Loading...
Landscape DetailFile Location:g:\2021\121098\cad\_czc\210808 czc l100 landscape plan 121098.dwgLast Plotted By:elaine zabriskieDate Plotted:Friday, August 20 2021 at 02:50 PM CZCMeridian, Idaho 83642 1653 & 1761 S Meridian Road Epic Shine Overland and Meridian 8.20.2021121098CZCL1.50Landscape DetailsRevisions1.Date of Issuance:Project No.:Project Milestone:----1CONSTRUCTIONNOT FORNOTES:1.THE STAKING OF TREES IS TO BE THE CONTRACTOR'S OPTION; HOWEVER, THE CONTRACTOR ISRESPONSIBLE TO INSURE THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAINSTRAIGHT FOR A MINIMUM OF 1 YEAR. ALL STAKING SHALL BE REMOVED AT THE END OF THE ONEYEAR WARRANTY PERIOD.2.IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS, THE CONTRACTOR IS TONOTIFY THE LANDSCAPE ARCHITECT BEFORE PROCEEDING.3.LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TOINSTALLATION OF PLANT MATERIAL.4.WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THESTANDARD OR FIGURE EIGHT TYING METHOD. SECURE THE TIES TO THE STAKES WITHGALVANIZED NAILS TO PREVENT SLIPPAGE.5.WATER TREE TWICE WITHIN THE FIRST 24 HOURS.6.IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPEARCHITECT IMMEDIATELY.PREVAILING WIND DIRECTIONREMOVE DEAD/DAMAGED BRANCHES AND PRUNE TOINTERNATIONAL SOCIETY OF ARBORICULTURE STANDARDS;IMPROPERLY PRUNED TREES (AS DETERMINED BY THELANDSCAPE ARCHITECT) SHALL BE REMOVED AND REPLACED.SET ROOTBALL ON NATIVE UNDISTURBED SUBSOILCOMMERCIAL SLOW RELEASE FERTILIZER TABLETSBACKFILL WITH SOIL PLANTING MIX. SEESPECIFICATIONS FOR ADDITIONAL INFORMATION.MULCH LAYER, KEEP MULCH 3" AWAY FROMTRUNK2" x 2" x 8' CEDAR STAKE - DO NOT PENETRATE ROOTBALL.SEE NOTE 1. SET STAKES PARALLEL TO PREVAILING WIND.RUBBER CINCH TIEFINISH GRADEROOT PROBESOIL LINEUTILIZE SOIL/ROOT PROBE AROUND TRUNK(APPROX. 3-4" AWAY FROM TRUNK) TO LOCATEHIGHEST ROOTS. HIGHEST ROOTS SHOULD BEPOSITIONED AT OR SLIGHTLY ABOVE GRADE LEVEL.REMOVE BURLAP, TWINE, AND WIRE BASKET FROM TOP12 OF ROOTBALL, REMOVE ALL NAILS, TIES, AND PLASTICFROM ROOTBALL. IF SYNTHETIC BURLAP IS UTILIZED TOWRAP THE ROOTBALL, IT SHALL BE COMPLETELYREMOVED. ONLY BIODEGRADEABLE BURLAP SHALL BELEFT ON THE BOTTOM OF THE ROOTBALL.2x ROOTBALL DIAMETER3x ROOTBALL DIAMETER6"TREE WRAP TRUNK PROTECTION,REMOVE AFTER INSTALLATION3"1Deciduous Tree PlantingScale: NTSNOTES:1.THE STAKING OF TREES IS TO BE THE CONTRACTOR'S OPTION; HOWEVER, THE CONTRACTOR ISRESPONSIBLE TO INSURE THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAINSTRAIGHT FOR A MINIMUM OF 1 YEAR. ALL STAKING SHALL BE REMOVED AT THE END OF THE ONEYEAR WARRANTY PERIOD.2.IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS, THE CONTRACTOR IS TONOTIFY THE LANDSCAPE ARCHITECT BEFORE PROCEEDING.3.LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TOINSTALLATION OF PLANT MATERIAL.4.WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE STANDARD ORFIGURE EIGHT TYING METHOD. SECURE THE TIES TO THE STAKES WITH GALVANIZED