Loading...
Application MaterialsApplicant name:JON CHATFIELD, CHATFIELD ARCHITECTURE Phone:(208) 921-9220 Applicant address:1911 MONTCLAIR DRIVE, BOISE, ID 83702 Email:jon@chatfieldarchitecture.com Owner name:AARON DOUGHTY, SILVER CREEK REAL ESTATE Phone:Fax: Owner address:1099 S WELLS STREET, MERIDIAN, ID 83642 Email:aaronrdoughty@gmail.com Administrative Applicant Information Type of Review Requested File number:A-2021-0168 Assigned Planner:Joseph Dodson Related Files: Subject Property Information Location/street address:1083 S WELLS ST Assessor's parcel number(s):R9627170090 Township, range, section:3N1E17 Agent name (e.g. architect, engineer, developer, representative):JON CHATFIELD Firm name:CHATFIELD ARCHITECTURE Phone:(208) 921-9220 Fax: Address:1911 MONTCLAIR DRIVE Email:jon@chatfieldarchitecture.com Contact name:JON CHATFIELD Phone:(208) 921-9220 Fax: Contact address:1911 MONTCLAIR DRIVE Email:jon@chatfieldarchitecture.com Project/Application Name:Silvercreek Office BLDG - DES, CZC Description of Work: CZC and Design Review for a new single story, 1,500 SF office building on 0.29 acres of land in the L-O zoning district; the project will add 12 new parking stalls to the community and 3 bicycle stalls located at 1083 S Well St., Meridian ID, 83642. Project Description Planning Division ADMINISTRATIVE APPLICATION 33 E Broadway Avenue, Suite 102ƔMeridian, Idaho 83642 Phone: (208)884-5533ƔFacsimile: (208) 888-6854ƔWebsite: www.meridaincity.org 1 APPLICATION TYPES Is this application exempt from fees?:No Certificate of Zoning Compliance - CZC:CHECKED Does project have prior approval?:No Does your project contain new construction and/or modifications to an existing building or the site?: Yes Design Review - DES:CHECKED ADDRESS VERIFICATION Address Verification Permit Number:LDAV-2021-0594 TYPE OF USE PROPOSED Office:CHECKED PUBLIC WORKS INFRASTRUCTURE Does this project require the extension of public infrastructure?:Yes AutoCAD Files and Public Utility plans will be submitted with:Building Permit Submittal I acknowledge deferral of the required checklist items, may require additional review time: CHECKED I agree to upload required checklist items with the building application:CHECKED PROPERTY INFORMATION General Location:Meridian ID Current Land Use:Undeveloped Total Acreage:0.287 Prior Approvals (File Numbers):No ZONING DISTRICT(S) L-O:CHECKED PROJECT INFORMATION Site Plan Date (MM/DD/YYYY):08.25.2021 Landscape Plan Date (MM/DD/YYYY):08.25.2021 Elevations Date (MM/DD/YYYY):08.25.2021 Percentage of Site Devoted to Building:17 Percentage of Site Devoted to Landscaping:10 Percentage