CC - Storm Drainage Calcs TM 4VOMcNEIL ENGINEERING Economic and Sustainable ❑esigns,Professionals You Know and Trust 8610 South Sandy Parkway, Suite 200 Sandy, Utah 84070 801.255.7700 mcneilengineering.com DRAINAGE NARATIVE Gold Stream Subdivision 3220 E Victory Road Meridian, ID Project Number. 21070 Prepared for: Gold Stream LLC Jim Petersen 197 W 4860 S Salt Lake City, UT 84107 Prepared by: McNeil Engineering 8610 S. Sandy Parkway, Suite 200 Sandy, Utah 84070 May 17, 2021 1983-2021 Over 38 Years of Providing Quality Engineering &Surveying www.mcneilengineering.com 2 Summary The proposed Starbucks site is designed for no stormwater discharge to the public right of way due to the grades sloping away from Eagle and Victory Road. All storm water onsite will be retained and the calculations in Appendix A show retention requirements for the project site for the 100-year, 24-hour storm events. The storm water calculations included are for the Starbucks site only. A temporary berm to impound and retain storm water has been shown on sheet C2.01 of the construction drawings for water that will be collected part of the future development of lots 2 and 3. All stormwater facilities and calculations for the future lots will be provided at the time of site amendment application(s). 1983-2021 Over 38 Years of Providing Quality Engineering &Surveying www.mcneilengineering.com 3 Appendix A — Stormwater Calculations 1983-2021 Over 38 Years of Providing Quality Engineering & Surveying www.mcneilengineering.com STORM RUNOFF Title: Starbucks Meridian CALCULATION Scope: Site Drainage Design SHEET Tributary Area 1 Retention Facilities Mcneil Engineering Project No. Engineer: TJD Check: RJP 8610 S.Sandy Pkwy,Sandy, UT 1 21070 lAuthority: Meridian, ID IRev. No.: 0 Design Philosophy: The storm water runoff from the project site will sheet flow to the drive isles where stormwater fill flow in gutters to a curb cut where storm water will flow through a curb cut to a site retention basin sized for the 100-year storm. Area Identification Runoff Coefficient (A) (C) (C-A) Paved 5,106 sf (0.12 ac) 0.85 = 4,340 sf Roof Area 1,150 sf (0.03 ac) 0.90 = 1,035 sf Landscaped 1,664 sf (0.04 ac) 0.15 = 250 sf Total 7,920 sf (0.18 ac) 0.71 (ave) 5,625 sf Allowable Discharge Rate = 0.00 cfs/ac 100-Year, 24-Hour Storm: Allowable Peak Discharge = 0.00 cfs Time Rate Rainfall Q in Add'I Q in Total Q in Q out Storage (min) (in/hr) (Inches) (cfs) (cfs) (cfs) (cfs) (cf) 5 6.36 0.53 0.83 0.00 0.83 0.00 248 10 4.86 0.81 0.63 0.00 0.63 0.00 380 15 4.00 1.00 0.52 0.00 0.52 0.00 469 30 2.70 1.35 0.35 0.00 0.35 0.00 633 60 1.67 1.67 0.22 0.00 0.22 0.00 783 120 0.91 1.82 0.12 0.00 0.12 0.00 853 180 0.62 1.85 0.08 0.00 0.08 0.00 867 360 0.33 1.98 0.04 0.00 0.04 0.00 928 720 0.19 1 2.29 1 0.02 0.00 0.02 0.00 1,073 1440 0.10 1 2.46 1 0.01 0.00 0.01 0.00 1,153 Surface Storage Provided: Pond Area(sf) Depth (ft) Volume (cu.ft.) Basin 1 2328 1 1164 cf Total Surface Storage 1164 cf Total Retention Provided : 1,164 cf Total Retention Required : 1,153 