -0" T.O. STONE 114' -0"4" / 1'-0"1/2" / 1'-0" 4" / 1'-0"4" / 1'-0"4" / 1'-0"4" / 1'-0"4" / 1'-0" PROFESSIONAL SEAL PROJECT NAME:PLOT DATE: JOB NO: DATE: DRAWN BY: SHEET NUMBER: COPYRIGHT ALL RIGHTS RESERVED. THIS DRAWING AND ALL INFO. CONTAINED HEREIN, IS THE PROPERTY OF ARCHITECTURE DESIGNS PLUS P.A., AND MAY NOT BE REUSED WITHOUT THE WRITTEN PERMISSION OF THE ARCHITECT 7/5/2021 1:19:15 PMBLING, LLC.BUILDING ACAMPANIA OFFICE COMPLEXEXTERIOR ELEVATIONSA-2.0 Author 21178 3/16" = 1'-0"5 WEST ELEVATION NO.REVISIONSDATE1FOR PERMIT06.03.213/16" = 1'-0"2 NORTH ELEVATION 3/16" = 1'-0"1 EAST ELEVATION 3/16" = 1'-0"3 SOUTH ELEVATION 1" = 10'-0"4 ROOF PLAN