of Site Devoted to Paving:63 Who will own and Maintain the Pressurized Irrigation System in this Development:Aaron Doughy Irrigation District:NA Primary Irrigation Source:NA Secondary Irrigation Source:NA Square Footage of Landscaped Areas to be Irrigated by City Water Connection:1000 Proposed Building Height:17 Existing Floor Area (If Applicable):0 Gross Floor Area Proposed:1563 Application Information 33 E Broadway Avenue, Suite 102ƔMeridian, Idaho 83642 Phone: (208)884-5533ƔFacsimile: (208) 888-6854ƔWebsite: www.meridaincity.org 2 Number of Standard Parking Spaces Provided:28 total; 12 new Number of Compact Parking Spaces Provided:0 Number of Employees:6 Number of Residential Units:0 Minimum Square Footage of Living Area (Excluding Garage):0 Gross Density:0 Net Density:0 In Reclaimed Water Buffer:No TIME EXTENSION INFORMATION Number of months extension:24 APPLICATION DISCLAIMER I have read and accept the above terms:CHECKED Your signature:Jon Chatfield 33 E Broadway Avenue, Suite 102ƔMeridian, Idaho 83642 Phone: (208)884-5533ƔFacsimile: (208) 888-6854ƔWebsite: www.meridaincity.org 3 Jon Chatfield | Owner Chatfield Architecture, LLC 1911 Montclair | Boise, ID 83702 (208) 921-9220 jon@chatfieldarchitecture.com 1 August 25, 2021 City of Meridian Planning and Zoning RE: Certificate of Zoning Compliance Dear City of Meridian, This CZC application is for a small single story, 1,500 SF office building in Meridian, ID. The address is 1083 S Well St., Meridian ID, 83642. The project is in an existing commercial office park on a small parcel surrounded by existing driveways and parking. This project will add 12 new parking stalls to the community and 3 bicycle stalls. New sidewalks will be installing around the entire perimeter of the building. The building will have stucco and wood lap siding exterior walls. The roof will have a flat section with sloped metal roofing over the entry. As mentioned, this project is located on a very small parcel, and I hope the design is pleasing to you. We have explored may options and feel this is the best solution. There is minimal landscaping on this project, so I have not hired a Landscape Architect yet. I will provide detailed landscaping plans with the building permit application. I hope this is acceptable to you. Please let me know if you have any questions or concerns. I respectfully ask that this application be granted. Sincerely, Jon Chatfield Chatfield Architecture, LLC GENERAL NOTES SITE PLAN: A. BEFORE PROCEEDING TO LAY OUT THE WORK, VERIFY LAYOUT INFORMATION SHOWN ON DRAWINGS, IN RELATION TO THE PROPERTY SURVEY AND EXISTING BENCHMARKS. IF