Loading...
PZ - Geotech Report Geotechnical Engineering Report James Ranch Subdivision Meridian, Idaho PREPARED FOR: Walsh Group PREPARED BY: Innovate Geotechnical Innovate Geotechnical Project No. 321026 May 12, 2021 INNOVATE GLOTLCHNICAL mEn INNCIVATE GEUTECHNICAL Page 1 of 14 May 12, 2021 Walsh Group Attention: Kelli Black Subject: Geotechnical Engineering Report James Ranch Subdivision Meridian, Idaho Innovate Geotechnical Project No. 321026 Kelli, Submitted herewith is the report of our geotechnical engineering evaluation for the subject site. This report contains the results of our findings and an engineering interpretation of the results with respect to the available project characteristics. It also contains earthwork and site improvement recommendations necessary for development of the property. On April 13, 2021, Innovate Geotechnical staff was on-site and completed 16 test pits up to 10.5 feet below the existing ground surface. Soil samples were obtained during the field operations and were then transported to our office for further testing. Based on the findings of the subsurface investigation and other information, site earthwork and development recommendations are provided. A detailed discussion of observed conditions is presented in this report. We appreciate the opportunity to work with you on this project. If we can be of further assistance or if you have any questions regarding this project, please do not hesitate to contact us at (208) 484-1090. AL Sincerely, G� Innovate GeotechnicalCC 14 S, Sierra Hyde Seth P. Olsen, P.E. Engineering Intern Senior Geotechnical Engineer GEOTECHNICAL ENGINEERING 1550 S Cloverdale Rd Suite#201 BOISE,ID (208)484-1090 mEn INNI]VATF GEOTECHNICAL Page 2 of 14 Table of Contents 1.0 INTRODUCTION.................................................................................................................... 3 2.0 PROJECT UNDERSTANDING .............................................................................................. 3 3.0 SCOPE OF SERVICES............................................................................................................ 3 4.0 SITE CONDITIONS AND FIELD EVALUATION................................................................4 4.1 Surface Conditions....................................................................................................................4 4.2 Field Evaluation........................................................................................................................4 4.3 Subsurface Soil Profile ............................................................................................................. 5 4.4 Infiltration Testing.................................................................................................................... 6 4.5 Groundwater............................................................................................................................. 6 4.6 Site Subsurface Variations........................................................................................................ 8 4.7 Seismic Setting.......................................................................................................................... 8 5.0 CONCLUSIONS AND RECOMMENDATIONS................................................................... 8 5.1 Site Preparation and Earthwork................................................................................................ 8 5.2 Structural Fill............................................................................................................................ 9 5.3 Fill Placement and Compaction.............................................................................................. 10 5.4 Slopes...................................................................................................................................... 10 5.5 Foundation Support................................................................................................................. 10 5.6 Floor Slabs.............................................................................................................................. 11 5.7 Drainage.................................................................................................................................. 11 5.8 Pavement................................................................................................................................. 12 5.9 Infiltration............................................................................................................................... 13 6.0 QUALITY CONTROL........................................................................................................... 13 7.0 LIMITATIONS....................................................................................................................... 13 8.0 REFERENCES ....................................................................................................................... 14 List of Figures Appendices Figure 1 —Vicinity Map Appendix A— Boring Logs Figure 2 —Site Map Appendix B— Laboratory Test Results Appendix C— Dynamic Cone Penetrometer Results GEOTECHNICAL ENGINEERING 1550 S Cloverdale Rd Suite#201 BOISE,ID (208)484-1090 mEn INNEIVATF GEOTECHNICAL Page 3 of 14 1.0 INTRODUCTION Innovate Geotechnical (IGEO) is pleased to present this report which presents the results of our geotechnical engineering evaluation for the proposed James Ranch Subdivision in Meridian, Idaho. The project area is located approximately as shown in the Vicinity Map, Figure 1. 2.0 PROJECT UNDERSTANDING The proposed development is on the southeast corner of McMillan Road and Black Cat Road in Meridian, Idaho. The project entails developing the approximately 78-acre property into 282 lots. The proposed project includes evaluating the site for subsurface characteristics and providing pavement, foundation, earthwork, and infiltration recommendations. The site will be developed as residential. IGEO was asked to provide geotechnical recommendations for this development. Our understanding of the project is based on our communications with you and the Preliminary Concept Layout prepared by KM Engineering and dated April 1, 2021. We understand the proposed residential construction will consist of one and two-story, wood- framed structures supported by shallow foundations. Wall loads are expected to range from 2 to 4 kips per lineal foot. If the construction conditions are different than we have observed, please notify us so that any appropriate modifications to our conclusions and recommendations contained herein may be made. A site plan is presented in Figure 2. 3.0 SCOPE OF SERVICES The purpose of our geotechnical engineering evaluation was to provide recommendations for site development based on our site evaluation, laboratory testing, and engineering analyses. Our specific scope of services included: • Exploration of soil and groundwater conditions underlying the proposed development by completing 16 test pits, dynamic cone penetration testing, and collecting samples for testing. • Laboratory testing to assess pertinent physical and engineering properties of the soil observed. • Engineering analysis and preparation of this report. GEOTECHNICAL ENGINEERING 1550 S Cloverdale Rd Suite#201 BOISE,ID (208)484-1090 mEn INNHATF GEOTECHNICAL Page 4 of 14 4.0 SITE CONDITIONS AND FIELD EVALUATION Existing surface and subsurface conditions associated with the subject property are presented in this section. 