E N G I N E E R I N G
September 10,2021
Project No.21-024
City of Meridian
33 E Broadway Ave.,Ste.210
Meridian, Idaho 83642
RE: Quartet Northeast Subdivision No.2
Meridian,Idaho
To Whom It May Concern:
Please accept this letter as certification that the centerline elevations of the proposed streets within Quartet
Northeast Subdivision No. 2 are designed a minimum of three (3)feet above the seasonal high ground water
elevation. The groundwater report, "2021 Mid-Season Groundwater Report", prepared by Natural Resource
Solutions,LLC and dated July 21,2021,was used to determine the approximate groundwater elevations relative
to the street centerline elevations.
Please feel free to contact me at 208.639.6939 should you have questions or require any additional information.
Sincerely,
KM Engineering,LLP
SS\0 N A L fNc
E N SF�
Q Digitally signed by Lachlin C
Kinsella,P.E.
6860 Date:2021.09.10 07:36:36-06'00'
s� 9/10/21
37� 9TF 0 F 0
/N C. K\N�
Lachlin Kinsella, P.E.
Project Manger