CC - Engineers Statement CIVIL SITE
CSW
W O R K S
August 10, 2021
City of Meridian
33 E. Broadway Ave.
Meridian, ID 83642
RE: Edington Commons Subdivision No. 2 Roadway Centerline Elevations
To Whom It May Concern:
I certify that all design street finish centerline elevations within Edington Commons Subdivision No. 2 as
shown in the stamped and signed subdivision improvement plans are set a minimum of three feet above
the highest established normal groundwater elevation.
Respectfully,
Corinne M. Graham, PE \oN,\L
Principal FENSFO
16970
�O��gTE OF 1DP,���
NNE M.C,Fz
PO BOX 6059
BOISE, ID 83707
(208) 946-3874
cgraham@cswengineering.com