CC - Storm Drainage Calcs STORM DRAINAGE REPORT AND CALCULATIONS FOR EDINGTON COMMONS SUBDIVISION NO. 2 3610 N. LINDER ROAD MERIDIAN, IDAHO \o r_ v�GEN,3 PREPARED BY: 16970 CORINNE M GRAHAM, PE August 1 1 , 2021 cSw C I V I L S I T E w o a is s PO BOX 6059 BOISE, ID 83707 (208) 946-3874 cgraham@cswengineering.com INTRODUCTION The existing 5.75-acre site for the Edington Commons Subdivision No. 2 is currently vacant agricultural ground.The proposed development includes 46 single family residential lots, 9 common lots, and associated public roads, landscaping, and utilities. HISTORIC DRAINAGE The existing project site sits northeast of the intersection of N. Linder Road and W. Ustick Road in Meridian.The Coleman lateral, an irrigation lateral owned by Settlers Irrigation District, lies in the northern part of the site. Historically the site drains from south to north towards the Coleman Lateral. Surficial soils are comprised of fat clays.At depths of 4-5 feet,free draining gravels with silt and sand were encountered during geotechnical exploration. Groundwater was encountered at depths of 6.9 -8.7' during geotechnical exploration and groundwater readings over the past year indicate groundwater depths as shallow as 5.5'. The shallow depth to groundwater limits the suitability of standard infiltration facilities.Therefore, shallow infiltration facilities are proposed to store and treat stormwater runoff. PROPOSED DRAINAGE The storm drainage calculations and design for the proposed improvements are intended to meet the requirements of ACHD's storm water policy. Storm water facilities are designed to store and treat runoff from a 100-year storm event and to pretreat the water quality volume defined as the 80t" percentile storm event. Storm water runoff from 45' behind the sidewalk, including residential driveways,will be conveyed to the public stormwater system to be owned and maintained by ACHD. Remaining lot drainage will be contained within individual lots. Basin#3 storm water runoff is conveyed via curb and gutter to drain inlets within the roadway then piped to a vertical sand filter.The water quality storm event (2-year) is conveyed through a sand and grease trap to the treatment bed where it is filtered through the vertical sand filter.The 100-year storm event bypasses the sand and grease trap and is conveyed directly to the percolation bed where it is stored and infiltrated. Storm water runoff for the remaining basins is conveyed via curb and gutter to shallow drain inlets within the roadway then conveyed to two bioretention swales where it is stored and infiltrated. APPENDICES • Drainage Basin Map • Storm Drainage Calculations • Project Geotechnical Report � I i i i 1 zz 1 � , i 1 , 1 BASIN BASIN #2 1 - i 1 1 ' 1 BASIN #3 1 � 1 c-SW i I N C I V I L S I T F— PO BOX 6069 EDINGTON COMMONS SUB NO. 2 50 0 50 100 BOISE,ID 83707 DRAINAGE BASIN MAP SCALE: 1• = 100' Ph. (208)946-3874 cgraham@cswengineering.com Prepared By: Corinne Graham, PE CSw August 11, 2021 CIVIL SITE Edington Commons Subdivision No. 2 Storm Drainage Calculations ACHD Basin Characteristics C Values Impervious =0.90 Landscape =0.20 Basin#1 Basin#2 Basin#3 Total Area (SF) 33715 49622 40285 Roadway Area (SF) 9921 15800 11432 Sidewalk Area (SF) 3030 3949 3487 House/Driveway Area (SF) 12309 15768 15328 Landscape Area (SF) 8455 14105 10038 C Value: 0.72 0.70 0.73 Catch Basin Calculations CB#3A CB#3B Total Area (SF) 30152 10133 Roadway Area (SF) 8792 2640 Sidewalk Area (SF) 2736 751 House/Driveway Area (SF) 11796 3532 Landscape Area (SF) 6828 3210 C Value: 0.74 0.68 ACHD Calculation Sheet for Finding Peak Discharge/Volume-Rational Method NOTE:This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology.These calculations shall establish a minimum requirement.The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. �Fps for Peak Dis Calculate