Z - Project Final Acceptance Letter - Gem Innovation Schools Doublerock Road Water and Sewer Plan
◼
◼◼
September 21, 2021
Josh and Barbara Femreite - Members
Gem Innovation Schools Foundation, LLC
PO Box 86
Deary, ID 83823-0086
Bouma USA Management, LLC
445 Pettis Street Suite 201
Ada, MI, 49301
RE: Gem Innovation School Doublerock Road Water and Sewer Improvements – Final
Acceptance
Dear Josh and Barbara Femreite:
Installation of this project’s sanitary sewer and/or domestic water systems has been
satisfactorily completed in accordance with the approved plans. These systems have passed
the required testing in accordance with City of Meridian Standard Specifications and Drawings,
and therefore are hereby accepted by the City for ownership and normal maintenance.
Record drawings submitted to us for this project are also accepted and are being forwarded to
the Idaho Department of Environmental Quality. The engineer of record is responsible for
certification of the record drawings as to horizontal and vertical location of all public water and
sewer facilities installed.
In accordance with the City of Meridian’s Unified Development Code §11-5C-3, and the City of
Meridian’s Supplemental Specifications and Drawings to the Idaho Standards for Public Works
Construction, Current Edition, the installation and materials of the sewer and domestic water
systems are to be warranted against defect by the owner for a period of two-years from the date
of this letter.
Sincerely,
Warren Stewart, P.E.
City Engineer
cc. City Clerk
PW - Water Division
PW - Wastewater Division
PW - Construction Division
File