DISCREPANCIES ARE DISCOVERED, NOTIFY ARCHITECT PROMPTLY. B. ENGAGE A LAND SURVEYOR OR PROFESSIONAL ENGINEER TO LAY OUT THE WORK USING ACCEPTED SURVEYING PRACTICES. C. ESTABLISH BENCHMARKS AND CONTROL POINTS TO SET LINES AND LEVELS AT EACH STORY OF CONSTRUCTION AND ELSEWHERE AS NEEDED TO LOCATE EACH ELEMENT OF PROJECT. D. ESTABLISH LIMITS ON USE OF PROJECT SITE. IF STAGING AREA IS NOT DESIGNATED ON PLANS, THEN COORDINATE LOCATION W ITH OWNER. E. ESTABLISH DIMENSIONS. DO NOT SCALE DRAWINGS TO OBTAIN REQUIRED DIMENSIONS. F. INFORM SUBCONTRACTORS OF LINES AND LEVELS TO WHICH THEY MUST COMPLY. G. CHECK THE LOCATION, LEVEL AND PLUMB, OF EVERY MAJOR ELEMENT AS THE WORK PROGRESSES. H. LOCATE AND LAY OUT CONTROL LINES AND LEVELS FOR STRUCTURES, BUILDING FOUNDATIONS, COLUMN GRIDS, AND FLOOR LEVELS, INCLUDING THOSE REQUIRED FOR MECHANICAL AND ELECTRICAL WORK. LEVEL FOUNDATIONS AND PIERS FROM TWO OR MORE LOCATIONS. KEY NOTES:# 1. XXX SUBJECT PROPERTY 1083 S WELLS ST. MERIDIAN ID 83642 OFFICE PARK COMMON USE TRASH FACILITY DESIGN PROJECT NUMBER PROJECT ARCHITECT B C D 1 2 3 4 AARON DOUGHTY ARCHITECT: B C D A A 5 1 2 3 4 5 J. Chatfield J. Chatfield PROJECT PHASE PROJECT NAME: 1911 MONTCLAIR | BOISE, ID 83702 | (208) 921-9220 OWNER: CONSULTANT: STAMP: PLOT DATE: SHEET NAME: DRAWN BY REVISIONS: PROJECT INFORMATION: NOT FOR CONSTRUCTION J. Chatfield SITE PLAN A001 21-11 1083 S WELLS ST. MERIDIAN, ID 08.25.2021 SILVERCREEK OFFICE BUILDING CZC PERMIT MARK DATE DESCRIPTION 1" = 30'-0" OVERALL SITE PLAN NORTH A. GENERAL PROJECT NOTES APPLY TO ALL SHEETS & SPECIFICATIONS. CONTRACTOR AND SUB-CONTRACTORS ARE TO REVIEW ALL CONTRACT DOCUMENTS AND COORDINATE THEIR SCOPE OF WORK WITH THE GENERAL CONTRACTOR AND OTHER SUB-CONTRACTORS. INFORMATION COMMON TO SEVERAL DRAWINGS MAY BE NOTED ON ONLY ONE. CONTRACTOR IS RESPONSIBLE FOR ENTIRE SET OF DOCUMENTS. B. IF INFORMATION ON SEPARATE SHEETS OR DETAILS INDICATE CONFLICTING INFORMATION OR QUESTIONS ABOUT THE SCOPE OF WORK OR DESIGN INTENT, THE CONTRACTOR IS TO NOTIFY THE ARCHITECT IMMEDIATELY BEFORE BIDS ARE FINALIZED TO CLARIFY SCOPE OF WORK. IF THE SCOPE OF WORK REMAINS UNCLEAR THEN THE CONTRACTOR OR SUB-CONTRACTOR IS INSTRUCTED TO PRICE AND PROVIDE THE MOST EXPENSIVE SCOPE OF WORK OPTION IN THEIR BID. C. WHERE CONFLICTING DIRECTION IS GIVEN WITHIN THE SPECIFICATIONS AND DRAWINGS THE CONTRACTOR IS TO NOTIFY THE ARCHITECT IMMEDIATELY BEFORE BIDS ARE FINALIZED TO CLARIFY SCOPE OF WORK. IF THE SCOPE OF WORK REMAINS UNCLEAR THEN THE CONTRACTOR OR SUB-CONTRACTOR IS INSTRUCTED TO PRICE AND PROVIDED THE MOST EXPENSIVE SCOPE OF WORK OPTION IN THEIR BID. D. COORDINATE