4.1 Surface Conditions The site is in northwest Meridian, Idaho (see Figures 1 and 2). Topographically, the site is relatively level with slight slopes downward from east to west. The elevation drop is approximately 10 feet across the property from approximately 2549 feet above Mean Sea Level (MSL)to approximately 2539 feet above MSL. N Black Cat Rd forms the western boundary of the site. W McMillan Rd forms the northern boundary of the property. Agriculture makes up the observed vegetation on the site. Other residential development surrounds the property. 4.2 Field Evaluation The subsurface soil conditions were determined by performing sixteen (16) Test Pits (TP-1 through TP-16) at the locations shown on Figure 2. Test pits were advanced using a backhoe subcontracted to Wagner. Soil samples were obtained at significant changes of strata and in general accordance with ASTM D-420 and ASTM D-2488. The subsurface conditions observed during the field evaluation are discussed in Section 4.3. Logs of the explorations, including a description of all soil strata encountered, are presented in Appendix A. After completion of the field evaluation, soil samples were tested for their engineering properties. The results of the laboratory testing are presented in Appendix B and shown on the test pit logs in Appendix A. Dynamic cone penetrometer (DCP)tests were performed on six of the test pits (TP-2, TP-3, TP-4, TP-8, TP-10, and TP-14) to assess the in-situ bearing strength characteristics of the subgrade. Results of this testing are presented in Appendix C. Table 1 -Field Evaluation Summary Exploration Approx. Ground Depth Approximate Locations Surface Elevation (feet) WGS 84 (degrees) (feet) Latitude Longitude TP-1 2540 10.5 43.64833 -116.45337 TP-2 2544 9 43.64839 -116.45026 TP-3 2547 9 43.64842 -116.44603 TP-4 2540 9 43.64634 -116.45346 GEOTECHNICAL ENGINEERING 1550 S Cloverdale Rd Suite#201 BOISE,ID (208)484-1090 mEn INNEIVATE GEUTECHNICAL Page 5 of 14 ElevationExploration 'Approx. Ground Depth Approximate Locations Surface :4 • - • - Longitude TP-5 2549 10 43.64687 -116.44364 TP-6 2539 8.5 43.64502 -116.45343 TP-7 2543 8 43.64492 -116.44838 TP-8 2546 9.5 43.64495 -116.44372 TP-9 2541 9.5 43.64728 -116.45171 TP-10 2544 10 43.64730 -116.44968 TP-11 2545 9.5 43.64728 -116.44785 TP-12 2548 8.5 43.64731 -116.44495 TP-13 2543 9.5 43.64621 -116.45110 TP-14 2544 9 43.64592 -116.44849 TP-15 2546 8.5 43.64594 -116.44494 TP-16 2541 8.5 43.64594 -116.44494 4.3 Subsurface Soil Profile The results of our field evaluation and our laboratory testing indicate a fairly uniform subgrade across the site. In general, a mixture of sandy, silty, and clayey soils were observed down to a depth of 2 feet (TP-6) to 6 feet (TP-12) below the existing ground surface. Some cementation was noted in this layer in most of the test pits. This layer was underlain by a gravel layer with varying amounts of sand to the full depth explored (approximately 10.5 feet below the existing ground surface). In most of the test pits,the existing ground surface predominantly overlies brown medium dense silty sand or a moist silt with sand to a depth of up to approximately 3 feet (TP-3, TP-5, TP-9, TP- 11,TP-13, and TP-15) below the existing ground surface.This layer is underlain with a sandy lean clay or a clayey sand up to approximately 5.5 feet below the existing surface. Right below this layer is a poorly graded gravel with sand and various amounts of cobbles up to the full depth explored (approximately 10 feet below the existing ground surface). GEOTECHNICAL ENGINEERING 1550 S Cloverdale Rd Suite#201 BOISE,ID (208)484-1090 mEn INNEIVATF GEUTECHNICAL Page 6 of 14 The other test pits had a moist medium dense silty sand or a sandy silt with up to approximately 6 feet (TP-1, TP-6, TP-10, TP-12, and TP-16) below the existing ground surface. This layer is underlain by poorly and well graded gravel with sand and various amounts of cobbles or a poorly graded sand with gravel and cobbles up to the full depth explored (approximately 10.5 feet below the existing ground surface). In TP-7 and TP-8, the existing ground surface overlies a dry sandy silt or a medium dense silty sand up to a depth of approximately 2.5 feet. This layer is underlain with a poorly graded sand with clay and some gravel (approximately 4 feet below the existing ground surface). Below this is a layer of brown poorly graded gravel with sand and some cobbles up to the full depth explored (approximately 9.5 feet below the existing ground surface). Some of the test pits had a layer of sandy, silty lean clay or a medium dense sandy lean clay up to approximately 2.5 feet (TP-2, TP-4, and TP-14) below the existing ground surface. Below this was a layer of dense clayey sand or a silty, clayey sand up to a depth of 4 feet. This layer is underlain with a poorly graded gravel with sand and some cobbles up to the full depth explored (approximately 9 feet below the existing ground surface). For a detailed description of the soil profiles observed in this evaluation, see the test pit logs in Appendix A. See Figure 2 for the approximate test pit locations. 4.4 Infiltration Testing Infiltration testing was performed in TP-9 and TP-15 at varying depths below the existing ground surface. The infiltration testing was performed in various soil layers. The measured infiltration rates are presented in Table 2. The recommended design infiltration rates are presented in Section 5.9 Infiltration. TABLE 2— Measured Infiltration Rates = Soil Classification Average Measured Infiltration Rate TIP-9 1.5 Silty Sand 28 inches/hour TP-15 2 Silt with Sand 20 inches/hour 4.5 Groundwater Groundwater elevations have been observed since the time of the field evaluation and groundwater has been observed in all the test pits. Table 3 summarizes the groundwater depths observed on the dates indicated. GEOTECHNICAL ENGINEERING 1550 S Cloverdale Rd Suite#201 BOISE,ID (208)484-1090 mEn INNCIVATE GEOTECHNICAL Page 7 of 14 TABLE 3 -Groundwater Depths Depth Below Existing Ground Surface(ft) :F During Field Evaluation 4-13-2021 MIS M11 1�11` TP-1 >10.5 >10.5 8.81 TP-2 8 * 6.31 TP-3 6.5 * 5.39 TPA 8.5 8.82 >9 TP-5 9 7.01 6.83 TP-6 7.5 >8.5 >8.5 TP-7 7 7.21 7.16 TP-8 8.5 6.32 6.92 TP-9 8.5 8.09 8.42 TP-10 9 * 7.01 TP-11 8 * 7.51 TP-12 6.5 6.75 6.24 TP-13 8.5 8.5 8.43 TP-14 7.5 TP-15 7 7.51 7.08 TP-16 7 7.76 7.77 *Unable to obtain reading. Numerous factors such as heavy precipitation, irrigation practices, and other unforeseen factors may influence groundwater elevations at the site. The detailed evaluation of these and other factors, which may be responsible for groundwater fluctuations, is beyond the scope of this study. PVC pipe was installed in each of the test pits to act as piezometers and allow for groundwater observation to take place. IGEO will submit groundwater reading results as a part of this project over the next 7 months from the time of the field evaluation. GEOTECHNICAL ENGINEERING 1550 S Cloverdale Rd Suite#201 BOISE,ID (208)484-1090 mEn INNCIVATE GEOTECHNICAL Page 8 of 14 4.6 Site Subsurface Variations Based on the results of the subsurface exploration and our experience, variations in continuity and nature of subsurface conditions should be anticipated. Due to the heterogeneous characteristics of soils, care should be taken in interpolating or extrapolating subsurface conditions between or beyond the exploratory explorations. Seasonal fluctuations in groundwater conditions may also occur. 