Post-Development Flows(for pre-development flows,increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name ACHD Basin p1 2 Is area drainage basin map provided? YES (map must be included with stormwater calculations) 3 Enter Design Storm(100-Year or 25-Year With 100-Year Flood Route) 100 4 Enter number of storage facilities(25 max) 1 Click to Show More Subbasins ❑ Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin 1 Subbasin 2 3 4 5 6 7 8 9 10 5 Area of Drainage Subbasin(SF or Acres) SF 9,921 3,030 12,309 8,455 Acres 0.77 6 Determine the Weighted Runoff Coefficient(C) 0.90 0.90 0.90 0.20 C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avg1 0.72 7 Calculate Overland Flow Time of Concentration in Minutes(Tc)or use default User calculate 10 min 10 Min. Estimated Runoff Coefficients for Various Surface Type of Surface Runoff Coefficients"I 8 Determine the average rainfall intensity(i)from IDF Curve based on i RF 2.58 2.58 in hr Business Downtown areas 0.70-0.95 9 Calculate the Post-Development peak discharge(QPeak) Qp-k 1.45 1.45 cfs Urban neighborhoods 0.50-0.70 Residential Single Family 0.35-0.50 10 Calculate total runoff vol(V)(for sizing primary storage) V 1,938 1,938 ft Multi-family 0.60-0.75 V=CI(Tc=60)Ax3600 Residential(rural) 0.25-0.40 11 Calculate Volume of Runoff Reduction Vrr Apartment Dwelling Areas 0.70 Industrial and Commercial Enter Percentile Storm I(95th percentile=0.60 in) 80th 0.34 in Light areas 0.80 Enter Runoff Reduction Vol(95th Percentile=0.60-in x Area x C) Vrr 686 686 ft' Heavy areas 0.90 12 Detention:Approved Discharge Rate to Surface Waters(if applicable) 0.00 cfs Parks,Cemeteries 0.10-0.25 Playgrounds 0.20-0.35 Railroad yard areas 0.20-0.40 13 Volume Summary Unimproved areas 0.10-0.30 Surface Storage:Basin Streets Asphalt 0.95 Basin Forebay V 194 ft' Concrete 0.95 Primary Treatme nt/Sto rage Basin V 1,744 ft' Brick 0.95 Subsurface Storage Roofs 0.95 In Common Lot-No Sediment Factor Required V 1,938 1,938 ft' Gravel 0.75 Fields:Sandy soil Soil Type Slope A B C Flat:0-2% 0.04 0.07 0.11 Average:2-6% 0.09 0.12 0.15] Steep:>6% 0.13 0.18 0.23 Adapted from ASCE C:\Users\cgrah\Dropbox\Projects\21004 Edington Sub Ph2\Reports\Storm Drainage\ACHD_SD_CALCS 8/10/2021,8:19 PM Version 9.0,December 2016 ACHD Calculation Sheet for Sizing Bioswales & Borrow Ditches #REFI #REF! 1 Project Name ACHD Basin#1 2 Enter number of Bioswales/Borrow Ditches(25 max) 1 3 Design Storm 100 Weighted Runoff Coefficient C 0.72 Link to: #REF! 4 Area A(Acres) 0.77 acres #REF! #REF! Approved discharge rate for the given storm(if applicable) 0.00 cfs #REF! 5 Design Vol With 0%Sed for Swales V 1,938 1938 ft' #REF! 6 Length of Swale 150 ft 7 Infiltration Window?(Note:infiltration required if Longitudinal Slope<1%) Design Infiltration Rate 8.00 in/hr 8 Infiltration Window Width 2.00 ft 9 Set Swale Bottom Width b 2.00 ft 10 Set Swale Top Width 14.00 ft 11 Set Swale Depth y 2.00 ft 12 Swale Side Slopes H:1 Sxs 3.00 13 Calculate cross-sectional area Axs 16.00 16.00 ft2 2 Axs=y z+by 14 Total Swale Capacity Without Driveways 2,400 2400.00 ft' 15 Does it Have Capacity? OK 16 Time to Drain 9.7 9.69 hr 90%volume in 48-hours minimum OK Check Swale With Driveways 17 Avg.Driveway Fill Slope in Swale (H/V) ft/ft 18 Enter Total Number of Driveways ea 0.0 ft3 Deduct driveway slope 19 Enter Total Length of all Driveways ft 0.0 ft3 Deduct driveway length 20 Lost Swale Length From Trees,etc. ft 0.0 ft3 Deduct other 21 Adjusted Length of Infiltration Area 0.0 ft 22 Excess Capacity=Storage-Deductions-Runoff Volume (1,937.9) ft3 23 Is Capacity Good? 24 Time to Drain 0.0 hr 90%volume in 48-hours minimum OK C:\Users\cgrah\Dropbox\Projects\21004 Edington Sub Ph2\Reports\Storm Drainage\ACHD_SD_CALCS 8/10/2021,8:19 PM Version 9.0,December 2016 ACHD Calculation Sheet for Finding Peak Discharge/Volume-Rational Method