Loading...
PZ - Landscape Plan PLANTING NOTES: Cushing 1. SEE GENERAL NOTES FOR ADDITIONAL INFORMATION. Terrell . 2 CONIFEROUS TREE 2. EVALUATE EXISTING SITE CONDITIONS AND REMEDY AS _ PLANTING REQUIRED TO PROVIDE FOR HEALTHY PLANT GROWTH AND c" 2 ASPHALT PATHWAY L501 DETAIL MITIGATE UNSIGHTLY CONDITIONS. cn RE: CIVIL 20' PUBLIC UTILITY 3. RE-GRADE, PREPARE SOIL AND PLANT ALL AREAS DISTURBED BY PROPERTY LINE, TYP. GRAVITY 1 DECIDUOUS (1)PC AND GATION CONSTRUCTION ACTIVITY. PLANT PER PLANTING PLAN. FOR IRRIGATION (1)TM (1) LIQ STY L501 TREE PLANTIN (1) LIQ STY (1) LIQ STY (1)SR (1) PC DISTURBANCES BEYOND PLAN, MATCH EXISTING PLANTS AND CUShlrl terrell.com / EASEMEN TYP. ACCESSORIES. SOD EXISTING IRRIGATED TURF DISTURBED BY 9 LINE, CONSTRUCTION ACTIVITIES..A DISTURBED AREA SHALL BE 800.757.9522 WHERE CONSTRUCTION ACTIVITIES INCLUDING TRENCHING, S IS ■ ` �\ GIR GIRR \ DEMOLITION, EARTHWORK, MATERIAL STORAGE, STAGING AND �- / PARKING OR ANY OTHER FORM OF EXCAVATION, COMPACTION, \ 18 S _ \ OR TRAFFIC RESULTS IN THE REMOVAL OR DISPLACEMENT OF D ) y - EXISTING GROUNDCOVER OR GRADE. PROVIDE SMOOTH AND Of (3)SR CLEAN TRANSITION BETWEEN EXISTING AND DISTURBANCES. q (1)TM (1)SR v 4. COLLECT A SAMPLE OF EXISTING AND ANY REQUIRED cv EXISTING - COMMON - 1 LIQ STY (3)SR SUPPLEMENTAL IMPORTED TOPSOIL AS SPECIFIED. cn STORM 5. PREPARE SUBGRADE AND PLACE TOPSOIL PER SPECIFICATION 1 LIQ DRAIN, AREA (1) UB 4:1 BERM (5)T 329113'SOIL PREPARATION' FOR PLANTING SOIL TYPE AND T LOT 5 p o �6P 16"5U 18"SD o o (1) UB 3' HGT (2)AA LOCATIONS. 0 10 ACHD GEMTONE 12 6. TURF/GRASS AREAS SHALL RECEIVE 6"OF TOPSOIL AND (1)AO o STORM LIGHTING o o MAX STORM ® CENTER PLANTER AREAS SHALL RECEIVE 6"OF TOPSOIL. AT PAVING IN I L _ DRAIN_ DRAIN, _ RE: ELEC., - - SHRUB/PLANTER AREAS BRING FULL TOPSOIL DEPTH TO WITHIN --- (1)MS EASEMENT�Y� GYP 3"OF FINISH GRADE TO ALLOW FOR MULCH. AT PAVING IN TURF F PROPERTY LINE, TYP. 12"SD - 12"Sp AREAS BRING FULL TOPSOIL DEPTH TO WITHIN 1-1/2"OF FINISH 20 x 0 12"SD 12"SD 12 12"SD GRADE TO ALLOW FOR SOD INSTALLATION. AT PAVING IN TURF SIG T AREAS BRING FULL TOPSOIL DEPTH TO WITHIN 3/4"OF FINISH � DISTANCE 10' LANDSCAPE � � GRADE TO ALLOW FOR SEED INSTALLATION. COORDINATE TRIANG&, BUFFER, TYP. (5)CED KAR TOPSOIL INSTALLATION WITH OTHER TRADES. CONTRACTOR cn TWII10.00' (1)AO O O°'� 6�O Aso 6� SHALL VERIFY CHARACTERISTICS OF TOPSOIL TO BE INSTALLED -7 AND DEPTH. AND AMEND AS REQUIRED TO GET PROPER CHARACTERISTICS - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 7. ALL PLANT MATERIAL SHALL RECEIVE ADEQUATE AMOUNT OF WATER TO MEET WATERING REQUIREMENTS SUPPLIED BY AN ° �W 8"W 8"W 8" 8' 81W B11w 811W 8,W 811W I AUTOMATIC UNDERGROUND IRRIGATION SYSTEM UNLESS NOTED OTHERWISE. SEE PERFORMANCE IRRIGATION PLAN AND - - - - - (1)AA NOTES. PRIOR TO PLANTING, IRRIGATION SYSTEM SHALL BE . . I - - (1) MS - (5)CED KAR I INSTALLED AND FULLY OPERATIONAL AND PLANTING AREAS THOROUGHLY SOAKED. COORDINATE WITH IRRIGATION 811W L - I I CONTRACTOR. 8. PROVIDE SMOOTH AND CLEAN TRANSITION BETWEEN ALL � I �, I TURF/GRASS TYPES, BOTH EXISTING AND PROPOSED. c" - (3)AM I 9. INSTALL PLANTINGS AND ACCESSORIES AS DETAILED AND PER PROJECT MANUAL SPECIFICATIONS. 10. MAINTAIN PLANTS AND TURF/GRASSES AS SPECIFIED PER 320190 ® 02 i OPERATION AND MAINTENANCE OF PLANTING. (3)AP Nu TREE, SHRUB, &PERENNIAL: I 1. PRIOR TO PLANTING INSTALLATION, CONTRACTOR TO CONTACT 3 SHRUB PLANTING ARCHITECT FOR PLANT INSPECTION AND PLANT LAYOUT PRIOR (4)SD L501 I 11 TO DIGGING PLANTING HOLES. 2. ALL PLANT MATERIAL SHALL BE INSTALLED AS DETAILED AND 6 PERENNIAL SITE n CONFORM TO THE CURRENT AMERICAN NURSERY AND L501 PLANTINGS LIGHTING LANDSCAPE ASSOCIATION STANDARD FOR NURSERY STOCK. ` o RE: ELEC., I EXISTING 3. CONTRACTOR SHALL VERIFY ALL PLANT QUANTITIES. THE FENCE, TYP. ILLUSTRATED LOCATION SHALL DICTATE COUNT. 7° 12 0 O 12 TYP. RE: CIVIL L 4. NO PLANT SUBSTITUTIONS WILL BE ALLOWED WITHOUT WRITTEN ° (1)TM O 00 CONSENT FROM THE LANDSCAPE ARCHITECT. (1)TM� I 5. PROVIDE ORGANIC MULCH AS NOTED IN LEGEND IN PERENNIAL BEDS AND TREE RINGS. SUBMIT SAMPLES AS SPECIFIED. (2)SD I (1)AA MODIFY FINISH GRADE ADJACENT TO WALKING SURFACES TO PREVENT MULCH FROM MIGRATING DURING RAIN EVENTS. N 6. INSTALL WEED BARRIER FABRIC IN ALL PLANTERS, EXCEPT o (5)CC I PERENNIAL AREA,AS DETAILED AND AS SPECIFIED. 7. EDGING AS DETAILED AND SPECIFIED. FOR COMPACTED AREAS cn I III (PREVIOUSLY PAVED/HARDPAN AREAS), SCARIFY SOILS AS cn o 00 < SPECIFIED AND MODIFY PLANTING PIT AS SPECIFIED&DETAILED. ` BICYCLE 8. IF SUBSOIL CONDITIONS SHOW EVIDENCE OF UNEXPECTED PARKING I WATER SEEPAGE OR RETENTION NOTIFY LANDSCAPE TYP. (5)CC ICYbLE ARCHITECT IMMEDIATELY AND MITIGATE AS REQUIRED. R ARMING, 9. WARRANTY PLANT MATERIAL AS SPECIFIED. w (3)SD YP•I (3)AO PERFORMANCE