Loading...
G1.01 - COMPOSITE SITE PLANIV IV IV IV IV IVIV IVIV IVIV IV IV IV IV IV IV MTRMTRCO CO CO CANOPY:CALIPER: CANOPY:CALIPER: CANOPY:CALIPER:CANOPY:CALIPER: CANOPY:CALIPER: CANOPY:CALIPER: SD CO SD CO SD MW MW MW MW GMTR CO COMW 3'(typ. sides & back)10.96' 10'2" 10'2" 10'2" 10'2" 10'2" 10'2" GENERAL NOTES A. PRIOR TO START OF CONSTRUCTION, CONTRACTOR TO VERIFY POSITION AND CONDITION OF ALL EXISTING BENCHMARKS. B. EXISTING BENCHMARKS ARE NOT TO BE DISTURBED. C. COORDINATE WITH CIVIL FOR GRADING AND DRAINAGE ELEVATIONS. D. ANY DISCREPANCIES IN ACTUAL FIELD CONDITIONS, IF AT ODDS WITH INDICATIONS IN THESE DOCUMENTS, SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ARCHITECT OR CONSTRUCTION MANAGER. E. FOR THE SOILS INVESTIGATION REPORT OF THIS SITE, REFERENCE PART 'C'-GEOTECHNICAL INFORMATION IN THE SPECIFICATIONS. COPIES OF THE SOILS INVESTIGATION REPORT ARE AVAILABLE FROM THE CONSTRUCTION MANAGER, THE GEOTECHNICAL ENGINEER, AND THE ARCHITECT. F. ALL ROAD/UTILITY IMPROVEMENT WORK WHICH IS INTERRELATED WITH SIMILAR WORK ON ADJACENT PROPERTIES SHALL BE FULLY COORDINATED BETWEEN CONTRACTORS. VERIFY WITH CONSTRUCTION MANAGER. G. FINAL POSITIONING OF ALL SITE FIRE UTILITIES SHALL BE SUBJECT TO THE APPROVAL OF THE APPROPRIATE FIRE AUTHORITIES. CONTRACTOR SHALL VERIFY. H. IN CASE OF CONFLICT BETWEEN ARCHITECTURAL & CIVIL DRAWINGS, AS TO EXACT LOCATIONS/EXTENT OF CAST-IN-PLACE CONCRETE CURBS ONLY, VS CAST-IN-PLACE CURB/GUTTER, CIVIL DRAWINGS SHALL GOVERN. C.I.P. CONCRETE CURB WORK INCLUDED AS PART OF PREVIOUS BID PACKAGE (COORDINATE WITH CIVIL DRAWINGS) C.I.P. CONCRETE CURB/GUTTER WORK INCLUDED AS PART OF PREVIOUS BID PACKAGE (COORDINATE WITH CIVIL DRAWINGS) SWINGING GATE PROPERTY LINE FENCING PROPERTY LINE CORNER PIN MONUMENT LEGEND PHASE 2 (N) HARD TOP PAVING (E) HARD TOP PAVING (N) BUILDING (N) CONCRETE (E) CONCRETE (N) LANDSCAPE AREA, RE: LANDSCAPE PLANS (E) LANDSCAPE AREA, RE: LANDSCAPE PLANS EAST CENTRAL DRIVE IDAHO FINE ARTS ACADEMY PHASE 1 IDAHO FINE ARTS ACADEMY PHASE 2 FF -100' -0" = CIVIL ELEV. 2,626' -0" BUILDING AREA: 41,418 SF R9'27' - 5 71/128"FIRE TRUCK (AERIAL APPARATUS)R 28' - 0"23' - 11 21/128" R 31' - 6"APPARATUS ACCESS150' - 0"60' - 3 217/256" R 30' - 0 23/128"R 29' - 11 237/256"32.07 (3 RACKS, 6 STALLS) 32.01 HYDRANT SPACING 2 5 0 ' - 0"32.08 104413.G 10.03 EDDIE D. DANIELS AR-2606 OHADI,ESI OBLICENSE D A RCHI TECTSTATE O F ID AH OP r o j e c t : S h e e t : P r o j e c t N o : D r a w n B y : C h e c k e d B y : D a t e : R e v i s i o n s : S h e e t N o : E D C B A 1 2 3 4 5 6 9/29/2020 12:13:27 PMIDAHO FINE ARTS ACADEMY 915 EAST CENTRAL DRIVE MERIDIAN, ID 83642 COMPOSITE SITE PLAN 19008 TH ZL 9/29/2020 G1.01BID SET -08/24/20REFERENCE NOTES 10.03 COORDINATE EXACT LOCATION WITH FIRE MARSHALL PRIOR TO INSTALLATION 32.01 NEW FIRE HYDRANT. RE: CIVIL DRAWINGS 32.07 NEW BIKE RACKS. RE: CIVIL DRAWINGS. 32.08 FDC KEYNOTES 104413.G KNOX BOX 1" = 40'-0"G1.01 A2 SITE PLAN NORTH2 DBS BACKCHECK 02 09/28/20 THIS PATHWAY TO BE AMENDED FROM PHASE 1 OF THE PROJECT AND TO BE INSTALLED DURING PHASE 2, PER RECOMMENDATION FROM KIM MEYERS WARREN, PATHWAYS PROJECT MANAGER FOR THE CITY OF MERIDIAN. PLEASE REFER TO EMAIL DOCUMENTATION FROM SEPTEMBER 24TH, 2021 - "0924_2021_IFAA_PATHWAY AMENDMENT CORRESPONDENCE".