2021_0709_dovetail_partial_elevationPT-1 S-1: SW7036 ACCESSIBLE BEIGE
S-2: SW7038 TONY TAUPE
S-3: SW7048 URBANE BRONZE
L-1: SW7048 URBANE BRONZE
ALTERNATE "GREEN" SCHEME
PALETTE
PT-2 S-1: SW9184 FOXHALL GREEN
S-2: SW7038 TONY TAUPE
S-3: SW9184 FOXHALL GREEN
L-1: SW9184 FOXHALL GREEN
ALTERNATE "BLUE" SCHEME
PALETTE
PT-3 S-1: SW6244 NAVAL
S-2: SW7038 TONY TAUPE
S-3: SW6244 NAVAL
L-1: SW6244 NAVAL
PAINT SCHEME PT-2
OR PT-3 BEYOND
- - 5:12 ROOF SLOPE _=
NARROW BATTEN AT
SECOND AND THIRD
FLOOR.
PAINT SCHEME PT-1
B
i
f
SHADOW
SECONDFLASHING DETAIL AT--J
•••
GROUNDWIDE BATTEN AT
••R
3:12 ROOF DORMER TO
ACCENTUATE PRIMARY
BUILDING ENTRY
5:12 ROOF SLOPE
IL
ROOF DORMER AT PRIMARY ENTRY
17
M
N
co
SCALE: NTS
Dovetail Meridian Pine Subdivision, Meridian, ID PIVOT NORTH
PNa JOB # 20-052 architecture