4.7 Seismic Setting According to the findings of our subsurface evaluation and the guidelines of the International Building Code (IBC, 2018) the Site Classification is D (IBC, 2018, section 1613). The following values should be used for site structural coefficients: Short Period Spectral Response Acceleration SS = 0.291g One Second Period Spectral Response Acceleration SI = 0.106g Short Period Spectral Response Design Acceleration SIDS = 0.3049 One Second Period Spectral Design Acceleration SDI = 0.1699 Liquefaction of a soil is defined as the condition when a saturated, loose, cohesion-less, (fine sand-type) soils have a sudden, large decrease, in their ability to support loads. This is because of excessive pore water pressure which develops during a seismic event. Cohesive (clay type) and dense sand and gravel soils typically do not liquefy during a seismic event. Because of the soils observed at the site, it is our opinion that the potential for liquefaction at this site is low under seismic conditions. 5.0 CONCLUSIONS AND RECOMMENDATIONS Based on the results of our site exploration, laboratory testing, and engineering analyses, it is our opinion that the proposed site may be improved as envisioned. Specific recommendations for the proposed improvements are presented in the following sections of this report. 5.1 Site Preparation and Earthwork 5.1.1 Initial Preparation We recommend that proposed areas for improvements be prepared by clearing and grubbing of both the surface and subsurface of all debris, deleterious and organic matter, and roots greater than %inch diameter. We estimate that the depth of stripping required to remove organic topsoil will range from approximately 2 to 4 inches across the site. We recommend an average topsoil stripping depth of 3 inches be used for planning and cost estimating. GEOTECHNICAL ENGINEERING 1550 S Cloverdale Rd Suite#201 BOISE,ID (208)484-1090 mEn INNEIVATF GEOTECHNICAL Page 9 of 14 5.1.2 Grading, Excavations, and Subgrade Preparation Current site grades within the proposed improvements slope gently toward the southwest. We anticipate excavation depths to be fairly consistent across the site. In order to provide uniform bearing conditions for the proposed structures and pavements, we recommend the following site preparation activities: • Within foundation limits,the native soils are to be proof-rolled and compacted to establish final foundation elevations. • Within floor slab limits, the native soils are to be proof-rolled and compacted to establish final slab elevations. • Within the roadway limits, the on-site sandy soils should be proof-rolled prior to placing the aggregate for the proposed roadway section. In the event earthwork activities cause excessive subgrade disturbance,replacement with structural fill may be necessary. A greater depth of disturbance of the subgrade soil may be expected if site preparation work is conducted during periods of wet weather when the moisture content of the soil exceeds optimum. Any soft, loose, wet or otherwise unsuitable soil encountered is to be over- excavated to firm soil, or a depth of 2 feet, whichever is less, and replaced with structural fill, as described below. 5.1.3 Temporary Excavations For temporary excavations less than five feet deep, side slopes should not be made steeper than 0.5:1 (horizontal to vertical). Temporary excavations extending more than five feet and up to ten feet in depth should not be made steeper than 1:1. If unstable conditions or groundwater seepage are encountered, flatter slopes, shoring, or bracing may be required for all conditions. All excavations should be made following OSHA safety guidelines. 5.2 Structural Fill Soil used to support the foundations and/or the proposed extension of Dry Creek Ranch is classified as structural fill for the purposes of this report. 5.2.1 Structural Fill Structural fill shall consist of granular soils free of organics, debris, or other deleterious materials and no particles larger than four inches in maximum dimension. Structural fill shall meet the specifications described below: • Structural fill placed below structural foundations should consist of well-graded, sand and gravel material with no more than 12% passing the #200 sieve. Equivalent specifications may be used if approved by the project geotechnical engineer. GEOTECHNICAL ENGINEERING 1550 S Cloverdale Rd Suite#201 BOISE,ID (208)484-1090 mEn INNEIVATE GEOTECHNICAL Page 10 of 14 5.2.2 Use of on-site Soil The on-site sandy soils observed in our test pits may be reused as structural fill, provided it is reworked and meets the requirements set forth above. 5.3 Fill Placement and Compaction The various types of compaction equipment have their limitations as to the maximum lift thickness that can be compacted. For example, hand operated equipment is limited to lifts of about four inches and most "trench compactors" have a maximum, consistent compaction depth of about six inches. Large rollers, depending on soil and moisture conditions can achieve compaction at eight to twelve inches. The full thickness of each lift should be compacted to at least the following percentages of the maximum dry density (MDD) as determined by ASTM D- 1557: 1. Compacted fill/native soils, supporting foundations 95% 2. Compacted fill/native soils, below floor slabs 95% 3. Compacted fill/native soils, below pavement 95% 4. Backfill of trenches a. Below foundations 95% b. Below pavement 95% c. Others 90% Field density tests should be performed on each lift as necessary to ensure that compaction is being achieved. Conditions of the structural fill, site grading fill, and compacted native soil should be evaluated by in-place density tests, visual evaluations, probing and proof-rolling as these materials are prepared to determine compliance with the contract documents and recommendations in this report. Over compaction should be avoided as increased compaction effort will result in lateral pressures higher than those provided in this report. 5.4 Slopes For permanent re-worked slopes on the property, we recommend slopes of no more than 2Horizontal : 1Vertical. Shallower slopes may be needed where loose, soft,or otherwise unstable slopes are encountered. 5.5 Foundation Support We anticipate that the proposed footings will be established at a minimum elevation of two feet below the existing ground surface.To establish uniform bearing conditions the proposed footings should be established entirely on a specific zone of compacted native soils, as described previously. GEOTECHNICAL ENGINEERING 1550 S Cloverdale Rd Suite#201 BOISE,ID (208)484-1090 mEn INNEIVATF GEOTECHNICAL Page 11 of 14 Foundations may be designed using a maximum allowable bearing pressure of 1,500 psf. In addition to the fill recommendations presented previously in this report, the following recommendations should be implemented: • Continuous footing width should be maintained at a minimum of 18 inches. • Spot footings should be a minimum of 30 inches in width. • Exterior footings should be placed a minimum of 24 inches below final grade for frost protection, and interior footing shall be placed a minimum of 16 inches below grade. • Drainage around the site should be created so that water is not allowed to flow into the excavation during or after construction. The allowable bearing pressure may be increased by 1/3 for temporary loads such as wind and seismic forces. Based on the preliminary maximum foundation loads, as presented above, and given that the foundations are supported as described in this report, we estimate that total settlement will be less than about 1 inch. Differential settlement is estimated to be less than about % of the total settlement. Post-construction settlement should be minor. Loose soil or otherwise unsuitable soil not removed from footing excavations, or disturbance of soil at foundation grade during construction could result in larger settlements than estimated. 