2021-09-07 Parks - Pathways
Reviewer: Kim Warren / Pathways Project Manager
Planner Assigned: Sonya Allen
Project Name: Hatch Industrial File No: H-2020 0026 AZ,CPAM Date: 9/7/2021
The following will be required for development of the proposed project:
CONDITIONS OF APPROVAL - PATHWAYS
1. The project developer shall design and construct multi-use pathways consistent with the location and
specifications set forth in the Meridian Pathways Master Plan Map and Master Pathways Plan Document
Chapter 3). Any proposed adjustments to pathway alignment shall be coordinated through the Pathways
Project Manager.
2. Prior to Certificate of Occupancy the applicant shall submit a public access easement for a detached multi-
use pathway within the required landscape buffer along Linder Road. Easements shall be a minimum of 14’
wide (10’ pathway + 2’ shoulder each side). Because existing 7’ sidewalk on this property is new and in good
condition, no pathway construction shall be required with this development.
Use standard City template for public access easement. Submit all easements online through Citizen’s
Access Portal. Easement checklist must accompany any hard-copy easements submitted in person.
3. Construct multi-use pathways per typical paving section(s) shown in the Meridian Pathways Master Plan
Chapter 3.
4. The owner (or representative association) of the property affected by each public access easement shall
have an ongoing obligation to maintain the multi-use pathway.