CONSTRUCTION ACTIVITY WITH PROJECT SPECIFICATIONS. ALL SPECIFICATIONS, REFERENCED IN DRAWINGS OR NOT, SHALL BE PART THIS PROJECTS SCOPE OF WORK. MISNUMBERED (OR MISLABELED) SPECIFICATIONS OR REFERENCES ARE ALSO PART OF THIS PROJECTS SCOPE OF WORK AND SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT. THE CONTRACTOR IS RESPONSIBLE TO INCORPORATE ALL SPECIFICATIONS INTO THE PROJECTS SCOPE OF WORK. E. ALL BUILDING COMPONENTS & PRODUCTS ARE TO BE INSTALLED PER THE MANUFACTURER INTENDED USE AND WRITTEN RECOMMENDATIONS. THIS INCLUDES, BUT IS NOT LIMITED TO: REQUIRED CLEARANCES, REQUIRED ATTACHMENT TECHNIQUES, FASTENING METHODS & APPROVED SUBSTRATES. CONTACT ARCHITECT IMMEDIATELY BEFORE PROCEEDING WITH INSTALLATION OF COMPONENTS THAT DO NOT MEET THE MANUFACTURER'S RECOMMENDATIONS. F. WHEN APPLICABLE, PROTECT ITEMS THAT ARE TO BE SALVAGED TO THE OWNER. THESE INCLUDE BUT NOT LIMITED TO: WINDOWS, FRAMES, LIGHT FIXTURES, CEILING COMPONENTS, EQUIPMENT, MILLWORK, FIRE EXTINGUISHERS, CABINETS, AND CARPET. COORDINATE LOCATION AND TIME OF DELIVERY OF ITEMS TO BE RETURNED WITH THE OWNER. G. WHERE APPLICABLE ADJUST AND SUPPLEMENT EXISTING FIRE SPRINKLER SYSTEM AS REQUIRED TO COMPLY WITH APPLICABLE FIRE CODE. FIELD VERIFY EXISTING LOCATIONS PRIOR TO SUBMITTING SHOP DRAWINGS. H. SCREEN MECHANICAL SYSTEMS FROM TRANSFERRING DUST AND DEBRIS FROM PROJECT AREA TO THE REMAINDER OF THE BUILDING. I. DO NOT SCALE DRAWINGS. IF SPECIFIC DIMENSIONS ARE NEEDED CONSULT ARCHITECT. J. FIGURED DIMENSIONS TAKE PRECEDENCE OVER SCALED DRAWINGS. WHERE DISCREPANCIES OCCUR, THEY SHALL BE REPORTED TO ARCHITECT FOR RESOLUTION. K. DETAILED DRAWINGS AND LARGER SCALE DRAWINGS TAKE PRECEDENCE OVER SMALLER SCALE DRAWINGS. L. PROVIDE BLOCKING OR ATTACHMENT PLATES OR ANCHORS OR FASTENERS OF ADEQUATE SIZE AND NUMBER TO SECURELY ANCHOR EACH COMPONENT IN PLACE, ACCURATELY LOCATED AND ALIGNED WITH OTHER PORTIONS OF THE WORK. WHERE SIZE AND TYPE OF ATTACHMENTS ARE NOT INDICATED, VERIFY SIZE AND TYPE REQUIRED FOR LOAD CONDITIONS. M. PROVIDE WALL BACKING FOR ALL WALL MOUNTED BUILDING COMPONENTS, SUCH AS BUT NOT LIMITED TO MILLWORK, BATHROOM ACCESSORIES, HANDRAILS, LADDERS, SHELVING & ELECTRONIC DEVICES. PROVIDE BACKING OF ADEQUATE SIZE AND NUMBER TO SECURELY ANCHOR EACH COMPONENT IN PLACE. WHERE SIZE AND TYPE OF ATTACHMENTS ARE NOT INDICATED, VERIFY SIZE AND TYPE REQUIRED WITH ARCHITECT FOR LOAD CONDITIONS. N. THE DRAWINGS INDICATE LOCATION, DIMENSIONS, REFERENCE, AND TYPICAL DETAILS OF CONSTRUCTION. THE DRAWINGS DO NOT INDICATE EVERY CONDITION. WORK THAT IS NOT SPECIFICALLY DETAILED SHALL BE OF CONSTRUCTION SIMILAR TO PARTS THAT