Loading...
CC - Engineer Statement km E NGINEE RING September 1st,2021 Project No. 20-208 City of Meridian 33 E Broadway Ave.,Ste.210 Meridian, Idaho 83642 RE: TM Frontline Subdivision Meridian,Idaho To Whom It May Concern: Please accept this letter as certification that the centerline elevations of the proposed streets within TM Frontline Subdivision are designed a minimum of three(3)feet above the seasonal high ground water elevation. The geotechnical engineering report, "Geotechnical Investigation — Benchline Road", prepared by Atlas and dated April 2021, was used to determine the approximate groundwater elevations relative to the street centerline elevations. Please feel free to contact me at 208,639.6939 should you have questions or require any additional information. Sincerely, KM E Ineering,LLP Kelly hrer, P.E. Princi le Engineer 5725 North Discovery Way • Boise,Idaho 83713 • 208,639.6939 0 kmengllp.com km E N G I N E E R I N G September 1st, 2021 Project No. 20-208 City of Meridian 33 E Broadway Ave.,Ste.210 Meridian, Idaho 83642 RE: TM Frontline Private Road Meridian, Idaho To Whom It May Concern: Please accept this letter as certification that the centerline elevations of the proposed streets within TM Frontline Subdivision are designed a minimum of three(3)feet above the seasonal high ground water elevation. The geotechnical engineering report, "Geotechnical Investigation — Benchline Road", prepared by Atlas and dated April 2021, was used to determine the approximate groundwater elevations relative to the street centerline elevations. Please feel free to contact me at 208.639.6939 should you have questions or require any additional information. Sincerely, KM Ygineering,LLP Kelly hrer, P.E. Princi le Engineer 5725 North Discovery Way , Boise,Idaho 93713 0 208.639.6939 • kmengllp.com