5.6 Floor Slabs Floor slabs may be supported on structural fill overlying the on-site soils as recommended in the previous sections of this report. We recommend the slab be designed using a modulus of vertical subgrade reaction (k) of 100 pounds per cubic inch (pci). To help control normal shrinkage and stress cracking, the floor slabs should have the following features: • Adequate reinforcement for the anticipated floor loads with the reinforcement continuous through interior floor joints • Frequent crack control joints • Non-rigid attachment of the slabs to foundation walls and bearing slabs 5.7 Drainage All soils can experience some volume change when exposed to water. Therefore, adequate site drainage is always important. Site grading design and construction should be implemented to assure that all surface water is directed away from the foundation bearing soils. We recommend the following actions be taken: GEOTECHNICAL ENGINEERING 1550 S Cloverdale Rd Suite#201 BOISE,ID (208)484-1090 mEn INNEIVATE GEOTECHNICAL Page 12 of 14 1. All areas around the buildings should be sloped to provide drainage away from the structures. We recommend a minimum slope of 6 inches in the first 10 feet away from the structure. 2. All roof drainage should be collected in rain gutters with downspouts designed to discharge well beyond the backfill limits or the stormwater drainage system, if applicable. 3. Adequate compaction of the foundation backfill should be provided. We suggest a minimum of 90% of the maximum laboratory density as determined by ASTM D-1557. Water consolidation methods should not be used under any circumstances. 4. Sprinklers should be aimed away from the foundation walls. The sprinkling systems should be designed with proper drainage and be well-maintained. Over watering should be avoided. 5. Other precautions may become evident during construction. 5.8 Pavement The flexible pavement evaluation was performed using the Gravel Equivalence (GE) method. In our evaluation we analyzed a roadway classification of local road and collector road. In general, the thickness of the asphalt pavement is predominantly controlled by the traffic and the thickness of the base and sub-base layers is predominantly controlled by the subgrade conditions. The results of the R-value testing indicate an R-values of 32 (TP-4) and 55 (TP-10). The total thickness analysis was developed based on an estimated R-value of the subgrade soil of 32 and traffic data recommended by Ada County Highway District (ACHD). ACHD recommends using a traffic index (TI) of 6 for local roads and a TI of 8 for collector roads.The flexible pavement design criteria are summarized in Table 4. TABLE 4-Flexible Pavement Design Criteria Design Characteristic Design Value Design Life 20 Years T.I.=6.0 (Local Roads) Traffic T.I.=8.0 (Collector Roads) Idaho Climatic Factor 1 Subgrade R-Value=32 Subbase R-Value=60 Untreated Base Course (UTBC)—%" crushed aggregate R-Value=80 Substitution Ratios Asphalt 1.95:1.0 GEOTECHNICAL ENGINEERING 1550 S Cloverdale Rd Suite#201 BOISE,ID (208)484-1090 mEn INNI]VATF GEOTECHNICAL Page 13 of 14 Base 1.10:1.0 Subbase 1.0:1.0 The recommended total design pavement section for the flexible pavement of the roadways is presented in Table 5. TABLE 5-Flexible Pavement Sections Flexible Subbase Total Flexible Pavement Pavement Base Thickness Thickness Thickness Section Thickness (inches) (inches) (inches) ------------ Local Road 2.5 4 6 12.5 Collector Road 3.2 6 9 18.2 5.9 Infiltration Based on our field evaluation and our understanding of the soils anticipated at the site, applying a factor of safety of 2 for the measured infiltration rate,we recommend using a design infiltration rate of 8 inches/hour for the drainage facilities on site. Variations in the infiltration properties of the soils on site can be expected. We recommend performing an infiltration test to verify the facility specific infiltration rate at the design depth during construction. 6.0 QUALITY CONTROL Our recommendations in this report are based on the assumption that adequate quality control testing and observations will be conducted during construction to verify compliance. 7.0 LIMITATIONS The recommendations provided herein were developed by evaluating the information obtained from the subsurface investigation and our experience in the area. The exploration data reflects the subsurface conditions only at the specific locations at the particular time designated on the logs. Soil and ground water conditions may differ from conditions encountered at the actual exploration locations.The nature and extent of any variation in the explorations may not become evident until during the course of construction. If variations do appear, it may become necessary to re-evaluate the recommendations of this report after we have observed the variation. Our professional services have been performed, our findings obtained, and our recommendations prepared in accordance with generally accepted geotechnical engineering principles and practices. This warranty is in lieu of all other warranties, either expressed or implied. GEOTECHNICAL ENGINEERING 1550 S Cloverdale Rd Suite#201 BOISE,ID (208)484-1090 mEn INNEIVATF GEDTECHNICAL Page 14 of 14 R n RFFF' AASHTO Guide for Design of Pavement Structures, American Association of State Highway and Transportation Officials, 1993. ASTM, American Society for Testing and Materials Ada County Highway District. Policy Manual. Asphalt Institute. The Asphalt Handbook. Manual Series No. 4 (MS-4) 1989 edition. IBC, International Building Code, 2018 Edition Idaho Standards for Public Works Construction 2017 Edition. Fundamentals of Geotechnical Analysis— Dunn, Anderson, and Kiefer (1980) Essentials of Soil Mechanics and Foundations— David F. McCarthy (2007) Foundation Engineering— Peck, Hanson, and Thornburn (1994) Principles of Foundation Engineering— Braja M. Das. (2004) GEOTECHNICAL ENGINEERING 1550 S Cloverdale Rd Suite#201 BOISE,ID (208)484-1090 James -Ranch Subd Ais.19n 'i2i Meridian, Id6ho ` , SITE its if - ... .. A Aw aid a; L ` Mw INNOVATE Approximate Site Location GEUTECHWAL James Ranch Subdvision Date: 13-April-21 Figure: Vicinity Map Project No: 321026 Drawn By: S. Hyde 1 Locations are approximate Client: Walsh Group 1 Jame : ^ .nch Subdivision eri i o M { or } ..:.. _. .. _ . .r TF - TP TP-9 : . - TPWI3 4 TP- , INNOVATE ® Approximate Test Pit Locations GEOTECHNIEAL James Ranch Subdivision Date: 13-April-21 fFFigure: Site Map Project No: 321026 Drawn By: S. Hyde2 Locations are approximate Client: Walsh Group mEn INNnVATE GEHTECHNICAE Appendix A INNOVATE InnovateGeotechnical TEST PIT NUMBER TP-1 min1150 S Cloverdale Road,Ste.201 PAGE 1 OF 1 Boise,Idaho 83709 GEFECHNICAL Telephone:(208)484-1090 CLIENT Walsh Group PROJECT NAME James Ranch Subdivision PROJECT NUMBER 321026 PROJECT LOCATION Meridian, Idaho DATE STARTED 4/13/21 COMPLETED 4/13/21 GROUND ELEVATION 2540 ft TEST PIT SIZE inches EXCAVATION CONTRACTOR Wagner GROUND WATER LEVELS: EXCAVATION METHOD Backhoe AT TIME OF EXCAVATION --- LOGGED BY Seth Olsen CHECKED BY AT END OF EXCAVATION --- NOTES Groundwater was not observed. AFTER EXCAVATION --- ATTERBERG ui a z W o LIMITS w = v �w �^ �� 0- �^LU ��- } z a 0-0 MATERIAL DESCRIPTION W CO w 0 0 z N z �z o U x O J� J DQ W.