ARE DETAILED. O. SUBCONTRACTORS FOR EACH TRADE ARE ADVISED THAT INFORMATION PERTINENT TO THEIR WORK MAY OCCUR IN OTHER PORTIONS OF THE CONTRACT DOCUMENTS. ALL NOTES ARE TO BE REVIEWED AND APPLIED TO RELATED BUILDING DOCUMENTS. P. WHERE NO MATERIAL NOTES OCCUR, THE GRAPHIC MATERIAL INDICATION SHALL INDICATE MATERIAL TYPES AND ITEMS. SEE SYMBOL AND MATERIALS LIST ON THIS SHEET. Q. THE U. S. ENVIRONMENTAL PROTECTION AGENCY MUST BE NOTIFIED 10 WORKING DAYS IN ADVANCE FOR ALL RENOVATIONS THAT DISTURB 260 L.F. /160 SQ. FT. /35 CU. FT. OF ASBESTOS CONTAINING MATERIALS. R. ALL NEW CONSTRUCTION TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT ACCESSIBILITY GUIDELINES. S. UNLESS OTHERWISE INDICATED ALL DRAWINGS, NOTES WHICH DO NOT READ "N.I.C.", "EXISTING", OR "EXISTING TO REMAIN", OR "BY OTHERS" SHALL INDICATE NEW WORK WHICH SHALL BE CONTRACTOR FURNISHED AND CONTRACTOR INSTALLED. T. THE CONTRACTOR(S) SHALL KEEP ALL AREAS OF CONSTRUCTION CLEAN AND FREE OF DEBRIS. AFTER CONSTRUCTION IS COMPLETE, THE GENERAL CONTRACTOR SHALL PROVIDE FINAL CLEAN UP. ENFORCE REQUIREMENTS STRICTLY. DISPOSE OF MATERIALS LAWFULLY. U. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS FOR ACCURACY PRIOR TO COMMENCING WITH THE WORK. ANY DISCREPANCY SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT. V. FIELD MEASUREMENTS: TAKE FIELD MEASUREMENTS AS REQUIRED TO FIT THE WORK PROPERLY. RECHECK MEASUREMENTS BEFORE INSTALLING EACH PRODUCT. WHERE PORTIONS OF THE WORK ARE INDICATED TO FIT TO OTHER CONSTRUCTION, VERIFY DIMENSIONS OF OTHER CONSTRUCTION BY FIELD MEASUREMENTS BEFORE FABRICATION. COORDINATE FABRICATION SCHEDULE WITH CONSTRUCTION PROGRESS TO AVOID DELAYING THE WORK. W. THIS PROJECT MAY NOT BE OCCUPIED UNTIL IT RECEIVES A CERTIFICATE OF OCCUPANCY AND FIRE DEPARTMENT APPROVAL FROM GOVERNING JURISDICTION. X. COORDINATE STRUCTURAL, MECHANICAL, ELECTRICAL, AND FIRE PROTECTION REQUIREMENTS, ROUTING, AND FIELD VERIFY. Y. WHERE NEW CONSTRUCTION JOINS WITH EXISTING CONSTRUCTION, ALIGN FINISHED SURFACE OF NEW CONSTRUCTION WITH EXISTING CONSTRUCTION. Z. WHEN REQUIRED PROVIDE COPY OF FIRE-RESISTANCE RATING ASSEMBLIES TO THE STRUCTURAL INSPECTOR FOR VERIFICATION OF TESTING/LISTING COMPLIANCE AND TO INSPECT ASSEMBLY CONSTRUCTION THEREWITH. AA. ALL CONSTRUCTION ADDENDA, CHANGE ORDERS, OR DESIGN CLARIFICATIONS TO THOSE ITEMS REGULATED BY THE CODES MUST BE SUBMITTED TO THE FIELD INSPECTOR FOR REVIEW AND APPROVAL PRIOR TO COMMENCING WITH ANY OF THE PROPOSED WORK RELATED TO THE PROPOSED FIELD CHANGE. BB. EXAMINATION AND ACCEPTANCE OF CONDITIONS: BEFORE PROCEEDING WITH EACH COMPONENT OF THE WORK, EXAMINE