IRRIGATION NOTES: S E. I I _- CIVIL 1. SEE GENERAL NOTES AND PLANTING PLAN. 2. CONTRACTOR TO DESIGN AND INSTALL UNDERGROUND w "� I 12 AUTOMATIC IRRIGATION SYSTEM TO PROVIDE ADEQUATE WATER FOR ALL PLANT MATERIAL AS SHOWN ON L301. SCHEMATIC -4) LAYOUT IS PROVIDED. INSTALL MANUAL DRAINS (X/LXXX) AT LOW (1)AA POINTS AND AIR RELIEF VALVES (X/LXXX)AT HIGH POINTS ALONG (2)SD L - - �� MAINLINE (X/LXXX). INSTALL QUICK COUPLERS (X/LXXX)AT END OF U) \ MAINLINE AND ISOLATION VALVES(X/LXXX) DOWNSTREAM OF 12 I I 12 NEW WAREHOUSE MAINLINE TEES. w 3. IRRIGATION SYSTEM WATER SOURCE IS DOMESTIC FROM ('(1)TM BUILDING WITH BACKFLOW PREVENTER PROVIDED BY PLUMBING � I - - - - J S CONTRACTOR. SEE PLUMBING FOR POINT OF CONNECTIONS& c" y FOUNDATION WALL PENETRATION. c I I 4. CONTRACTOR TO VERIFY AVAILABLE GALLONAGE AND PRESSURE. DESIGN IRRIGATION SYSTEM BASED UPON AVAILABILITY. 5. PROVIDE CONTROLLER LOCATED ON EXTERIOR WALL OF iv I BUILDING AS SHOWN ON PLAN. COORDINATE WITH ELECTRICAL / FOR CONDUIT THROUGH BUILDING. 6. IN THE EVENT OF ANY DISCREPANCIES, NOTIFY THE OWNER'S PR PERT 9 og I y 7. PROPOSED PLANTERING BEDS SHALL BE WATERED BY IN-LINE LINE 8"SD sD EMITTER DRIP(SEE GENERAL SCHEMATIC DRIP LAYOUT(X/LXXX)), WITH DRIP ZONE CONTROL KIT((X/LXXX)). PROVIDE PVC J (3) PM LATERALS TO BEDS AND CONNECT TO DRIP LINE AS NOTED AND (3)SD (3)AP DETAILED. 8. CONTRACTOR SHALL PROVIDE SLEEVING FOR PIPE BELOW W N SITE o PAVEMENT. SLEEVE PER LEGEND. SUPPLY ONE EXTRA SLEEVE WITH EACH MAINLINE SLEEVE FOR CONTROL WIRES. (n I I[�HTI I COORDINATE SLEEVE INSTALLATION WITH OTHER TRADES AND RE: EC., OTHER PROJECTS. 9. IRRIGATION SYSTEM SHALL BE INSTALLED IN STRICT (2)i D I I ACCORDANCE WITH ALL PERTINENT CODES AND REGULATIONS, O THE REFERENCED STANDARDS,AND THE MANUFACTURER'S RECOMMENDATIONS. o (1) MS w (1)AA 12 10. ZONES TO BE DESIGNED WITH REGARD TO PLANT MATERIAL AND T III WIND AND SUN EXPOSURE TO ENSURE PROPER PLANT REQUIRED i WATER COVERAGE. 11. PROVIDE ALL COMPONENTS REQUIRED FOR PROPER LU WINTERIZATION OF SYSTEM. (1) MS I 12. PRIOR TO IRRIGATION MAINLINE TRENCH BACKFILL, CONTRACTOR TO CONTACT ARCHITECT FOR MAINLINE PRESSURE TEST. cn - - - - -1 13. PROVIDE FIVE COPIES OF SCHEMATIC LAYOUT PRIOR TO "20'x 2 ' I 10'1ANDSCAPE I I MATERIAL PURCHASE AND THEN FINAL SHOP DRAWINGS FOR SIG h0.00', BUFFER LI "_' WRITTEN APPROVAL. SEE SUBMITTAL REQUIREMENTS FOR DI TANC E I I BICYCLE o