- Q W H H� U W V o Wv �J o-n U� mO> Y" �" H �g cng H c7 2z W Uz O o: 20 0J QJ Qz wv U) a M U o z 0 0.0 D J IL SANDY SILT,(ML)brown,moist, medium dense U) Uj w z 0 U) 0 m U Z K U W Q 2.5 •• z 0 GB 29 51 m 51 %fines,Cemented below 3.5' 1 U K W Q ~ POORLY GRADED GRAVEL WITH SAND,COBBLES,(GP) z W o 0 5.0 .o'•D: 0 Q• °ao. J Q ° . o GB d Piezometer Installed at 9.5' 2 U) o'•D: 0� Q• .. w U o'•D: 7.5 N o'•D: o. 0 0 0'•D: a Q• J U) ~ o. Z �o. z Q• 0 10.0 .o'•D: m O• Uj U Bottom of test pit at 10.5 feet. 0 w 0 INNOVATE InnovateGeotechnical TEST PIT NUMBER TP-2 mEn1150 S Cloverdale Road,Ste.201 PAGE 1 OF 1 Boise,Idaho 83709 IULU GEOTECHNICAL Telephone:(208)484-1090 CLIENT Walsh Group PROJECT NAME James Ranch Subdivision PROJECT NUMBER 321026 PROJECT LOCATION Meridian, Idaho DATE STARTED 4/13/21 COMPLETED 4/13/21 GROUND ELEVATION 2544 ft TEST PIT SIZE inches EXCAVATION CONTRACTOR Wagner GROUND WATER LEVELS: EXCAVATION METHOD Backhoe SZ AT TIME OF EXCAVATION 8.00 ft/Elev 2536 ft LOGGED BY Seth Olsen CHECKED BY AT END OF EXCAVATION --- NOTES Groundwater was observed at 8'. AFTER EXCAVATION --- ATTERBERG a z w o LIMITS w d Hm W� �ZJ Hw ~� �Z () H Z o MATERIAL DESCRIPTION J g >0 0 z Q w w z Q w o H U w OU o wv �J an o� mo> Y" �" H �g cng H c7 2z W Uz O o 20 �� Q J Qz wv u D Z a p U o 0.0 o_ E: J SANDY LEAN CLAY,SILTY, (CL-ML)brown, moist, medium a dense Uj 54%fines, brown, moist,dense,Some Cementation G16 20 29 23 6 54 0 U) o CLAYEY SAND,SILTY, (SC-SM)13%gravel,56%sand,31 % fines, DCP Test at 2.5' U) U Z Q K U w 2.5 GB z Brown, moist,dense 2 24 31 0 U) 0 m U Z Q K U Uj a POORLY GRADED GRAVEL WITH SAND,(GP)Piezometer a ° Installed at 9' z Q'w D 5.0 .°IBa. 0 0 J O V IB0. Y Q o D: Q GB �' J B0. 3 U Q U w o D: N 7.5 o D: O 7 a c� J Oh' 0 °Va. U) o D: z Bottom of test pit at 9.0 feet. z z J U 2 m 2 U w H U w 0 INNOVATE InnovateGeotechnical TEST PIT NUMBER TP-3 min1150 S Cloverdale Road,Ste.201 PAGE 1 OF 1 Boise,Idaho 83709 GEFECHNICAL Telephone:(208)484-1090 CLIENT Walsh Group PROJECT NAME James Ranch Subdivision PROJECT NUMBER 321026 PROJECT LOCATION Meridian, Idaho DATE STARTED 4/13/21 COMPLETED 4/13/21 GROUND ELEVATION 2547 ft TEST PIT SIZE inches EXCAVATION CONTRACTOR Wagner GROUND WATER LEVELS: EXCAVATION METHOD Backhoe a AT TIME OF EXCAVATION 6.50 ft/Elev 2540.50 ft LOGGED BY Seth Olsen CHECKED BY AT END OF EXCAVATION --- NOTES Groundwater was observed at 6.5'. AFTER EXCAVATION --- ATTERBERG ui a z W o LIMITS w = v �w �^ �� 0- �^LU ��- } z a 0-0 MATERIAL DESCRIPTION W CO w 0 0 z N z �z o U x O J� J DQ W.- Q W H H� U W V o Wv �J o-n U� m0> Y" �" H �g cng H c7 2z W Uz O o 20 0J QJ Qz wv U) a M U o z 0 0.0 D J IL SILTY SAND,(SM)brown,moist, medium dense U) Uj w z GB > 1 0 m SANDY LEAN CLAY, (CL)brown,moist, medium dense z w w 2.5 GB z 59%fines, DCP Test at 2.5' 2 26 59 0 m U Z K Cl) W ~ POORLY GRADED GRAVEL WITH SILT AND SAND, (GP-GM) z LU o 5.0 O GB U Piezometer Installed at 9' 3 0 J Y O J ° U U) O W C7 U - 0 U O rn v 0 N 7.5 o F o O U O < J In ° 7 0 O U) z Bottom of test pit at 9.0 feet. z z J U 2 m 2 U W H O w 0 INNOVATE InnovateGeotechnical TEST PIT NUMBER TP-4 min1150 S Cloverdale Road,Ste.201 PAGE 1 OF 1 Boise,Idaho 83709 GEFECHNICAL Telephone:(208)484-1090 CLIENT Walsh Group PROJECT NAME James Ranch Subdivision PROJECT NUMBER 321026 PROJECT LOCATION Meridian, Idaho DATE STARTED 4/13/21 COMPLETED 4/13/21 GROUND ELEVATION 2540 TEST PIT SIZE inches EXCAVATION CONTRACTOR Wagner ft GROUND WATER LEVELS: EXCAVATION METHOD Backhoe a AT TIME OF EXCAVATION 8.50 ft/Elev 2531.5 ft LOGGED BY Seth Olsen CHECKED BY AT END OF EXCAVATION --- NOTES Groundwater was observed at 8.5'. AFTER EXCAVATION --- ATTERBERG a z w o LIMITS w d Hm W� �ZJ Hw ~� �Z () H Z O MATERIAL DESCRIPTION J g >0 0 z Q w w z Q w o H U w OU o wv �J an U� m0> Y" �" H �g cng H C7 2z W UZ O Z �O �� Q J QZ wv u D 0 0.0 a p U o_ E: J a SANDY LEAN CLAY/SANDY SILT, (CL)brown,dry, medium dens U) Uj w z R-Value=32 21 34 24 10 77 ° GB 18 31 22 9 55 0 55%fines 1 m U Z Q K U W Q 2.5 GB o CLAYEY SAND, (SC)dense, DCP Test at 2.5' 2 U) 0 m z POORLY GRADED GRAVEL WITH SAND,(GP)dry,dense, °' Piezometer Installed at 9' Cn w U ° °- z Z o• D w 3 5.0 o 0 � o'•D J U U) 0• � K w o'•D. U n 7.5 °�o• 0 o' D. 17 U) Q. - °Ld. z Bottom of test pit at 9.0 feet. z z J U 2 m 2 U W H U w c� INNOVATE InnovateGeotechnical TEST PIT NUMBER TP-5 min1150 S Cloverdale Road,Ste.201 PAGE 1 OF 1 Boise,Idaho 83709 GEFECHNICAL Telephone:(208)484-1090 CLIENT Walsh Group PROJECT NAME James Ranch Subdivision PROJECT NUMBER 321026 PROJECT LOCATION Meridian, Idaho DATE STARTED 4/13/21 COMPLETED 4/13/21 GROUND ELEVATION 2549 TEST PIT SIZE inches EXCAVATION CONTRACTOR Wagner ft GROUND WATER LEVELS: EXCAVATION METHOD Backhoe a AT TIME OF EXCAVATION 9.00 ft/Elev 2540 ft LOGGED BY Seth Olsen CHECKED BY AT END OF EXCAVATION --- NOTES Groundwater was observed at 9'. AFTER EXCAVATION --- ATTERBERG a z w o LIMITS w d Hm W� �ZJ Hw ~� �Z () H Z O MATERIAL DESCRIPTION J g >0 0 z Q w w z Q w o H U w OU o wv �J an U� m0> Y" �" H �g cng H C7 2z W UZ O Z �O �� Q J QZ wv u D o 0.0 a p U o_ E: J a SILTY SAND,(SM)brown,moist, medium dense U) Uj w 0 GB > 1 s m U Z Q K w SANDY LEAN CLAY, (CL)moist, medium dense 2.5 GB 0 4%gravel,41 %sand,55%fines,Some Cementation 2 24 55 U) 0 m U Z Q K Cl) W Q F Z W 5.0 0 0 POORLY GRADED GRAVEL WITH SAND,COBBLES,(GP) °0 moist,dense, Piezometer Installed at 9.5' J o• p. U Q•' , U 0 6o. o. w U O• a. N 7.5 O•' N o aa. c� of o. Q o •. . n17 o'•D: 0 o'aa. z o'•D: z o aa. 0 10.0 = Bottom of test pit at 10.0 feet. m x U W 0 O w " INNOVATE InnovateGeotechnical TEST PIT NUMBER TP-6 min1150 S Cloverdale Road,Ste.201 PAGE 1 OF 1 Boise,Idaho 83709 GEFECHNICAL Telephone:(208)484-1090 CLIENT Walsh Group PROJECT NAME James Ranch Subdivision PROJECT NUMBER 321026 PROJECT LOCATION Meridian, Idaho DATE STARTED 4/13/21 COMPLETED 4/13/21 GROUND ELEVATION 2539 ft TEST PIT SIZE inches EXCAVATION CONTRACTOR Wagner GROUND WATER LEVELS: EXCAVATION METHOD Backhoe a AT TIME OF EXCAVATION 7.50 ft/Elev 2531.50 ft LOGGED BY Seth Olsen CHECKED BY AT END OF EXCAVATION --- NOTES Groundwater was observed at 7.5'. AFTER EXCAVATION --- ATTERBERG a z w o LIMITS w d Hm W� �ZJ Hw ~� �Z () H Z O MATERIAL DESCRIPTION J g >0 0 z Q w w z Q w o H U w OU o wv �J an U� m0> Y" �" H �g Ug H C7 2z W UZ O Z �O �� Q J QZ wv u D o 0.0 o o U o_ E: J a SANDY SILT,(ML)brown,moist, medium dense U) Uj w z O U) 0 m GB U 22 60 60%fines 1 z w o;•:::;:. POORLY GRADED SAND WITH GRAVEL,COBBLES,(SP) Q 2.5 brown,dry, medium dense z O U) 49%gravel,50%sand, 1 %fines, Piezometer Installed at 8.5' 26 4 1 U U LU Q p'. LU 0 5.0 p;: : 0 0 Q J LU U o . K N p'. V N 7.5 :' V m J Bottom of test pit at 8.5 feet. 0 U) z U z J O U 2 m 2 U w H O w 0 INNOVATE InnovateGeotechnical TEST PIT NUMBER TP-7 min1150 S Cloverdale Road,Ste.201 PAGE 1 OF 1 Boise,Idaho 83709 GEFECHNICAL Telephone:(208)484-1090 CLIENT Walsh Group PROJECT NAME James Ranch Subdivision PROJECT NUMBER 321026 PROJECT LOCATION Meridian, Idaho DATE STARTED 4/13/21 COMPLETED 4/13/21 GROUND ELEVATION 2543 TEST PIT SIZE inches EXCAVATION CONTRACTOR Wagner ft GROUND WATER LEVELS: EXCAVATION METHOD Backhoe a AT TIME OF EXCAVATION 7.00 ft/Elev 2536.0 ft LOGGED BY Seth Olsen CHECKED BY AT END OF EXCAVATION --- NOTES Groundwater was observed at 7'. AFTER EXCAVATION --- ATTERBERG a z w o LIMITS w d Hm W� �ZJ Hw ~� �Z () H Z O MATERIAL DESCRIPTION J g >0 0 z Q w w z Q w o H U w OU o wv �J an U� mO> Y" �" H �g cng H C7 2z W UZ O Z �O �� Q J QZ wv u d - 0 0.0 a p U o_ � J a SANDY SILT,(ML)brown,dry, medium dense U) Uj w z ° GB 22 56 0 56%fines 1 m L) POORLY GRADED SAND WITH CLAY,(SP-SC)brown GB w Some Cementation 2 Qz 2.5 0 U) 0 m U Z Q K Cn Uj a POORLY GRADED GRAVEL WITH SAND,COBBLES,(GP) a ° brown, moist,dense, Piezometer Installed at 8' z Q. w D 5.0 .