SUBSTRATES, AREAS, AND CONDITIONS WITH INSTALLER OR APPLICATOR PRESENT WHERE INDICATED, FOR COMPLIANCE WITH REQUIREMENTS FOR INSTALLATION TOLERANCES AND OTHER CONDITIONS AFFECTING PERFORMANCE. RECORD OBSERVATIONS. CC. EXAMINE ROUGHING-IN FOR MECHANICAL AND ELECTRICAL SYSTEMS TO VERIFY ACTUAL LOCATIONS OF CONNECTIONS BEFORE EQUIPMENT AND FIXTURE INSTALLATION. EXAMINE WALLS, FLOORS, AND ROOFS FOR SUITABLE CONDITIONS WHERE PRODUCTS AND SYSTEMS ARE TO BE INSTALLED. VERIFY COMPATIBILITY WITH AND SUITABILITY OF SUBSTRATES, INCLUDING COMPATIBILITY WITH EXISTING FINISHES OR PRIMERS. DD. PROCEED WITH INSTALLATION ONLY AFTER UNSATISFACTORY CONDITIONS HAVE BEEN CORRECTED. PROCEEDING WITH THE WORK INDICATES ACCEPTANCE OF SURFACES AND CONDITIONS. EE. MAKE JOINTS OF UNIFORM WIDTH. WHERE JOINT LOCATIONS IN EXPOSED WORK ARE NOT INDICATED, ARRANGE JOINTS FOR THE BEST VISUAL EFFECT. FIT EXPOSED CONNECTIONS TOGETHER TO FORM HAIRLINE JOINTS. FF. GRAPHIC PATTERNS OR HATCHES SHOWN IN DRAWINGS REPRESENT CONSTRUCTION MATERIALS AND ARE NOT TO BE USED AS LITERAL CONSTRUCTION GUIDELINES. CONTRACTOR IS TO COORDINATE ALL MATERIAL LAYOUT PRIOR TO CONSTRUCTION AND PROVIDE WORK BASED ON MANUFACTURES RECOMMENDATIONS AND STANDARD CONSTRUCTION TECHNIQUES. IF QUESTIONS ARISE CONTACT ARCHITECT FOR INTERPRETATION PRIOR TO CONSTRUCTION. RIGID INSULATION (SECTION) ACOUSTIC/THERMAL INSULATION (SECTION) GRANULAR FILL CONCRETE MASONRY UNITS STEEL (SECTION) WOOD - FINISH (SECTION) LUMBER - FINISH (SECTION) CONCRETE (SECTION) DIMENSIONAL LUMBER CONTINUOUS (SECTION) DIMENSIONAL LUMBER BLOCKING (SECTION) COLUMN GRID LINE CENTER LINE DIMENSION LINE or ROOM TAG ROOM NAME ROOM NUMBER AREA OR VOLUME X-XXX X X-XXX X DETAIL - SECTION POSITION ON SHEET SHEET NUMBER DETAIL - PLAN POSITION ON SHEET SHEET NUMBER BUILDING SECTION POSITION ON SHEET SHEET NUMBER WALL SECTION POSITION ON SHEET SHEET NUMBER EXTERIOR ELEVATION POSITION ON SHEET SHEET NUMBER XX X-XXX INTERIOR ELEVATION POSITION ON SHEET SHEET NUMBER XX X X X X WALL TYPE TAG WINDOW TAG A-9 View Name 1/8" = 1'-0" DRAWING NUMBER DRAWING SCALE VIEW TITLE X'-XX" KEYNOTE DRAWING REVISION 1 LEVEL DATUM LEVEL NAME LEVEL ELEVATION X 0 XXX XXX XXX XX 123 LEVEL NAME X'-X" SPOT ELEVATIONELEVATION 10'-0" X X-XXX X X-XXX DRAWING NAME SILVERCREEK OFFICE BLD NOT FOR CONSTRUCTION 1911 MONTCLAIR | BOISE, ID 83702 | (208) 921-9220 SHEET INDEX: OWNER AARON DOUGHTY SILVERCREEK REALITY GROUP 1099 S WELLS ST. MERIDIAN, ID 83642 (208) 377-0422 ARCHITECT CHATFIELD ARCHITECTURE 1911 MONTCLAIR, BOISE, ID 83702 JON CHATFIELD (208) 921-9220 JON@CHATFIELDARCHITECTURE.COM STRUCTURAL ENGINEER ALLY STRUCTURAL ENGINEERS 