Loading...
PZ - Phasing Plan Updated�a mmn►±111111111 ini� ■ om PHASE 3 COMPLETE IN 8-10 YEARS T' 1PA WWE A.C. PATH BLACK CAT BUSINESS CENTER - PHASING PLAN MERIDIAN I IDAHO SITE PLAN - SCHEME -13 1-100,01 100 0 IN 200 300 GENERAL NOTES: _ 1. PROPERTYLNE BEAM- AND DISTANCES AS WELLASSITE AREA CALCULATIONS ARE PROVIDED FOR LOMNG AND FERMI REMW ONLY, REAL PROPERTY LEGAL DESCRIPTIONS AND AREA CALCULATIONSME TO BE PROVIDED BY A REGISTERED PRGFFFSIONAL SURVEYOR AREA SUMMARY: GROSS SITE AREA, 5273.6M SOFT, 121.05 ACRES 1•1-I STREET DEDMATNON MEA 2W.1M SOFT. 5.93 ACRES(./-) NET DEVELOPED AREA SM5A03 SOFT, 116.13 ACRES (.A) PARCEL (AI ?A5.239 SOFT, 14.15 ACRES(./-) PARCEL IBI SITE EA AREA 2.058.788 SOFT. 47.22 ACRES IH-) SUB TOTAL AREA 4,]0;007 SOFT, 95.78 ACRES HI-) PARCEL (C) SITEMEA 117,435 SOFT, 2.56 ACRES I.A) PARCEL (D) SITE MEA i 342,832 SOFT, 7.57 ACRES (-/-) PARCEL (E) WE AREA 2ST 128 l . 5.81 ACRES (.I-1 SUB TOTAL WEARER: 713,306 SOFT, 18.31 ACRES (H-1 GRANDTOTALSITEAREA 5,015.433 SOFT, 116.13 ACRES(H-) BURDINGA 283.290 SOFT. 13% COVERAGE BUILDING 188.680 SOFT. 9% COVERAGE BUILDING C 165,40D SOFT m COVERAGE BURDING D 145,800 SOFT, 5% COVERAGE BDRDING E. 149.780 SOFT, 7% COVERAGE BUILDING F: 247,WD SOFT, 12% COVERAGE BURDING G: 221,73D SOFT. tt%COVERILGF BUILDING H. 302,180 SOFT. 17% COVERAGE BUILDING J', 131.820 SOFT, 5% COVERAGE TOTAL WILING MEA "'Al1SOFT, M%COVERAGE BUILDING Kt: 10,000 SOFT. BUILDING Lt'. 17,000 SFT, BUILDING L2. 17,000 SOFT. tT,9W SGFT BUIIgNG U' 17,000 $GFT. BUILDING L5: SRW SOFT, BUILDING MI 33MD SOFT, TGTAI BURDING AREA. 116,OW SOFT, �b industrial ,�y a SAWTOOTH DEVELOPMENT GROUP VLMK ENGIN EERING^+ DESIGN