°IB°. 0 0 � O < h`° J Y Q o D: J U w U ° O D. v Q - N 7.5 .° o D: Q. m Bottom of test pit at 8.0 feet. a J U) 0 U) Z z Z J U 2 m 2 U w H U w 0 INNOVATE InnovateGeotechnical TEST PIT NUMBER TP-8 min1150 S Cloverdale Road,Ste.201 PAGE 1 OF 1 Boise,Idaho 83709 GEFECHNICAL Telephone:(208)484-1090 CLIENT Walsh Group PROJECT NAME James Ranch Subdivision PROJECT NUMBER 321026 PROJECT LOCATION Meridian, Idaho DATE STARTED 4/13/21 COMPLETED 4/13/21 GROUND ELEVATION 2546 TEST PIT SIZE inches EXCAVATION CONTRACTOR Wagner ft GROUND WATER LEVELS: EXCAVATION METHOD Backhoe a AT TIME OF EXCAVATION 8.50 ft/Elev 2537.50 ft LOGGED BY Seth Olsen CHECKED BY AT END OF EXCAVATION --- NOTES Groundwater was observed at 8.5'. AFTER EXCAVATION --- ATTERBERG ui a z W o LIMITS w = v �w �^ �� 0- �^LU ��- } z a 0-0 MATERIAL DESCRIPTION W CO w 0 0 z N z �z o U x O J� J DQ W.- Q W H H� U W V o Wv �J o-n U� m0> Y" �" H �g cng H c7 2z W Uz O o 20 0J QJ Qz wv U) a 0 U o_ - z 0 0.0 CL E: J a SILTY SAND,(SM)brown,medium dense U) Uj w z GB > 1 0 m U Z Q K U W 2.5 GB a POORLY GRADED SAND WITH CLAY AND GRAVEL,(SP-SC) 2 21 9 U) 30%gravel,61 %sand,9%fines, brown,dry,dense, DCP Test o at 2.5' Uj U K Uj a POORLY GRADED GRAVEL WITH SAND,COBBLES,(GP) a ° Piezometer Installed at 9.5' z Q'w D 5.0 .°IB°. 0 0 J IB0 O V. Y Q o D: J U w o D: N 7.5 ° o D: Q. ° 0 0� c� J U) O' 0 .° - U) o b: � Q. z Bottom of test pit at 9.5 feet. J U 2 m 2 U W H O w . INNOVATE InnovateGeotechnical TEST PIT NUMBER TP-9 min1150 S Cloverdale Road,Ste.201 PAGE 1 OF 1 Boise,Idaho 83709 GEFECHNICAL Telephone:(208)484-1090 CLIENT Walsh Group PROJECT NAME James Ranch Subdivision PROJECT NUMBER 321026 PROJECT LOCATION Meridian, Idaho DATE STARTED 4/13/21 COMPLETED 4/13/21 GROUND ELEVATION 2541 ft TEST PIT SIZE inches EXCAVATION CONTRACTOR Wagner GROUND WATER LEVELS: EXCAVATION METHOD Backhoe SZ AT TIME OF EXCAVATION 8.50 ft/Elev 2532.5 ft LOGGED BY Seth Olsen CHECKED BY AT END OF EXCAVATION --- NOTES Groundwater was observed at 8.5'. AFTER EXCAVATION --- ATTERBERG a z w o LIMITS w d Hm W� �ZJ Hw ~� �Z () H Z O MATERIAL DESCRIPTION J g >0 0 z Q w w z Q w o H U w OU o wv �J an U� m0> Y" �" H �g cng H C7 2z W UZ O Z �O �� Q J QZ wv u D o 0.0 a p U o_ E: J a SILTY SAND,(SM)brown,moist, medium dense U) Uj w 0 GB o Infiltration Test at 1.5' 1 m U Z Q K U w 2.5 GB o SANDY LEAN CLAY, (CL)66%fines, brown,dry,dense,Some 2 24 66 U) Cementation s m U Z Q K U w Q z POORLY GRADED GRAVEL WITH SAND,COBBLES,(GP) LU brown,dense, Piezometer Installed at 9.5' 0 5.0 .o'•D: 0 Q• °ao. J a O•' U U) o'•D: � Q• .. w U o. U o'•D: 7.5 N o'•D: o. 0 °i a J 7- 0 U) ~ o. Z �o. Bottom of test pit at 9.5 feet. J O U 2 m 2 U w H O w 0 INNOVATE InnovateGeotechnical TEST PIT NUMBER TP-10 min1150 S Cloverdale Road,Ste.201 PAGE 1 OF 1 Boise,Idaho 83709 MTEMMAL Telephone:(208)484-1090 CLIENT Walsh Group PROJECT NAME James Ranch Subdivision PROJECT NUMBER 321026 PROJECT LOCATION Meridian, Idaho DATE STARTED 4/13/21 COMPLETED 4/13/21 GROUND ELEVATION 2544 ft TEST PIT SIZE inches EXCAVATION CONTRACTOR Wagner GROUND WATER LEVELS: EXCAVATION METHOD Backhoe a AT TIME OF EXCAVATION 9.00 ft/Elev 2533.0 ft LOGGED BY Seth Olsen CHECKED BY AT END OF EXCAVATION --- NOTES Groundwater was observed at 9'. AFTER EXCAVATION --- ATTERBERG a z w o LIMITS w d Hm W� �ZJ Hw ~� �Z () H Z O MATERIAL DESCRIPTION J g >0 0 z Q w w z Q w o H U w OU o wv �J an U� m0> Y" �" H �g cng H C7 �z W UZ O �O � Z � Q J QZ wv u D o 0.0 a p U o_ E: J a SILTY SAND/SILT WITH SAND,(SM)brown,moist, medium dens U) Uj w z 0 U) R-Value=55 25 36 31 5 76 s m U) GB 45%fines 1 z w w 2.5 21 45 z 0 U) 0 m = GB z POORLY GRADED GRAVEL WITH CLAY AND SAND,(GP-GC) 2 ° brown, DCP Test at 3.5' w o Piezometer Installed at 10' o z ZLU O L) 5.0 ° 0 0 � o J Y ° � O J U U) 0 L o U 0 rn O N 7.5 ° � o 0 U 0 0i � O V) 7 0 0 H O - Z_ U (n 0 Z � O 0 10.0 = Bottom of test pit at 10.0 feet. m U w 0 U w 0 INNOVATE InnovateGeotechnical TEST PIT NUMBER TP-11 min1150 S Cloverdale Road,Ste.201 PAGE 1 OF 1 Boise,Idaho 83709 MTEMMAL Telephone:(208)484-1090 CLIENT Walsh Group PROJECT NAME James Ranch Subdivision PROJECT NUMBER 321026 PROJECT LOCATION Meridian, Idaho DATE STARTED 4/13/21 COMPLETED 4/13/21 GROUND ELEVATION 2545 ft TEST PIT SIZE inches EXCAVATION CONTRACTOR Wagner GROUND WATER LEVELS: EXCAVATION METHOD Backhoe a AT TIME OF EXCAVATION 8.00 ft/Elev 2537 ft LOGGED BY Seth Olsen CHECKED BY AT END OF EXCAVATION --- NOTES Groundwater was observed at 8'. AFTER EXCAVATION --- ATTERBERG a z w o LIMITS w d Hm W� �ZJ Hw ~� �Z () H Z O MATERIAL DESCRIPTION J g >O 0 z Q w w z Q w o H U w OU o wv �J an O� m0> Y" �" H �g cng H c7 �z W Uz O o �O � Z � Q J Qz wv u D o 0.0 a p U o_ E: J a SILTY SAND,(SM)brown,medium dense U) Uj w z GB > 1 s m U Z Q K w CLAYEY SAND, (SC)light brown Q 2.5 GB z Some Cementation 2 0 0 m U Z Q K Cl) W Q Z W 5.0 .• ° POORLY GRADED GRAVEL WITH SAND,(GP)brown o °. o D: Y O Q o D: 0� GB 82%gravel, 18%sand,0%fines, Piezometer Installed at 9.5' 3 3 0 o D: O N 7.5 O - oi J 0�° U) 2�1 Bottom of test pit at 9.5 feet. J ° U 2 m 2 U W 0 O w 0 INNOVATE InnovateGeotechnical TEST PIT NUMBER TP-12 min1150 S Cloverdale Road,Ste.201 PAGE 1 OF 1 Boise,Idaho 83709 MTEMMAL Telephone:(208)484-1090 CLIENT Walsh Group PROJECT NAME James Ranch Subdivision PROJECT NUMBER 321026 PROJECT LOCATION Meridian, Idaho DATE STARTED 4/13/21 COMPLETED 4/13/21 GROUND ELEVATION 2548 ft TEST PIT SIZE inches EXCAVATION CONTRACTOR Wagner GROUND WATER LEVELS: EXCAVATION METHOD Backhoe SZ AT TIME OF EXCAVATION 6.50 ft/Elev 2541.5 ft LOGGED BY Seth Olsen CHECKED BY AT END OF EXCAVATION --- NOTES Groundwater was observed at 6.5'. AFTER EXCAVATION --- ATTERBERG a z w o LIMITS w d Hm W� �ZJ Hw ~� �Z () H Z O MATERIAL DESCRIPTION J g >0 0 z Q w w z Q w o H U w OU o wv �J an U� m0> Y" �" H �g cng H C7 2z W UZ O 20 �� Z Q J QZ wv u d - 0 0.0 o o U o_ � J IL SANDY SILT,(ML)brown,moist, medium dense U) Uj w z GB > 1 s m U Z K U W 2.5 GB 029%fines 2 29 62 U) > 0 m U K Cl) W Q F z W 5.0 0 0 J Y Q o POORLY GRADED GRAVEL WITH SAND,(GP)brown,wet, U) ° medium dense LU o' D. � Q - U . GB o D: Piezometer Installed at 8.5' 3 N 7.5 0 o' D. � Q 0 o D. Bottom of test pit at 8.5 feet. 0 U) 0 z z z J U 2 m 2 U W 0 U w 0 INNOVATE InnovateGeotechnical TEST PIT NUMBER TP-13 min1150 S Cloverdale Road,Ste.201 PAGE 1 OF 1 Boise,Idaho 83709 MTEMMAL Telephone:(208)484-1090 CLIENT Walsh Group PROJECT NAME James Ranch Subdivision PROJECT NUMBER 321026 PROJECT LOCATION Meridian, Idaho DATE STARTED 4/13/21 COMPLETED 4/13/21 GROUND ELEVATION 2543 ft TEST PIT SIZE inches EXCAVATION CONTRACTOR Wagner GROUND WATER LEVELS: EXCAVATION METHOD Backhoe SZ AT TIME OF EXCAVATION 8.50 ft/Elev 2534.5 ft LOGGED BY Seth Olsen CHECKED BY AT END OF EXCAVATION --- NOTES Groundwater was observed at 8.5'. AFTER EXCAVATION --- ATTERBERG a z w o LIMITS w d Hm W� �ZJ Hw ~� �Z () H Z O MATERIAL DESCRIPTION J g >O 0 z Q w w z Q w o H U w OU o wv �J an O� m0> Y" �" H �g cng H c7 2z W Uz O o 20 �� Z Q J Qz wv u d - 0 0.0 a p U o_ � J IL a SILTY SAND,(SM)brown,dry, medium dense U) Uj w 0 0 U) 0 CLAYEY SAND, (SC)brown,dry,dense m U Z < GB w Cemented 1 Q 2.5 z 0 0 m z POORLY GRADED GRAVEL WITH SAND,COBBLES,(GP)dry, °' dense, Piezometer Installed at 9.5' °' w U ° °- z Z o• D w 3 5.0 0 0 � o'•D o'•D: GB 4 3 Q 66%gravel,31 %sand,3%fines 2 U) ° ° LU w o'•D: U 7.5 Q. N ° O. 0 o' D: 77 U) Q. - U) ° o. 6.0 z Bottom of test pit at 9.5 feet. J O U 2 m 2 Uc� w H O w INNOVATE InnovateGeotechnical TEST PIT NUMBER TP-14 min1150 S Cloverdale Road,Ste.201 PAGE 1 OF 1 Boise,Idaho 83709 MTEMMAL Telephone:(208)484-1090 CLIENT Walsh Group PROJECT NAME James Ranch Subdivision PROJECT NUMBER 321026 PROJECT LOCATION Meridian, Idaho DATE STARTED 4/13/21 COMPLETED 4/13/21 GROUND ELEVATION 2544 ft TEST PIT SIZE inches EXCAVATION CONTRACTOR Wagner GROUND WATER LEVELS: EXCAVATION METHOD Backhoe SZ AT TIME OF EXCAVATION 7.5 ft/Elev 2536.5 ft LOGGED BY Seth Olsen CHECKED BY AT END OF EXCAVATION --- NOTES Groundwater was observed at 7.5'. AFTER EXCAVATION --- ATTERBERG ui a z W o LIMITS w = v �w �^ �� 0- �^LU ��- } z a 0-0 MATERIAL DESCRIPTION W CO w 0 0 z N z �z o U x O J� J DQ W.