3778 PLANTATION RIVER, SUITE 102 BOISE, IDAHO 83703 CRAIG BRASHER (208) 949-5993 CBRASHER@ALLYSTRUCTURAL.COM MECHANICAL ENGINEER TIKKER ENGINEERING 9384 WEST OVERLAND ROAD BOISE, IDAHO 83709 PAT SEGALE (208) 658-0218 ELECTRICAL ENGINEER E2CO CONSULTING ENGINEERS 800 SOUTH INDUSTRY WAY, SUITE 350 MERIDIAN, IDAHO 83642 JEFF SMITH (208) 378-4450 JSMITH@E2CO.COM CONTACT INFORMATION:GENERAL NOTES:RENDERING: VICINITY MAP: SYMBOL LEGEND: MATERIAL LEGEND: 1083 S WELLS STREET MERIDIAN, ID 83642 PROJECT INFORMATION: G000 CZC PERMIT08.25.2021 SHEET INDEX xx Sheet Name G000 COVER SHEET A001 SITE PLAN A100 SITE & FLOOR PLAN A200 EXTERIOR ELEVATIONS NORTH Address: 1083 S WELLS ST MERIDIAN , ID 83642 Subdivision: WYNDSTONE PLACE SUB Land Group Type: SUB Township/Range/Section: 3N1E17 Parcel: R9627170090 Primary Owner: 1099 S WELLS LLC Zone Code: L-O Total Acres: 0.291 Tax Code Area: 03 Instrument Number: 2016010200 Tax Parcel Location: LOT 09 BLK 01 WYNDSTONE PLACE SUB APPLICABLE CODES: 2018 INTERNATIONAL BUILDING CODE 2018 INTERNATIONAL EXISTING BUILDING CODE (IEBC) 2018 INTERNATIONAL RESIDENTIAL CODE 2018 INTERNATIONAL ENERGY CONSERVATION CODE (IECC) 2017 IDAHO STATE PLUMBING CODE 2015 UNIFORM PLUMBING CODE (UPC) 2018 INTERNATIONAL MECHANICAL CODE 2018 INTERNATIONAL FUEL GAS CODE 2017 NATIONAL ELECTRICAL CODE (NEC) 2018 INTERNATIONAL FIRE CODE (IFC) PARKING: 12 NEW STALLS FOR THIS BUILDING 1 EXISTING ACCESSIBLE STALL 3 BIKE PARKING STALLS A200A1 A200 A200 A200 C1 B1 D1 1 2 3 4 5 A B C D E 13' - 6"16' - 0"20' - 0"20' - 0" 69' - 6"5' - 0"15' - 0"4' - 6"7' - 0"7' - 6"34' - 0"10' - 3"10' - 3" 9' - 0"20' - 0"182 SF CONF. 56 SF RR 103 SF OFFICE 103 SF OFFICE 103 SF OFFICE 102 SF OFFICE 103 SF OFFICE 81 SF HALL PROPERTY LINEPROPERTY LINE 4' - 0"9' - 7"9' - 8" 81 SF HALL 71 SF BREAK 149 SF LOBBY 88 SF REC. 10' - 4"10' - 8"10' - 0"19' - 0" 189 SF OFFICE 232 SF OPEN OFFICE (3) BIKE STALLS38' - 9"32' - 11" 13' - 6" 6' - 9"36' - 4"(E) TREE TO REMAIN LANDSCAPE AREA WITH DRIP LINES TO LOW PLANTINS, TYPICAL ENTIRE SITE DESIGN PROJECT NUMBER PROJECT ARCHITECT B C D 1 2 3 4 AARON DOUGHTY ARCHITECT: B C D A A 5 1 2 3 4 5 J. Chatfield J. Chatfield PROJECT PHASE PROJECT NAME: 1911 MONTCLAIR | BOISE, ID 83702 | (208) 921-9220 OWNER: CONSULTANT: STAMP: PLOT DATE: SHEET NAME: DRAWN BY REVISIONS: PROJECT INFORMATION: NOT FOR CONSTRUCTION J. Chatfield SITE & FLOOR PLAN A100 21-11 1083 S WELLS ST. MERIDIAN, ID 08.25.2021 SILVERCREEK OFFICE BUILDING CZC PERMIT 3/16" = 1'-0" 1ST FLOOR PLAN SD XX AREA 1ST FLOOR RR 56.24 SF BREAK 70.96 SF HALL 81.46 SF REC.88.04 SF OFFICE 102.42 SF OFFICE 205.00 SF OFFICE 102.87 SF OFFICE 