NOTE:This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology.These calculations shall establish a minimum requirement.The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. �Fps for Peak Dis Calculate Post-Development Flows(for pre-development flows,increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name ACHD Basin p2 2 Is area drainage basin map provided? YES (map must be included with stormwater calculations) 3 Enter Design Storm(100-Year or 25-Year With 100-Year Flood Route) 100 4 Enter number of storage facilities(25 max) 1 Click to Show More Subbasins ❑ Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin 1 Subbasin 2 3 4 5 6 7 8 9 10 5 Area of Drainage Subbasin(SF or Acres) SF 15,800 3,949 15,768 14,105 Acres 1.14 6 Determine the Weighted Runoff Coefficient(C) 0.90 0.90 0.90 0.20 C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avgl 0.70 7 Calculate Overland Flow Time of Concentration in Minutes(Tc)or use default User calculate 10 min 10 Min. Estimated Runoff Coefficients for Various Surface Type of Surface Runoff Coefficients"I 8 Determine the average rainfall intensity(i)from IDF Curve based on i 2.58 2.58 in hr Business Downtown areas 0.70-0.95 9 Calculate the Post-Development peak discharge(QPeak) Qp-k 2.06 2.06 cfs Urban neighborhoods 0.50-0.70 Residential Single Family 0.35-0.50 10 Calculate total runoff vol(V)(for sizing primary storage) V 2,760 2,760 ft Multi-family 0.60-0.75 V=CI(Tc=60)Ax3600 Residential(rural) 0.25-0.40 11 Calculate Volume of Runoff Reduction Vrr Apartment Dwelling Areas 0.70 Industrial and Commercial Enter Percentile Storm I(95th percentile=0.60 in) 80th 0.34 in Light areas 0.80 Enter Runoff Reduction Vol(95th Percentile=0.60-in x Area x C) Vrr 977 977 ff' Heavy areas 0.90 12 Detention:Approved Discharge Rate to Surface Waters(if applicable) 0.00 cfs Parks,Cemeteries 0.10-0.25 Playgrounds 0.20-0.35 Railroad yard areas 0.20-0.40 13 Volume Summary Unimproved areas 0.10-0.30 Surface Storage:Basin Streets Basin Forebay V 276 f Asphalt 0.95 t' Concrete 0.95 Primary Treatme nt/Sto rage Basin V 2,484 ft' Brick 0.95 Subsurface Storage Roofs 0.95 In Common Lot-No Sediment Factor Required V 2,760 2,760 ft' Gravel 0.75 Fields:Sandy soil Soil Type Slope A B C Flat:0-2% 0.04 0.07 0.11 Average:2-6% 0.09 0.12 0.15] Steep:>6% 0.13 0.18 0.23 Adapted from ASCE C:\Users\cgrah\Dropbox\Projects\21004 Edington Sub Ph2\Reports\Storm Drainage\ACHD_SD_CALCS 8/10/2021,8:19 PM Version 9.0,December 2016 ACHD Calculation Sheet for Sizing Bioswales & Borrow Ditches #REFI #REF! 1 Project Name ACHD Basin#2 2 Enter number of Bioswales/Borrow Ditches(25 max) 1 3 Design Storm 100 Weighted Runoff Coefficient C 0.70 Link to: #REF! 4 Area A(Acres) 1.14 acres #REF! #REF! Approved discharge rate for the given storm(if applicable) 0.00 cfs #REF! 5 Design Vol With 0%Sed for Swales V 2,760 2760 ft' #REF! 6 Length of Swale 173 ft 7 Infiltration Window?(Note:infiltration required if Longitudinal Slope<1%) Design Infiltration Rate 8.00 in/hr 8 Infiltration Window Width 2.00 ft 9 Set Swale Bottom Width b 2.00 ft 10 Set Swale Top Width 14.00 ft 11 Set Swale Depth y 2.00 ft 12 Swale Side Slopes H:1 Sxs 3.00 13 Calculate cross-sectional area Axs 16.00 16.00 ft2 2 Axs=y z+by 14 Total Swale Capacity Without Driveways 2,768 2768.00 ft3 15 Does it Have Capacity? OK 16 Time to Drain 12.0 11.96 hr 90%volume in 48-hours minimum OK Check Swale With Driveways 17 Avg.Driveway Fill Slope in Swale (H/V) ft/ft 18 Enter Total Number of Driveways ea 0.0 ft3 Deduct driveway slope 19 Enter Total Length of all Driveways ft 0.0 ft3 Deduct driveway length 20 Lost Swale Length From Trees,etc. ft 0.0 ft3 Deduct other 21 Adjusted Length of Infiltration Area 0.0 ft 22 Excess Capacity=Storage-Deductions-Runoff Volume (2,759.9) ft3 23 Is Capacity Good? 24 Time to Drain 0.0 hr 90%volume in 48-hours minimum OK C:\Users\cgrah\Dropbox\Projects\21004 