- Q W H H� U W V o Wv �J o-n U� m0> Y" �" H �g cng H c7 2z W Uz O o 20 0J QJ Qz wv U) a 0 U o_ - z 0 0.0 CL E: J a LEAN CLAY WITH SAND,(CL)brown,moist, medium dense U) w z ° GB 20 36 23 13 73 0 73%fines 1 m U Z Q K U W Q 2.5 GB o CLAYEY SAND, (SC)brown,dry,dense, DCP Test at 2.5' 2 U) 0 m U Z Q K Cn Uj a POORLY GRADED GRAVEL WITH SAND,COBBLES,(GP) a °'. moist,dense, Piezometer Installed at 9' z Q'w D 5.0 .° 0 0 J IB0 O V. Y Q o D: J U w o D: N 7.5 .o V o D: Q. 0 0�c� J O' 0 ° U) o D: z Bottom of test pit at 9.0 feet. z z J U 2 m 2 U W H O w 0 INNOVATE InnovateGeotechnical TEST PIT NUMBER TP-15 min1150 S Cloverdale Road,Ste.201 PAGE 1 OF 1 Boise,Idaho 83709 MTEMMAL Telephone:(208)484-1090 CLIENT Walsh Group PROJECT NAME James Ranch Subdivision PROJECT NUMBER 321026 PROJECT LOCATION Meridian, Idaho DATE STARTED 4/13/21 COMPLETED 4/13/21 GROUND ELEVATION 2546 TEST PIT SIZE inches EXCAVATION CONTRACTOR Wagner ft GROUND WATER LEVELS: EXCAVATION METHOD Backhoe a AT TIME OF EXCAVATION 7.00 ft/Elev 2539 ft LOGGED BY Seth Olsen CHECKED BY AT END OF EXCAVATION --- NOTES Groundwater was observed at 7'. AFTER EXCAVATION --- ATTERBERG a z w o LIMITS w d Hm W� �ZJ Hw ~� �Z () H Z O MATERIAL DESCRIPTION J g >0 0 z Q w w z Q w o H U w OU o wv �J an U� mO> Y" �" H �g cng H C7 �z W UZ O �O � Z � Q J QZ wv u D 0 0.0 a p U o_ E: J SILT WITH SAND, (ML)brown,moist, medium dense, Infiltration a Test at 2' 0 W z U U) 0 m U Z Q K U W 2.5 GB 0 72%fines 1 20 72 U) m CLAYEY SAND, (SC)brown,dry,dense,Cemented U Z K Cl) W Q F z W 5.0 0 0 POORLY GRADED GRAVEL WITH SAND,COBBLES,(GP) °0 brown,Some Cementation o• p. U Q•' , U o. � °'d. GB o'•D: Piezometer Installed at 8.5' 2 U O• a. 7 �o. - N 7.5 O•' N o aa. c� of o. Q o •. . J Bottom of test pit at 8.5 feet. 0 U) 0 z z z J U 2 m 2 U W 0 U w " INNOVATE InnovateGeotechnical TEST PIT NUMBER TP-16 min1150 S Cloverdale Road,Ste.201 PAGE 1 OF 1 Boise,Idaho 83709 MTEMMAL Telephone:(208)484-1090 CLIENT Walsh Group PROJECT NAME James Ranch Subdivision PROJECT NUMBER 321026 PROJECT LOCATION Meridian, Idaho DATE STARTED 4/13/21 COMPLETED 4/13/21 GROUND ELEVATION 2541 ft TEST PIT SIZE inches EXCAVATION CONTRACTOR Wagner GROUND WATER LEVELS: EXCAVATION METHOD Backhoe SZ AT TIME OF EXCAVATION 7.00 ft/Elev 2534 ft LOGGED BY Seth Olsen CHECKED BY AT END OF EXCAVATION --- NOTES Groundwater was observed at 7'. AFTER EXCAVATION --- ATTERBERG a z w o LIMITS w a- Hm W� �Z J Hw ~� �Z U H Z CL O MATERIAL DESCRIPTION J g >O 0 z Q w w z Q w o H U w OU o wv �J a n O� m0> Y" �" H �g cng H c7 2z W Uz O o 20 �� Z Q J Qz wv u d - 0 0.0 a p U o_ � J IL SILTY SAND,(SM)brown,moist, medium dense U) Uj w z 0 U) 0 m U) GB L 1 z w w Q 2.5 z 0 U) 0 m z WELL GRADED GRAVEL WITH SAND,(GW)brown, moist to W '�`. wet,dense Cl) ►. w • F Z w • ,. 0 �• •: 0 Q GB 5 0 Y ,.�• 75%gravel,25%sand,0%fines, Piezometer Installed at 8.5' 2 J U • w I , 17 LU U n • b. 7.5 N • Bottom of test pit at 8.5 feet. 0 U) z z z J U 2 m 2 U w 0 O w 0 mEn INNnVATE GEHTECHNICAE Appendix B U.S. STANDARD SIEVE SIZE 3" 1.5" 3/4" 3/8" #4 #10 #20 #40 #60 #100 #200 100 90 80 70 w } 60 m 0 z 50 U) Q a 40 z w U 30 Of w a 20 10 0 1000 100 10 1 0.1 0.01 0.001 GRAIN SIZE IN MILLIMETERS COBBLES GRAVEL I SAND SILT OR CLAY COARSE I FINE COARSE MEDIUM FINE INNOVATE James Ranch Subdivision H] Ell Boring/ Depth Content Gravel Sand Fines USCS _Symbol Test Pit (%I o) -o) (%I Class Soil Classification- I U L U GECTECHNICAL Date: TP-1 3 29 51 MIL Sandy Silt Sieve Analysis 5/11/2021 ❑ TP-2 0.5 20 54 ML Sandy Silt Results Figure. Project: TP-2 2.5 24 13 56 31 SC-SM Silty,Clayey Sand 321026 X TP-3 2.5 26 - - 59 CL Sandy Lean Clay Ada County, B � i 0 TP-4 1 18 - - 55 CL Sandy Lean Clay Idaho Client: Walsh Group U.S. STANDARD SIEVE SIZE 3" 1.5" 3/4" 3/8" #4 #10 #20 #40 #60 #100 #200 100 90 80 70 w } 60 m 0 z 50 Q a 40 z w U 30 w a 20 10 0 1000 100 10 1 0.1 0.01 0.001 GRAIN SIZE IN MILLIMETERS COBBLES GRAVEL I SAND SILT OR CLAY COARSE I FINE COARSE MEDIUM FINE INNOVATE James Ranch Subdivision Boring/:_Symbol_:_Test Pit_-___(feet)_ (%I__ o) o) (%I Class Soil Classification--- I U L U GECTECHNICAL Date: TP-5 2.5 24 4 41 55 CL Sandy Lean Clay Sieve Analysis 5/11/2021 ❑ TP-6 1.5 22 - - 60 ML Sandy Silt Results Figure. Project: At TP-6 3 4 49 50 1 SP Poorly Graded Sand with 321026 Gravel Ada County, X TP-7 1 22 - - 56 ML Sandy Silt Idaho Client: Walsh B -2 0 TP-8 2.5 21 30 61 9 SP-SC Poorly Graded Sand with Group Clay and Gravel U.S. STANDARD SIEVE SIZE 3" 1.5" 3/4" 3/8" #4 #10 #20 #40 #60 #100 #200 100 90 80 70 w } 60 m (D z 50 Q a 40 z U 30 w a 20 10 0 1000 100 10 1 0.1 0.01 0.001 GRAIN SIZE IN MILLIMETERS COBBLES GRAVEL I SAND SILT OR CLAY COARSE I FINE COARSE MEDIUM FINE INNOVATE James Ranch Subdivision Boring/ H] Ell GECTECHNICAL Date: TP-9 2.5 24 1 33 66 CL Sandy Lean Clay Sieve Analysis 5/11/2021 ❑ TP-10 1.5 21 - - 45 SM Silty Sand Results Figure. Poorly Graded Gravel with Project: TP-11 6.5 3 82 18 0 GP 321026 Sand Ada County, X TP-12 2.5 29 - - 62 ML Sandy Silt Idaho Client: Walsh B -3 TP-13 6 4 66 31 3 GP Poorly Graded Gravel with Group Sand U.S. STANDARD SIEVE SIZE 3" 1.5" 3/4" 3/8" #4 #10 #20 #40 #60 #100 #200 100 90 80 70 w } 60 m (D z 50 U) Q 0- 40 z w Ail 0 30 w a 20 10 0 1000 100 10 1 0.1 0.01 0.001 GRAIN SIZE IN MILLIMETERS COBBLES GRAVEL I SAND SILT OR CLAY COARSE I FINE COARSE MEDIUM FINE INNOVATE James Ranch Subdivision Sample Moisture IULU GECTECHNICAL Boring/ D., Date: _Symbol Test Pit ...(feet)... (%I... o) 6) o Class Soil Classification Sieve Analysis 5/11/2021 Results Figure: TP-14 1 20 73 CL Lean Clay with Sand Project: 321026 ❑ TP-15 2.5 20 72 ML Silt with Sand Ada County, B -4 Idaho Client: Walsh . TP-16 5.5 5 75 25 0 GW Well Graded Gravel with Group Sand 60 , , O 50 , , , G x ; w ; 0 40 ' z U , H 30 0 i i 20 , - G MH or OH 10 , CLW6 ML r OL 0 0 10 20 30 40 50 60 70 80 90 100 110 LIQUID LIMIT(LL) Sample Liquid Plastic INNOVATE James Ranch Subdivision Plasticity LISCS iprn Symbol Location Depth Limit Limit : Index(PI) ClassSoil GEGTEEHNIEAL Date: Atterberg 5/11/2021 TP-2 0.5' 29 23 6 ML Sandy Silt Limits Results Figure. ♦ Project: 321026 ❑ TP-4 1' 31 21 10 CL Sandy Lean Clay Ada County, B -5 Idaho Client: Walsh TP-14 1' 36 23 13 CL Lean Clay with Sand Group *Based on Sieve Analysis Results A M E R I C A N American Geotechnics Project Information T E C H N I C S Report to: Innovate Geotechnical Project: James Ranch Report Date: 4/23/2021 File No.: 02787.55 Material Information Date Sampled: April 2021 Sampled By: Client Date Received: 4/14/2021 Date Tested: 4/16 through 4/22/2021 SUMMARY OF LABORATORY RESULTS Lab Sample Depth Water %Passing Liquid Plasticity Soil Number Type (ft) Index Type Borehole Content #200 Limit Remarks o o (/o) Sieve (/o) 21-0159 TP-04 Bulk 0.5'-1.5' 21.1 76.8 34 10 ML -- 21-0160 TP-10 Bulk 1.0'-2.0' 24.7 75.9 36 5 ML -- Prepared By: Travis Thomsen American Geotechnics ATTERBERG LIMITS REPORT iM E R A A� .0 1o. T E ( H N I ( S CLIENT: Innovate Geotechnical PROJECT NAME:James