Loading...
CC - Engineer Statement km E N G I N E E R I N G September 10,2021 Project No.21-024 City of Meridian 33 E Broadway Ave.,Ste.210 Meridian, Idaho 83642 RE: Quartet Northeast Subdivision No.2 Meridian,Idaho To Whom It May Concern: Please accept this letter as certification that the centerline elevations of the proposed streets within Quartet Northeast Subdivision No. 2 are designed a minimum of three (3)feet above the seasonal high ground water elevation. The groundwater report, "2021 Mid-Season Groundwater Report", prepared by Natural Resource Solutions,LLC and dated July 21,2021,was used to determine the approximate groundwater elevations relative to the street centerline elevations. Please feel free to contact me at 208.639.6939 should you have questions or require any additional information. Sincerely, KM Engineering,LLP SS\0 N A L fNc E N SF� Q Digitally signed by Lachlin C Kinsella,P.E. 6860 Date:2021.09.10 07:36:36-06'00' s� 9/10/21 37� 9TF 0 F 0 /N C. K\N� Lachlin Kinsella, P.E. Project Manger 5725 North Discovery Way • Boise,Idaho 83713 208.639.6939 • kmengllp.com