Loading...
DR-2 East Elevation & Section543T.O. PARAPET28'-0"HEAD14'-0"FIN. FLR0'-0"11'-8"9'-2"1'-0"3'-7 1 2"3'-0"EQ.EQ.EQ.A6.13604609601603606607608601603605616616618PROJECT WORK AREALIMITS14'-3"1/4 x 1 1/2 1/4 x 1 1/21/4 x 1 1/23"A7.18601602611610612605603603605613614615620A7.14Drawn By:Checked By:Date:Scale:Job No.DATEREMARKSAUG 10, 202121121.00PERMIT & BIDDRAWING SHEET REVISIONSDRAWING SET ISSUED FORXCOPYRIGHT c 2021 Lindgren:LabrieArchitecture, pllc. Any use, reproduction ormodification of the documents or theinformation contained herein without theprior written permission of Lindgren:LabrieArchitecture, pllc violates the Copyrightlaws of the United States and will subjectthe violator to legal prosecution.Arch / Engineer StampSheet NumberAS SHOWN3525 E Longwing Ln, Ste # 160 Meridian, ID 83646 A-160 Devil & Angel Restaurant TISCALEEAST EXTERIOR ELEVATION13/16" = 1'-0"SCALEWALL SECTION3: 1/4"=1'-0"SHEET NOTESGENERAL NOTES#601.ALUMINUM FRAME BI-FOLD ENTRY DOOR ASSEMBLY (DARKBRONZE)602.ALUMINUM STOREFRONT WINDOW ASSEMBLY. (DARK BRONZE)603.(E) BRICK VENEER W/ NEW PAINT (WHITE)604.(E) CAST STONE BASE605.(E) CAST STONE ACCENT TRIM606.FUTURE ENTRY AWNING BY TENANT (SHOWN SHADED FORREFERENCE).607.DASHED LINE INDICATES GENERAL LOCATION OF FUTURE WALLSIGN BY TENANT.608.OUTLINE OF ROOF STRUCTURE BEYOND SHOWN FOR REFERENCEONLY.609.(E) LIGHT FIXTURES (TYP)610.FULL DEPTH BATT INSULATION AT (E) WALL CONSTRUCTION PERWALL TYPE.611.EXTEND GYP BD FINISH TO DECK AND FINISH AS SCHEDULED.612.(E) CAST STONE CORNICE & PARAPET CAP613.(E) CONCRETE FLOOR SLAB ON GRADE614.(E) CONCRETE PATIO PAVERS615.(E) FOUNDATION616.TRANSITION LINE BTWN PAINTED BRICK VENEER AND NATURALCOLOR BRICK VENEER617.(E) BRICK VENEER618.(E) PATIO RAILING MODIFIED AND PAINTED BLACK619.(E) PATIO RAILING MODIFIED PER PLAN620.(E) ROOF ASSEMBLY AND FRAMING621.SUSPENDED CEILING ASSEMBLY AS SCHEDULED622.SUSPENDED WALL FRAMING W/ DIAGONAL BRACING @ 4'-0" OC623.PARTITION WALL FRAMING PER PLAN624.EQUIPMENT PLATFORM625.GUARD WALL626.WALK-IN REFRIGERATOR AS SCHEDULED627.WALL PLANE CHANGE PER PLAN628.KITCHEN EQUIPMENT PER PLAN629.TOP OF PARTITION WALL FRAMING AND BRACING TODECK/STRUCTURE ABOVE.630.DOOR & FRAME ASSEMBLY AS SCHEDULED631.CEILING SOFFIT FRAMINGA.ITEMS, SYSTEM, & ASSEMBLIES SHOWN SCREENED OR INDICATEDAS (E) / EXISTING ARE TO REMAIN AND BE PROTECTED FROMDAMAGE DURING CONSTRUCTION UNLESS OTHERWISE NOTED.02'4'1'02'4'1'BGLSTAFFAS SHOWNDR-2EASTELEVATION &SECTIONSCALECOLORED RENDERING2N.T.S.PROJECT LOCATIONDevil & Angel TI