Ranch FILE NUMBER: 02787.55 PROJECT LOCATION:Ada County, Idaho 60 CL CH 50 x 40 w z 30 a J a 20 10 /000 CL-ML m ML MH 0 0 20 40 60 80 100 LIQUID LIMIT(%) Specimen Identification MC LL PL PI Fines Classification • TP-04 Bulk 0.5 21.1 34 24 10 77 SILT with SAND (ML) m TP-10 Bulk 1.0 24.7 36 31 5 76 SILT with SAND (ML) Prepared By: Travis Thomsen American Geotechnics PARTICLE-SIZE DISTRIBUTION REPORT iM E R� A� .0 1�. TECHNICS CLIENT: Innovate Geotechnical PROJECT NAME:James Ranch FILE NUMBER: 02787.55 PROJECT LOCATION:Ada County, Idaho U.S.SIEVE OPENING IN INCHES U.S.SIEVE NUMBERS I HYDROMETER 6 4 3 2 1.5 3/4 1/2 3 4 6 810 14 16 20 30 40 50 60 100 140 200 100 95 90 85 80 75 70 65 x w 60 � 55 m 0r w 50 z LL z 45 w 40 w a 35 30 25 20 15 10 5 0 100 10 1 0.1 0.01 0.001 GRAIN SIZE IN MILLIMETERS LCOBBLES GRAVEL SAND SILT OR CLAY coarse fine coarse medium fine Specimen Identification Classification D10 D30 D60 • TP-04 Bulk 0.5 SILT with SAND(ML) -- -- -- TP-10 Bulk 1.0 SILT with SAND(ML) -- -- -- Specimen Identification %Gravel %Sand %Fines D15 D50 D85 Cc Cu MC LL PI • TP-04 Bulk 0.5 5.0 18.2 76.8 -- -- 0.194 -- -- 21.1 34 10 m TP-10 Bulk 1.0 3.0 21.1 75.9 -- -- 0.356 -- -- 24.7 36 5 Prepared By: Travis Thomsen American Geotechnics American Geotechnics A M E R I C A N 5260 Chinden Blvd. MIr r Boise, Idaho 83714 Phone:(208) 658-8700 J W Fax: (208) 658-8703 T E C H N I C S Report To: Innovate Geotechnical Report Date: 4/22/2021 Project: James Ranch Date Sampled: April, 2021 Project No.: 02787.055 Date Received: 4/14/2021 Sample ID: TP-4, Bulk; 0.5'-1.5' Tested By: PC Soil Description: Silt with Sand (ML) Lab Number: 21-0159 R-VALUE IDAHO T-8 Point 1 Point 2 Point 3 Drainage Description Zero Zero Zero R-Value @ 200 PSI Dry Density, PCF 100.8 101.2 101.6 Exudation Pressure Moisture Content, % 22.4 21.8 21.3 Exudation, PSI 164 218 288 32 R-Value(Corrected) 19 37 50 Expansion, PSI 0.09 0.22 0.31 —N R-Value 200 psi Expansion Gradation: AASHTO T-11, T-27 4.0 9000 Screen %Passing %Passing 8000 Sizes As Received As Tested 4" 3.0 7000 3" N J 2" a 6000 100 3 tll 2! 2.0 5000 d 3/4" 99 a r 1/2" 99 4000 3/8" 98 No. 4 95 100 w 1.0 3000 w No. 8 2000 No. 16 No. 30 0.0 1000 No. 50 90 80 70 60 50 40 30 20 10 0 No. 100 R-Value(Corrected) No. 200 This report covers only material as represented by this sample and does not necessarily cover all soils from this layer or source. Reviewed By: Travis Thomsen American Geotechnics A M E R I ( A N 5260 Chinden Blvd. r Boise, Idaho 83714 Phone:(208) 658-8700 J Fax: (208) 658-8703 T E C H N I C S Report To: Innovate Geotechnical Report Date: 4/22/2021 Project: James Ranch Date Sampled: April, 2021 Project No.: 02787.055 Date Received: 4/14/2021 Sample ID: TP-10, Bulk; 1.0'-2.0' Tested By: PC Soil Description: Silt with Sand (ML) Lab Number: 21-0160 R-VALUE IDAHO T-8 Point 1 Point 2 Point 3 Drainage Description Zero Zero Zero R-Value @ 200 PSI Dry Density, PCF 92.8 93.5 94.0 Exudation Pressure Moisture Content, % 25.8 25.3 24.8 Exudation, PSI 88 186 386 55 R-Value(Corrected) 51 55 58 Expansion, PSI 0.40 0.62 0.92 el —N R-Value 200 psi Expansion Gradation: AASHTO T-11, T-27 4.0 9000 Screen %Passing %Passing 8000 Sizes As Received As Tested 4" 3.0 7000 3" N J 2" a L 6000 „ 1„ � 3 tll d 2.0 5000 d 3/4" a a r L 1/2" 4000 3/8" 100 X No. 4 97 100 w 1.0 3000 w No. 8 TIA 2000 No. 16 No. 30 0.0 1000 No. 50 90 80 70 60 50 40 30 20 10 0 No. 100 R-Value(Corrected) No. 200 This report covers only material as represented by this sample and does not necessarily cover all soils from this layer or source. Reviewed By: Travis Thomsen mEn INNnVATE GEHTECHNICAE Appendix C DCP TEST DATA-Sowers Project: James Ranch Subdivision Date: 13-Apr-21 Location: TP-2 @ 2.5' Soil Type(s): Silty,Clayey Sand No.of Accumulative Standard"N"Resistance(blows per foot) Blows Penetration (mm) (inches) 0 609.6 24.0 0.0 5.0 10.0 15.0 5 635 25.0 24.0 609.6 10 657.225 25.9 20 688.975 27.1 24.5 25.0 635 25.5 c E — E x 3 IL 26.0 660.4 a G W 0 26.5 27.0 685.8 27.5 28.0 L 711.2 0.0 5.0 10.0 15.0 Reference:George F.Sowers and Charles S.Hedges. Dynamic Cone for Shallow In-Situ Penetration Testing, Vane Shear and Cone Penetrations Resistance Testing of In-Situ Soils,ASTM STP 399,American Society of Testing and Materials,1966,pg.29. Figure C- 1 DCP TEST DATA-Sowers Project: James Ranch Subdivision Date: 13-Apr-21 Location: TP-3 @ 2.5' Soil Type(s): Sandy Lean Clay No.of Accumulative Standard"N"Resistance(blows per foot) Blows Penetration (mm) (inches) 0 609.6 24.0 0.0 5.0 10.0 15.0 5 655.6375 25.8 24.0 609.6 5 692.15 27.3 10 749.3 29.5 20 803.275 31.6 25.0 635 26.0 660.4 27.0 685.8 c E - E 3 3 H � W 28.0 711.2 d G W 0 29.0 736.6 30.0 762 31.0 787.4 32.0 812.8 0.0 5.0 10.0 15.0 Reference:George F.Sowers and Charles S.Hedges. Dynamic Cone for Shallow In-Situ Penetration Testing, Vane Shear and Cone Penetrations Resistance Testing of In-Situ Soils,ASTM STP 399,American Society of Testing and Materials,1966,pg.29. Figure C-2 DCP TEST DATA-Sowers Project: James Ranch Subdivision Date: 13-Apr-21 Location: TP-4 @ 2.5' Soil Type(s): Clayey Sand No.of Accumulative Standard"N"Resistance(blows per foot) Blows Penetration (mm) (inches) 0 609.6 24.0 0.0 5.0 10.0 15.0 20.0 10 660.4 26.0 25.0 635 10 676.275 26.6 20 703.2625 27.7 25.5 26.0 660.4 c E — E 3 3 w 26.5 a G W 0 27.0 685.8 27.5 28.0 711.2 0.0 5.0 10.0 15.0 Reference:George F.Sowers and Charles S.Hedges. Dynamic Cone for Shallow In-Situ Penetration Testing, Vane Shear and Cone Penetrations Resistance Testing of In-Situ Soils,ASTM STP 399,American Society of Testing and Materials,1966,pg.29. Figure C-3 DCP TEST DATA-Sowers Project: James Ranch Subdivision Date: 13-Apr-21 Location: TP-8 @ 2.5' Soil Type(s): Poorly Graded Sand No.of Accumulative Standard"N"Resistance(blows per foot) Blows Penetration (mm) (inches) 0 609.6 24.0 0.0 5.0 10.0 15.0 20.0 10 641.35 25.3 25.0 635 10 660.4 26.0 20 685.8 27.0 25.5 26.0 660.4 c E — E 3 3 w 26.5 a G W 0 27.0 685.8 27.5 28.0 711.2 0.0 5.0 10.0 15.0 Reference:George F.Sowers and Charles S.Hedges. Dynamic Cone for Shallow In-Situ Penetration Testing, Vane Shear and Cone Penetrations Resistance Testing of In-Situ Soils,ASTM STP 399,American Society of Testing and Materials,1966,pg.29. Figure C-4 DCP TEST DATA-Sowers Project: James Ranch Subdivision Date: 13-Apr-21 Location: TP-10 @ 3.5' Soil Type(s): Silty Sand No.of Accumulative Standard"N"Resistance(blows per foot) Blows Penetration (mm) (inches) 0 609.6 24.0 0.0 5.0 10.0 15.0 20.0 25.0 5 628.65 24.8 24.0 609.6 5 644.525 25.4 10 669.925 26.4 20 688.975 27.1 24.5 25.0 635 25.5 c E - E x 3 IL 26.0 660.4 W d 0 0 26.5 27.0 685.8 27.5 28.0 711.2 0.0 5.0 10.0 15.0 Reference:George F.Sowers and Charles S.Hedges. Dynamic Cone for Shallow In-Situ Penetration Testing, Vane Shear and Cone Penetrations Resistance Testing of In-Situ Soils,ASTM STP 399,American Society of Testing and Materials,1966,pg.29. Figure C-5 DCP TEST DATA-Sowers Project: James Ranch Subdivision Date: 13-Apr-21 Location: TP-14 @ 2.5' Soil Type(s): Clayey Sand No.of Accumulative Standard"N"Resistance(blows per foot) Blows Penetration (mm) (inches) 0 609.6 24.0 0.0 5.0 10.0 15.0 20.0 25.0 30.0 5 631.825 24.9 24.0 609.6 10 641.35 25.3 20 657.225 25.9 24.2 24.4 24.6 c 24.8 2 3 H � w 25.0 635 a G W 0 25.2 25.4 25.6 25.8 26.0 660.4 0.0 5.0 10.0 15.0 Reference:George F.Sowers and Charles S.Hedges. Dynamic Cone for Shallow In-Situ Penetration Testing, Vane Shear and Cone Penetrations Resistance Testing of In-Situ Soils,ASTM STP 399,American Society of Testing and Materials,1966,pg.29. Figure C-6 Ir INNOVATE G L 0 GEOTECHNICAL