NAILS TOPREVENT SLIPPAGE.5.WATER TREE TWICE WITHIN THE FIRST 24 HOURS.6.IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPEARCHITECT IMMEDIATELY.PREVAILING WIND DIRECTIONREMOVE DEAD/DAMAGED BRANCHES AND PRUNE TOINTERNATIONAL SOCIETY OF ARBORICULTURE STANDARDS;IMPROPERLY PRUNED TREES (AS DETERMINED BY THELANDSCAPE ARCHITECT) SHALL BE REMOVED AND REPLACED.SET ROOTBALL ON NATIVE UNDISTURBED SUBSOILCOMMERCIAL SLOW RELEASE FERTILIZER TABLETSBACKFILL WITH SOIL PLANTING MIX. SEESPECIFICATIONS FOR ADDITIONAL INFORMATION.MULCH LAYER, KEEP MULCH 3" AWAY FROMTRUNK2" x 2" x 8' CEDAR STAKE - DO NOT PENETRATE ROOTBALL.SEE NOTE 1. SET STAKES PARALLEL TO PREVAILING WIND.RUBBER CINCH TIEFINISH GRADEROOT PROBESOIL LINEUTILIZE SOIL/ROOT PROBE AROUND TRUNK(APPROX. 3-4" AWAY FROM TRUNK) TO LOCATEHIGHEST ROOTS. HIGHEST ROOTS SHOULD BEPOSITIONED AT OR SLIGHTLY ABOVE GRADE LEVEL.REMOVE BURLAP, TWINE, AND WIRE BASKET FROM TOP12 OF ROOTBALL, REMOVE ALL NAILS, TIES, AND PLASTICFROM ROOTBALL. IF SYNTHETIC BURLAP IS UTILIZED TOWRAP THE ROOTBALL, IT SHALL BE COMPLETELYREMOVED. ONLY BIODEGRADEABLE BURLAP SHALL BELEFT ON THE BOTTOM OF THE ROOTBALL.2x ROOTBALL DIAMETER3x ROOTBALL DIAMETER3"2Coniferous Tree PlantingScale: NTS4" MIN. DEPTH BACKFILL WITH SOIL PLANTINGMIX. SEE SPECIFICATIONS FORADDITIONAL INFORMATION.WATER RETENTIONBASINMULCH LAYERCOMMERCIALFERTILIZER TABLETS3Shrub PlantingScale: NTSNOTES:1. NOTIFY LANDSCAPE ARCHITECT WHEN PLACING BOULDERS FOR APPROVAL.2. PLACE BOULDERS PRIOR TO INSTALLATION OF IRRIGATION SYSTEM.3. CLEAN ALL BOULDERS OF DIRT AND LOOSE DEBRIS.4. WHEN PLACING BOULDERS, BURY 1/4 TO 1/3 OF BOULDER BELOW FINISH GRADE.5. DO NOT SCAR OR DAMAGE BOULDERS.FINISH GRADECOMPACTED SUBGRADE ASREQUIREDBOULDER, LOCATED, SIZE AND TYPE PERPLANS.SHRUB4Boulder InstallationScale: NTSA.CONTRACTOR SHALL REPORT TO LANDSCAPE ARCHITECT ALL CONDITIONS WHICHIMPAIR AND/OR PREVENT THE PROPER EXECUTION OF THIS WORK, PRIOR TOBEGINNING WORK.B.FINISH GRADES TO BE SMOOTH AND EVEN GRADIENTS WITH POSITIVE DRAINAGE INACCORDANCE WITH SITE GRADING PLAN. REMOVE RIDGES AND FILL DEPRESSIONS,AS REQUIRED TO MEET FINISH GRADES. PLACE 4" OF ROCK MULCH OVER SUBGRADESOIL TO ACHIEVE FINISH GRADE. FINISH GRADE RELATED TO ADJACENT SITEELEMENTS SHALL BE:B.A.1-INCH BELOW TOP OF ADJACENT PAVEMENT, VALVE BOX, VAULT, ETC.B.B.3-INCHES BELOW TOP OF CURB UNLESS NOTED OTHERWISE.C.ALL PLANTING BEDS SHALL HAVE A MINIMUM OF 18" OF TOPSOIL, SOD AREAS AMINIMUM OF 12" OF TOPSOIL. SPREAD, COMPACT AND FINE GRADE TOPSOIL TO ASMOOTH AND UNIFORM GRADE.D.RE-USE EXISTING SURFACE TOPSOIL WHERE POSSIBLE. VERIFY SUITABILITY OFSURFACE SOIL TO PRODUCE TOPSOIL MEETING REQUIREMENTS AND AMEND WHENNECESSARY. TOPSOIL SHALL BE A LOOSE, FRIABLE, SANDY LOAM, CLEAN AND FREEOF TOXIC MATERIALS, NOXIOUS WEEDS, WEED SEEDS, ROCKS, GRASS OR OTHERFOREIGN MATERIAL AND A PH OF 5.5 TO 7.0. IF ON-SITE TOPSOIL DOES NOT MEETTHESE MINIMUM STANDARDS, CONTRACTORS ARE RESPONSIBLE TO