103.33 SF LOBBY 148.90 SF CONF.182.37 SF OFFICE 189.41 SF OPEN OFFICE 232.14 SF 1ST FLOOR: 13 1563.14 SF GRAND TOTAL 1563.14 SF ROOM AREA SCHEDULE MARK DATE DESCRIPTION N O R T H A. GENERAL NOTES APPLY TO ALL DRAWING SETS. RE: SHEET A500 FOR DOOR TYPES & SCHEDULE. RE: SHEET A501 FOR WINDOW TYPES. B. FIELD VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS. NOTIFY ARCHITECT IMMEDIATELY IF ANY CONFLICTS OR DISCREPANCIES OCCUR BEFORE PROCEEDING WITH WORK. C. CROSS REFERENCES SHOWN ON DRAWINGS DO NOT NECESSARILY INDICATE ALL LIKE CONDITIONS AND DO NOT LIMIT APPLICATION OF ANY DRAWING OR DETAIL. WHERE SPECIFIC DIMENSIONS, DETAILS, OR DESIGN INTENT CANNOT BE DETERMINED, CONSULT THE ARCHITECT PRIOR TO PROCEEDING WITH WORK. IF DESIGN INTENT REMAINS UNCLEAR THEN PROVIDE MOST EXPENSIVE OPTION IN BID. D. DIMENSIONS ARE TO GRID LINE OR FACE OF STRUCTURAL MEMBER UNLESS OTHERWISE NOTED. DOOR & WINDOW OPENING DIMENSIONS ARE TO ROUGH OPENING OR CENTERLINE OF OPENING. CONCRETE AND BRICK DIMENSIONS ARE GIVEN TO THE FACE OF CONCRETE OR MASONRY AND TO THE FACE OF ROUGH OPENINGS. E. UNLESS NOTED OTHERWISE, USE BASF MASTERSEAL NP 150 FOR SEALANT AT ALL EXTERIOR JOINTS. COORDINATE COLOR W/ ARCHITECT. GENERAL NOTES EXT. ELEVATIONS: 1. XXX KEYNOTES: 1ST FLOOR 0' -0" TO WALL 12' -0" ABCDE STUCCO LAP SIDING STUCCO MTL STANDING SEAM ROOF 1ST FLOOR 0' -0" TO WALL 12' -0" A B C D E LAP SIDING STUCCO MTL STANDING SEAM ROOF 1ST FLOOR 0' -0" TO WALL 12' -0" 12345 STUCCO LAP SIDING 1ST FLOOR 0' -0" TO WALL 12' -0" 1 2 3 4 5 STUCCO LAP SIDINGLAP SIDINGLAP SIDING DESIGN PROJECT NUMBER PROJECT ARCHITECT B C D 1 2 3 4 AARON DOUGHTY ARCHITECT: B C D A A 5 1 2 3 4 5 J. Chatfield J. Chatfield PROJECT PHASE PROJECT NAME: 1911 MONTCLAIR | BOISE, ID 83702 | (208) 921-9220 OWNER: CONSULTANT: STAMP: PLOT DATE: SHEET NAME: DRAWN BY REVISIONS: PROJECT INFORMATION: NOT FOR CONSTRUCTION J. Chatfield EXTERIOR ELEVATIONS A200 21-11 1083 S WELLS ST. MERIDIAN, ID 08.25.2021 SILVERCREEK OFFICE BUILDING CZC PERMIT 1/4" = 1'-0"A1 EAST ELEVATION 1/4" = 1'-0"B1 WEST ELEVATION 1/4" = 1'-0"C1 NORTH ELEVATION 1/4" = 1'-0"D1 SOUTH ELEVATION MARK DATE DESCRIPTION DESIGN PROJECT NUMBER PROJECT ARCHITECT B C D 1 2 3 4 AARON DOUGHTY ARCHITECT: B C D A A 5 1 2 3 4 5 J. Chatfield J. Chatfield PROJECT PHASE PROJECT NAME: 1911 MONTCLAIR | BOISE, ID 83702 | (208) 921-9220 OWNER: CONSULTANT: STAMP: PLOT DATE: SHEET NAME: DRAWN BY REVISIONS: PROJECT INFORMATION: NOT FOR CONSTRUCTION J. Chatfield RENDERINGS A900 21-11 1083 S WELLS ST. MERIDIAN, ID 08.25.2021 SILVERCREEK OFFICE BUILDING CZC PERMIT MARK DATE DESCRIPTION VIEW 1 VIEW 2 VIEW 3 VIEW 4