Loading...
ElevationsLEVEL 1 0' -0" LEVEL 1 0' -0" LEVEL 2 12' -0" LEVEL 2 12' -0" ABC B.O. ROOF DECK 25' -0" B.O. ROOF DECK 25' -0" EIFS WITH VERTICAL AND HORIZONTAL REVEALS METAL PANEL STOREFRONT CANOPY METAL COPING CAP LEVEL 1 0' -0" LEVEL 1 0' -0" LEVEL 2 12' -0" LEVEL 2 12' -0" 123459678 B.O. ROOF DECK 25' -0" B.O. ROOF DECK 25' -0" EIFS WITH VERTICAL AND HORIZONTAL REVEALS METAL PANEL STOREFRONT AND ENTRANCE CANOPYEIFS WITH VERTICAL AND HORIZONTAL REVEALS METAL PANEL STOREFRONT AND ENTRANCE CANOPY METAL COPING CAPMETAL COPING CAP LEVEL 1 0' -0" LEVEL 1 0' -0" LEVEL 2 12' -0" LEVEL 2 12' -0" 1 2 3 4 5 9678 B.O. ROOF DECK 25' -0" B.O. ROOF DECK 25' -0" EIFS WITH VERTICAL AND HORIZONTAL REVEALS STEEL DOORGARAGE DOORBOLLARD EIFS WITH VERTICAL AND HORIZONTAL REVEALS STEEL DOORGARAGE DOORBOLLARD METAL COPING CAPMETAL COPING CAP LOCATION OF METERS LEVEL 1 0' -0" LEVEL 1 0' -0" LEVEL 2 12' -0" LEVEL 2 12' -0" A B C B.O. ROOF DECK 25' -0" B.O. ROOF DECK 25' -0" EIFS WITH VERTICAL AND HORIZONTAL REVEALS METAL PANELSTOREFRONT CANOPY METAL COPING CAP Date Project Number 2775 W. Navigator Drive Suite #220 Meridian, ID 83642 208.616.1050 CONSULTANT STAMP SHEET TITLE SHEET NUMBER COPYRIGHT © 2019 6/15/2021 12:11:59 PMP102 ELEVATIONS AND PERSPECTIVETEN MILE CROSSINGFLEX BUILDING06.15.2021 Project Number Project Status No. Description Date 1/8" = 1'-0"1 EAST ELEVATION 1/8" = 1'-0"2 NORTH ELEVATION 1/8" = 1'-0"3 SOUTH ELEVATION 1/8" = 1'-0"4 WEST ELEVATION6PERSPECTIVE 1 5 PERSPECTIVE 2