Edington Sub Ph2\Reports\Storm Drainage\ACHD_SD_CALCS 8/10/2021,8:19 PM Version 9.0,December 2016 ACHD Calculation Sheet for Finding Peak Discharge/Volume-Rational Method NOTE:This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement.The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Calculate Post-Development Flows(for pre-development flows,increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name ACHD Basin#3 2 Is area drainage basin map provided? YES (map must be included with stormwater calculations) 3 Enter Design Storm(100-Year or 25-Year With 100-Year Flood Route) 100 4 Enter number of storage facilities(25 max) Click to Show More Subbasins ❑ Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin 1 Subbasin 2 3 4 5 Subbasin 6 7 8 9 10 5 Area of Drainage Subbasin(SF or Acres) SF 11,432 3,487 15,328 10,038 Acres 0.92 6 Determine the Weighted Runoff Coefficient(C) 0.90 0.90 0.90 0.20 C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avg 0.73 7 Calculate Overland Flow Time of Concentration in Minutes(Tc)or use default 10 Usercalculate 10 Min. - Estimated Runoff Coefficients for Various Surfac 8 Determine the average rainfall intensity(i)from OF Curve based on Tc i EW 2.58 2.58 in hr Type of Surface Runoff Coefficients" Business 9 Calculate the Post-Development peak discharge(QPeak) Qpeak 1.73 1.73 cfs Downtown areas 0.70-0.95 Urban neighborhoods 0.50-0.70 10 Calculate total runoff vol(V)(for sizing primary storage) V 2,319 2,319 ft Residential Single Family 0.35-0.50 V=Ci(Tc=60)Ax3600 Multi-family 0.60-0.75 11 Calculate Volume of Runoff Reduction Vrr Residential(rural) 0.25-0.40 Apartment Dwelling Areas 0.70 Enter Percentile Storm I(95th percentile=0.60 in) 80th 0.34 in Industrial and Commercial Enter Runoff Reduction Vol(95th Percentile=0.60-in x Area x C) Vr, 821 821 ft' fight areas 0.80 12 Detention:Approved Discharge Rate to Surface Waters(if applicable) 0.00 cfs Heavy areas 0.90 Parks,Cemeteries 0.10-0.25 Playgrounds 0.20-0.35 13 Volume Summary Railroad yard areas 0.20-0.40 Surface Storage:Basin Unimproved areas 0.10-0.30 Basin Forebay V 232 ft' Streets Asphalt 0.95 Primary Treatment/StorageBasin V 2,087 ft' Concrete 0.95 Subsurface Storage Brick 0.95 Volume Without Sediment Factor(See BMP 20 Tab) V 2,319 2,319 ft' Roofs 0.95 Gravel 0.75 Fields:Sandy soil Soil Type Slope A B C fl' .. Flat:O-2% 0.04 0.07Average:2-6% 0.09 0.12 0Steep:>6% 0.13 0.18 0 Adapted from ASCE C:\Users\cgrah\Dropbox\Projects\21004 Edington Sub Ph2\Reports\Storm Drainage\Storm Drain Calc-Vertical Sand Filter 3 8/10/2021,8:20 PM Version 10.5,November 2018 ACHD Calculation Sheet for Sizing Vertical Sand Filters NOTE:This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement.The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Note this spreadsheet pulls information from the"Peak QV"tab Calculate Post-Development Flows(for pre-development flows,increase number of storage facilities to create new tab) User input in yellow cells. Project Name ACHD Basin#3 Enter number of Seepage Beds(25 max) 1 Design Storm Unlined Side 100'QV' Design Storm Lined Side 2 LQ,v QV TR55 Weighted Runoff Coefficient C 0.73 Link to: Area A(Acres) 0.92 acres Approved discharge rate(if applicable) 0.00 cfs 100 Year Storm Volume V 2,319 ftA3 2 Year Storm Volume V2 628 ftA3 ' Width of Unlined Side W 14.5 14.5 ft Width of Lined Side W2 4.0 ' Depth of Unlined Side D 4.0 ft Depth of Lined Side D2 4.0 ft Void Ratio of Drain Rock Voids 0.4 0.4 for 1.5"-2"drain rock and 3/4"Chips Design Infiltration Rate(8 in/hr max) Perc 8.00 in/hr Size of Perf Pipe(Perf 360°) Dia pipe 18 in Design Length of Unlined Side L 100 100 Design Length of Lined Side L 98 100 ft Time to Drain Unlined Side 2.2 hours 90%volume in 48-hours minimum - Length of WQ&Overflow Perf Pipes 98 117 ft Perf Pipe Checks.Qperf>=Qpeak; where Qperf=CdxAxV(2xgxH)