EITHER: A)PROVIDE APPROVED IMPORTED TOPSOIL, OR B.) IMPROVE ON-SITE TOPSOIL WITHMETHODS APPROVED BY LANDSCAPE ARCHITECT. SUPPLEMENT WITH IMPORTEDTOPSOIL WHEN QUANTITIES ARE INSUFFICIENT. CLEAN TOPSOIL OF ROOTS, PLANTS,SODS, STONES, CLAY LUMPS AND OTHER EXTRANEOUS MATERIALS HARMFUL TOPLANT GROWTH.E.IF IMPORTED TOPSOIL FROM OFF-SITE SOURCES IS REQUIRED, PROVIDE NEWTOPSOIL THAT IS FERTILE, FRIABLE, NATURAL LOAM, SURFACE SOIL, REASONABLYFREE OF SUBSOIL, CLAY LUMPS, BRUSH, WEEDS AND OTHER LITTER, AND FREE OFROOTS, STUMPS, STONES LARGER THAN 2 INCHES IN ANY DIMENSION, AND OTHEREXTRANEOUS OR TOXIC MATTER HARMFUL TO PLANT GROWTH.F.OBTAIN TOPSOIL FROM LOCAL SOURCES OR FROM AREAS HAVING SIMILAR SOILCHARACTERISTICS TO THAT FOUND AT PROJECT SITE. OBTAIN TOPSOIL ONLY FROMNATURALLY, WELL-DRAINED SITES WHERE TOPSOIL OCCURS IN A DEPTH OF NOTLESS THAN 4 INCHES.G.ALL LANDSCAPE AREAS SHALL BE WEED FREE AT THE TIME OF LANDSCAPEINSTALLATION.REMOVE ALL ROOTS, WEEDS, ROCKS AND FOREIGN MATERIAL ONTHE SURFACE.H.NEW TREE PLANTING, SEE DETAIL 3/L1.00. CONTRACTOR SHALL STAKE ALL TREESDEEMED NECESSARY, I.E..... FROM BEING BLOWN OVER, PLANTED WITH LOOSEROOT BALL, ETC. CONTRACTOR'S OPTION.I.NEW SHRUB PLANTING. SEE DETAIL 1/L1.00.J.ALL PLANT MATERIAL SHALL CONFORM TO THE AMERICAN NURSERYMANSTANDARDS FOR TYPE AND SIZE SHOWN. PLANTS WILL BE REJECTED IF NOT IN ASOUND AND HEALTHY CONDITION.K.ALL PLANT MATERIAL SHALL BE GUARANTEED FOR A PERIOD OF ONE YEARBEGINNING AT THE DATE OF SUBSTANTIAL COMPLETION. REPLACE ALL PLANTMATERIAL FOUND DEAD OR NOT IN A HEALTHY CONDITION IMMEDIATELY WITH THESAME SIZE AND SPECIES AT NO COST TO THE OWNER.L.TREE PIT BACKFILL PLANTING MIX: BLEND TOPSOIL AND SOIL AMENDMENTS ANDFERTILIZER FOR TREE PIT BACKFILL AT THE FOLLOWING RATES. BLENDAMENDMENTS THOROUGHLY WITH SOIL BACKFILL. TREE PITS SHALL BE 5'x5'x1.5'(37.5 CF/ 1.5 CY).L.A.APPLICATION RATES:L.A.A.HUMIC ACID: 25 LBS PER TREE PITL.A.B.COMMERCIAL GRADE COMPOST - 10 CUBIC FEET PER TREE PITL.A.C.PLANTING TABLET FERTILIZER - 4 TABLETS PER TREE PITL.A.D.CALCIFIED DIATOMACEOUS EARTH - 75 LBS PER TREE PITM.SHRUB PIT BACKFILL PLANTING MIX: BLEND TOPSOIL AND SOIL AMENDMENTS ANDFERTILIZER FOR SHRUB PIT BACKFILL AT THE FOLLOWING RATES. BLENDAMENDMENTS WITH THOROUGHLY WITH SOIL BACKFILL. SHRUB PITS SHALL BE2.5'x2.5'x1' (6.25 CF/ 0.25 CY).M.A.APPLICATION RATES:M.A.A.HUMIC ACID: 2 LBS PER SHRUB PITM.A.B.COMMERCIAL GRADE COMPOST - 2 CUBIC FEET PER SHRUB PITM.A.C.PLANTING TABLET FERTILIZER - 2 TABLETS PER SHRUB PITM.A.D.CALCIFIED DIATOMACEOUS EARTH - 15 LBS PER SHRUB PITN.IMMEDIATELY CLEAN UP ANY TOPSOIL OR OTHER DEBRIS ON THE SITE CREATEDFROM LANDSCAPE OPERATIONS AND DISPOSE OF PROPERLY OFF SITE.O.CONTRACTOR SHALL SUBMIT MATERIAL SAMPLES FOR LANDSCAPE ROCK MULCHTO LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO PROCUREMENT. LANDSCAPEBOULDERS, PHOTO SUBMITTAL IS ADEQUATE. FOR ROCK MULCH, SUBMIT 1 GALLONBAG SAMPLE TO OWNER.Landscape Notes:08/20/2021