Loading...
ELEVATIONSIssue Date: Drawn By: Checked By: Project No. Revision ChID Issue Name Date JG. & AN. C. SLICHTER PLAN & ELEVATIONS A1.91 August 2021 CONSTRUCTION DOCUMENTS (CD) Print Date: August 26, 2021 COPYRIGHT © 2021 SLICHTER|UGRIN ARCHITECTURE 1750 W McMillan Road - Meridian, Idaho 83646BLACKHAWK/MERIDIAN LLCFANCI FREEZ SOLID WASTE ENCLOSURE2110408/26/202117'-4" 16'-0"1'-4"12'-8"16'-0" MINIMUM CLEARANCE 12'-0" MINIMUM CLEARANCECA1.91 AA1.91 BA1.91 DA1.91 2 A1.92 6 A1.92 8 A1.92 4 A1.92 4 A1.92 4 A1.92 1 A1.92 10 A1.92 9 A1.92 3 A1.92 042200.A 033000.B 4 A1.92 1 A1.922 A1.92 3 A1.92 053100.A 099113.A 4 A1.92 4 A1.92 042200.A KEYED/REFERENCE NOTES: KEYED NOTES: 2.19 REMOVE/RELOCATE OR REPLACE EXISTING TREE. 2.20 EXISTING PLANTINGS TO BE REMOVED, FIELD VERIFYLOCATIONS WITH NEW WORK AND REQUIRED ACCESS. 2.21 EXISTING CURB AND GUTTER TO REMAIN, PROTECTDURING CONSTRUCTION. 2.22 EXISTING ROCK MULCH. 2.23 DEMO CURB BACK TO EXISTING CUT LINE. FIELD VERIFY. 3.03 PRECAST CONCRETE CAP MATCH EXISTING, RE.DETAILING. 3.04 8" X 8" CONCRETE CURB (FULL WIDTH) AT BACK OFENCLOSURE, PROVIDE W/ (2) #5 HORIZONTAL REBAR. 3.05 SEE ENLARGED SITE 1/A1.11 FOR CONCRETE APRONLAYOUT. 6.01 PROVIDE AT BACK AND SIDES, ATTACHED WITH (2) 5/8"EMBED/EXPANSION ANCHORS AT 48" O.C. REFERENCE NOTES: 04 MASONRY: 042200.A COMB-FACE UNIT MASONRY 05 METALS: 053100.A STEEL DECKING 09 FINISHES: 099113.A EXTERIOR PAINTING SCALE: 1/4" = 1'-0"1SOLID WASTE ENCLOSURE PLAN SCALE: 1/4" = 1'-0"CSIDE ELEVATION 1 SCALE: 1/4" = 1'-0"AFRONT ELEVATION SCALE: 1/4" = 1'-0"BREAR ELEVATION SCALE: 1/4" = 1'-0"DSIDE ELEVATION 2 NOT TO SCALE 3EXISTING SITE PHOTO NOT TO SCALE 2EXISTING SITE PHOTO 2.202.20 2.16 2.18 2.23 2.23 2.21 2.18 2.202.202.20 2.19 3.03 3.05 2.19 6.01 3.04 3.07