Loading...
Landscape completion letterBECK AND FO BAIRD B LANDSCAPE ARCHITECTURE PLANNING & URBAN DESIGN 07 May 2014 Meridian Planning Division Meridian City Hall 33 E. Broadway Suite 102 Meridian, Idaho 83642 Attention: Planning Staff Regarding: Carl's Junior, Meridian Rd & Overland Rd, Meridian Idaho To Whom it may concern, I have visited the completed site of the new Carls Junior in Meridian and can certify that the landscape and irrigation has been installed to my satisfaction and meeting the submitted design approved by your department with the following changes during construction: 1. A bike rack was added at the front of the building which required us to remove (2) shrubs from the front but the bike rack change was approved. 2. The lawn area in back was removed and in its place is additional planter bed with the addition of (18) blue chip juniper and (3) photinia. This still meets the intent of the area while reducing maintenance and water usage. It also meets the requirements of Idaho Power and its transformer located near the location. 3. A substitution for the (3) of the September Golden Rain Tree (lack of availability) to (3) Red Sunset Maple (Acer Rubrum `Franksred')0 After visiting the site for a certification of the completed landscape, I am writing to advise that I cannot certify the landscape complete per plans and specifications at this time and following are the deficiencies that need to be corrected before I can certify this landscape: I am attaching an 11x17 plan for reference and a sketch of the plant material substituted for the lawn area. Sincerely, Jim Mihan, LLA, ASLA Project Landscape Architect Cc: Scott Stimpson, Jason Smith voaao O PRUNE ALL DEAD AND INJURED 8' X 2" X 2" STAKE (1 EA. TREE) WOOD. DO NOT CUT LEADER COTTON WEBBING OR PLASTIC COVER WITH MULCH, t e TREE TIE TAPE TIE WITH COTTON WEBBING OR PLASTIC TREE TIRE TAPE BRUSH AWAY FROM STEM L S 8' X 2" X 2" STAKES, 2 PER TREE. STAKING TURN BACK BURLAP, TOP Y2 OF 3" WELL Z BALL. KEEP GROUND LINE NOT REQUIRED FOR TREES #15 SAME AS NURSERY TURN BACK BURLAP, LO AND SMALLER o TOP Y3 OF BALL. KEEP o CONSTRUCT 4" EARTH CONSTRUCT 4" EARTH I GROUND LINE SAME z BERM SAUCER. WRAP TRUNK BERM SAUCE, FILL WITH AS NURSERY FILL WITH MULCH MULCH — PLANTING SOIL Q42 TURN BACK BURLAP, TOP Y3 OF BALL, PLANTING SOIL III B- o E NOTE: w ? KEEP GROUND LINE SAME AS NURSERY, NOTE: NOTES: 1, DIG HOLE 4X THE DIAMETER OF ih 1. DIG HOLE 4X THE SIZE OF 1 • DIG HOLE 3X THE SIZE OF ROOT BALL. U o QE ROOT BALL. N PLANTING SOIL ROOTBALL, EXCEPT WHERE 2. ALL PLANTING AREAS TO BE COVERED L�J NOTED. WITH MULCH, U DECIDUOUS TREE PLANTING CONIFEROUS TREE PLANTING SHRUB PLANTING a N NOT TO SCALEC NOT TO SCALE NOT TO SCALE qs E � o N ® This document is��th��a�p roperty of erstad ARCHiTE g and is protected by U.S. and international laws. Use, reproduction or modification of this document without first obtaining the written permission of Lz eretad arcNtects is prohibited. This document may not be used in any unauthorized manner. 02013 r� N EXISTING TREE TO REMAIN, INSTALL CONSTRUCTION F CING Q �0 AROUND DRIP LINE TO PROTECT DURING CONSTRUCTI el Q 00 q �� d U � 0 r` a W Z VISION TRIANGLE d Q ca IM t— LO W ® ® cc .'....'...'... f T L o Q ............. Z ........................ IT P/z o PROJECT: 121204 DATE: 09/06/13 \iZC design review lB l� BAT CE'_CRP" a)adU Srs Ne.3m.gEia Elidd Ea, EXISTING LANDSCAPE BUFFER INSTALLED IN PRIOR APPROVED PROJECT TO REMAIN EXISTING TREE TO REMAIN. INSTALL CONSTRUCTION FENCING AROUND DRIP LINE TO PROTECT DURING CONSTRUCTION. SHEET TRLE: LANDSCAPE PLAN SHEET NWbEk Reba Aeagz L 1.0 P.O. By 7423 z Bute :. lab : 12707 0 20' 40' 60' en salemes2 (:).LLANDSCAPE PLAN s2aw.Ress_Baee eeo immBSCALE: 1"=20'-0" P ECTN EH IM�ciae3lNB„ B NORTH FarXM42J342 BECK AND BAIRD LANDSCAPE ARCHITECTURE ww.��ra.aw PLANNING & URBAN DESIGN DECIDUOUS TREE SCHEDULE (Shown 75i of full size on plan & schedule) SYMBOL COMMON NAME / PLANTE MATURE BOTANICAL NAME SIZE SIZE Bradford Pear 2.0" CAL 25"WX35'H Pyrus caileryana 'Bradford' (Gloss I) September Golden Rain Tree 2.0° CAL 25"WX35'H Koelreuteria paniculata September' (Class I) SHRUB SCHEDULE (Shown at full size) SYMBOL COMMON NAME BOTANICAL NAME PLANTED MATURE SIZE SIZE Dwarf Burning Bush 2 GAL 4'WX4�H Euon us Fortuneii Com acta a Crimson Pygmy Barberry 'Crimson ' 2 GAL 3�WX3�H Berberis thunber ii Pygmy O Red Star Potentillc 2 GAL 4'WX3'H Potentillc Fruiticosa 'Red Star' O Pink Carpet Rose 2 GAL 4'WX2'H Rosa x Noatraum Red Robin Photinia 5 GAL 5�WX5'H Photinia fraseri 'Red Robin' Pruned � Rainbow Drooping Fetterbush 'Nana' 2 GAL 4'WX2'H Leucothoe Fontanesiana ® Blue Rug Juniper 2 GAL 4'WXl'H Juni erus Horizontalis 'Blue chip' ® Blue Shag Eastern White Pine 'Blue 2 GAL 4�WX3'H Pinus Strobus Shag' Tallhedge Alder 5 GAL 4'WX12'H Rhamnus fran ula Royal Star Magnolia 5 GAL 8'WX10'H Magnolia Stellaia 'Royal Star GROUNDCOVER SCHEDULE Existing lawn to remain Sodded Lawn: Tall Type Dwarf Fescue, locally grown, minimum of 1 year old Groundcover mulch: 3" depth of 1" minus bark mulch over Typar weed barrier fabric LANDSCAPE MATERIALS Landscape Edging: 4"x6" concrete curbing. Separate all lawn areas from planting beds with landscape edging. See Spec's for further information.