cf STORM RUNOFF Title: Starbucks Meridian CALCULATION Scope: Site Drainage Design SHEET Tributary Area 2 Retention Facilities Mcneil Engineering Project No. Engineer: TJD Check: RJP 8610 S.Sandy Pkwy,Sandy, UT 1 21070 lAuthority: Meridian, ID IRev. No.: 0 Design Philosophy: The storm water runoff from the project site will sheet flow to the drive isles where stormwater fill flow in gutters to a curb cut where storm water will flow through a curb cut to a site retention basin sized for the 100-year storm. Area Identification Runoff Coefficient (A) (C) (C-A) Paved 1,395 sf (0.03 ac) 0.85 = 1,186 sf Roof Area 1,150 sf (0.03 ac) 0.90 = 1,035 sf Landscaped 3,765 sf (0.09 ac) 0.15 = 565 sf Total 6,310 sf (0.14 ac) 0.44 (ave) 2,786 sf Allowable Discharge Rate = 0.00 cfs/ac 100-Year, 24-Hour Storm: Allowable Peak Discharge = 0.00 cfs Time Rate Rainfall Q in Add'I Q in Total Q in Q out Storage (min) (in/hr) (Inches) (cfs) (cfs) (cfs) (cfs) (cf) 5 6.36 0.53 0.41 0.00 0.41 0.00 123 10 4.86 0.81 0.31 0.00 0.31 0.00 188 15 4.00 1.00 0.26 0.00 0.26 0.00 232 30 2.70 1.35 0.17 0.00 0.17 0.00 313 60 1.67 1.67 0.11 0.00 0.11 0.00 388 120 0.91 1.82 0.06 0.00 0.06 0.00 422 180 0.62 1.85 0.04 0.00 0.04 0.00 429 360 0.33 1.98 0.02 0.00 0.02 0.00 460 720 0.19 1 2.29 1 0.01 1 0.00 0.01 0.00 532 1440 0.10 1 2.46 1 0.01 0.00 0.01 0.00 571 Surface Storage Provided: Pond Area(sf) Depth (ft) Volume (cu.ft.) Basin 1 2294 0.5 574 cf Total Surface Storage 574 cf Total Retention Provided : 574 cf Total Retention Required : 571 cf STORM RUNOFF Title: Starbucks Meridian CALCULATION Scope: Site Drainage Design SHEET Tributary Area 3 Retention Facilities Mcneil Engineering Project No. Engineer: TJD Check: RJP 8610 S.Sandy Pkwy,Sandy, UT 1 21070 lAuthority: Meridian, ID IRev. No.: 0 Design Philosophy: The storm water runoff from the project site will sheet flow to the drive isles where stormwater fill flow in gutters to a curb cut where storm water will flow through a curb cut to a site retention basin sized for the 100-year storm. Area Identification Runoff Coefficient (A) (C) (C-A) Paved 5,086 sf (0.12 ac) 0.85 = 4,323 sf Roof Area 0 sf (0.00 ac) 0.90 = 0 sf Landscaped 5,647 sf (0.13 ac) 0.15 = 847 sf Total 10,733 sf (0.25 ac) 0.48(ave) 5,170 sf Allowable Discharge Rate = 0.00 cfs/ac 100-Year, 24-Hour Storm: Allowable Peak Discharge = 0.00 cfs Time Rate Rainfall Q in Add'I Q in Total Q in Q out Storage (min) (in/hr) (Inches) (cfs) (cfs) (cfs) (cfs) (cf) 5 6.36 0.53 0.76 0.00 0.76 0.00 228 10 4.86 0.81 0.58 0.00 0.58 0.00 349 15 4.00 1.00 0.48 0.00 0.48 0.00 431 30 2.70 1.35 0.32 0.00 0.32 0.00 582 60 1.67 1.67 0.20 0.00 0.20 0.00 720 120 0.91 1.82 0.11 0.00 0.11 0.00 784 180 0.62 1.85 0.07 0.00 0.07 0.00 797 360 0.33 1.98 0.04 0.00 0.04 0.00 853 720 0.19 1 2.29 1 0.02 0.00 0.02 0.00 987 1440 0.10 1 2.46 1 0.01 0.00 0.01 0.00 1,060 Surface Storage Provided: Pond Area(sf) Depth (ft) Volume (cu.ft.) Basin 1 2270 0.5 1135 cf Total Surface Storage 1135 cf Total Retention Provided : 1,135 cf Total Retention Required : 1,060 cf