ADDITIONAL INFORMATION. TRIANGL I 14. INSTALL IRRIGATION SYSTEM AS DETAILED AND SPECIFIED. I - PARKING, TYP. (6)AT ao >= I ° III BICYCLE i PLANTING LEGEND ® 3O PARKING, TYP. I � TURF- SOD, � - I MP ROTATOR/ROTARY IRRIGATION O (1)MS cn 1 O I I SHRUB AND PERENNIAL J O12 I PLANTING BED - ORGANIC N 2 ® 10 ® 11 I 041 MULCH + COMPOST- DRIP N V ® BICYCLE I IRRIGATION, SEE DETAILS O _ _UNDERGROUND -> (1)LIQ STY o r- (1)LIQ STY -OWER (1)GI T PHONE �' (3)ACE EME _ _ PARKING 1 MS I EDGING - SHOVELCUT (1)GI 02"SD o NE, TYP. (1)GI n (1)GI (� I (3)AO (4)SD 1 FRA URB - -(1)GI ® R€ r' I E: CIVIL PROPOSED o o 12"SD ERM (1)GI o 12"SD 12"SD I o o I I O - - CROSSWALK, o g (1)ACE TGN (2)ACE TGN WATER TYP. - (1)GI _LOGT., (1)GI ® I (1)MS (1)MS DECIDUOUS TREE PLANTING - ° (1)SR LINE, Y RE: CIVIL (1) MS TYP. 10' PUBLIC I C LARGE, SEE DETAIL ♦♦�r���rrr�i 10 R : C (2) PIN EA1 (2)CED KAR U ILITY, DRAIN GE (3)PXR CRI I DRIP IRRIGATION IN PLANTER ,+��P�E Id4I`� (1) MS 12 SE ER &S RE T LIGHT12 I BED n o ° ' PROPOS • (1)SR O T, P. E: IVI - - o SIDEWAL o _ rj DECIDUOUS TREE PLANTING - Q Z UGP P i I SMALL, SEE DETAIL i UGP DRIP IRRIGATION IN PLANTER U U '� 0o BED i LA-16677 - - . - - - P T T -T �- � _ T i U P i- p doll ° 3:1 BERM ° (1)SR O FRA URB - - _ ~ y (3)CED CED City F MER1DrPCN ° (1)SR ° (2)CED CED- _ - _ _ _ _ _ _ 1 CONIFEROUS TREE �I PLANTING, SEE DETAIL rrr�III`♦ 3' HGT., (1)FRA URB I - (3)PRU CRI SITE 2 PIN STR (1)SR O 2 x 20' DRIP IRRIGATION IN � EX STING (1) FRA URB RE: CIVIL ( ) 1 FRA URB TYP. (1) FRA URB LIGHTING 2 CED CED PLANTER BED © 2020 I ALL RIGHTS RESERVED 20' x 20' - I O IGHT R • SIDEWALK, 20' LANDSCAPE oo RE: ELEC., S 12"SS 12"S 1 2"SS TY ISE §I�FER, TYP. �� cn �� c „ o „ TYP. 12 SS - 2"SS 12"SS 12"SS S DI T NCE 12"W �IANGLE, N. H I CKORI�AVE T A TYP. 101 LE, iZ SS 12"SS �J DRIP UIRRIGATION SEE DETAIL � 121�V 12 W � � 1211W M2 L M2 M2 L 12"W O PERENNIAL PLANTING - FLOWERING OR ORNAMENTAL GRASS DRIP IRRIGATION 10.07.2020 G &/W G R/W GR/W G G G G G G G G G G G G G G G G G G G G G G G G __ G - - ________^ R/W R/W p R/W R/W R��'� R/W R/W RAN p R/W R/W R/W R/W R/W R/W R/v�r DRAWN BY I HANSEN 1 i LANDSCAPE BERM 3:1 SLOPE 3' HGT. CHECKED BY I ROSA 0 30 60 1 90 120 feet ------ REVISIONS co 09.25.2020 Addendum#2 cn ccn 0 1" = 30' PLANTING PLAN - SCALE: 1" = 30'-0" PLANTING PLAN L301 06.29.17 11:08 PM L:\HOT2_YANKEWH\BIMCAD\LandArch\HOT2_YankeWhse_L301.dwg